Building

COMPREHENSIVE

For MAIN/GENERAL CONTRACTORS and eligible construction firms seeking DOLE-CSHP approval for specific projects.

Apply
Application Status Checker for Establishments
# CSHP Approved ID Company/ Establishment Name Project Name Project Location Status Date Submitted Application Current Location Remarks
1 DOLE_RO2_2025-06-03_2_HT43 11-16 CONSTRUCTION NCB-RO2-ISA02-25 REPLACEMENT O... See more SAN PABLO, ISABELA Approved 2025-06-01 20:02:13 completed Processed in 1 days.
2 DOLE_RO2_2025-06-04_3_M7MI FERDSTAR BUILDERS, INC. / 11-16 CONSTRUCTION (JV) NCB-RO2-ISA05-25 CONSTRUCTION ... See more ECHAGUE, ANGADANAN AND SAN GUILLERMO, ISABELA Approved 2025-06-01 20:06:23 Ready for Release Processed in 2 working days.
3 DOLE_RO2_2025-06-04_4_1E0L FERDSTAR BUILDERS, INC. / 11-16 CONSTRUCTION (JV) NCB-RO2-ISA06-25 CONSTRUCTION ... See more DINAPIGUE, JONES AND SAN AGUSTIN, ISABELA Approved 2025-06-01 20:10:50 Ready for Release Processed in 2 working days.
4 DOLE_RO2_2025-06-04_5_LM8O 11-16 CONSTRUCTION NCB-RO2-ISA01-25 CONSTRUCTION ... See more SAN AGUSTIN, ISABELA Approved 2025-06-01 20:17:46 Ready for Release Processed in 2 working days.
5 DOLE_RO2_2025-06-04_6_M3V1 FERDSTAR BUILDERS, INC. / BOLTRON BUILDERS CORP. (JV) NCB-RO2-ISA04-25 CONSTRUCTION ... See more CABAGAN, SAN PABLO AND SANTA MARIA, ISABELA Approved 2025-06-01 20:25:39 Ready for Release Processed in 2 working days.
6 DOLE_RO2_2025-06-03_1_W100 PRIME BUILT CONSTRUCTION & SUPPLY INFRA-NCB-NVIMO-15-25,PACKAGE ... See more BAYOMBONG, NUEVA VIZCAYA Approved 2025-06-01 23:38:37 completed Processed in 1 days.
7 PRIME BUILT CONSTRUCTION & SUPPLY INFRA-NCB-NVIMO-15-25,PACKAGE ... See more BAYOMBONG, NUEVA VIZCAYA Rejected 2025-06-02 00:04:13 Returned to Applicant CSHP Program not properly fill... See more
8 A-Czar18 Construction PB-CW-2025-015 - Improvement/C... See more Guinalbin, Aglipay, Quirino Rejected 2025-06-02 23:39:18 Returned to Applicant NO FILE UPLOAD AND NEED 1 SO A... See more
9 D-ZION DESIGN AND CONSTRUCTION Construction of Bugkalot High ... See more New Gumiad, Dupax Del Norte, Nueva Vizcaya Rejected 2025-06-03 00:06:58 Returned to Applicant NO FILE UPLOAD AND NEED 1 SO A... See more
10 J.A.M. Industrial Sales Installation of SFO Tank 327 Prenza Highway, Cauayan City, Isabela Rejected 2025-06-03 02:00:27 Returned to Applicant No signature of owner at PCAB ... See more
11 A-Czar18 Construction PB-CW-2025-015 - Improvement/C... See more Guinalbin, Aglipay, Quirino Rejected 2025-06-03 22:07:48 Returned to Applicant No testing certificate attache... See more
12 DOLE_RO2_2025-06-09_7_9UDK A-Czar18 Construction PB-CW-2025-015 - Improvement/C... See more Guinalbin, Aglipay, Quirino Approved 2025-06-04 00:58:19 Ready for Release Processed in 4 working days.
13 JMD-68 BUILDERS PB-CW-2025-047 - CONSTRUCTION ... See more SAN RAMON, AGLIPAY, QUIRINO Rejected 2025-06-04 18:52:53 Returned to Applicant Need 2 safety Officers and 2 f... See more
14 DOLE_RO2_2025-06-10_10_RLKU ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, INC. 2025-D3-RESTO-RNIS-BURGOS-PACK... See more BURGOS, ISABELA Approved 2025-06-04 18:53:12 Ready for Release Processed in 4 working days.
15 DOLE_RO2_2025-06-10_11_WUYS ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, INC. 2025-D3-RNIS-GAMU-PACKAGE 7: F... See more GAMU, ISABELA Approved 2025-06-04 18:58:18 Ready for Release Processed in 4 working days.
16 DOLE_RO2_2025-06-09_8_6RJW JMD-68 Builders PB-2025-029 - CONSTRUCTION/COM... See more BALLIGUI, MADDELA, QUIRINO Approved 2025-06-04 19:07:48 Ready for Release Processed in 3 working days.
17 DOLE_RO2_2025-06-09_9_K7RH JMD-68 Builders PB-2025-034 - CONSTRUCTION/COM... See more BANNAWAG, DIFFUN, QUIRINO Approved 2025-06-04 19:12:07 Ready for Release Processed in 3 working days.
18 SL Development Construction Corp REMAINING WORKS FOR THE TUGUEG... See more Tuguegarao City, Cagayan Province Rejected 2025-06-04 19:50:58 Returned to Applicant NO NC2 FOR ELECTRICIAN
19 CREST92 Construction & Development Corporation Concreting of Road along Zone ... See more Gosi Norte, Tuguegarao City, Cagayan Rejected 2025-06-04 20:07:54 Returned to Applicant must be 2 FA and 2 SO
20 DOUBLE-D CONSTRUCTION MARK L. SIRINGAN Rejected 2025-06-04 20:31:57 Returned to Applicant INCOMPLETE ATTACHED DOCUMENTS
21 ARSD CONSTRUCTION CORPORATION Proposed SPUP 5 Storey Dormito... See more SPUP Mabini St. Tuguegarao City Rejected 2025-06-04 20:42:21 Returned to Applicant INCOMPLETE ATTACHED DOCUMENTS
22 ARSD CONSTRUCTION CORPORATION Proposed SPUP 4 Storey Parking... See more SPUP Mabini St. Tuguegarao City Rejected 2025-06-04 20:46:19 Returned to Applicant INCOMPLETE ATTACHED DOCUMENTS
23 DOUBLE-D CONSTRUCTION CONSTRUCTION OF 3 CLASSROOMS, ... See more LINAO ELEMENTARY SCHOOL, TUGUEGARAO CITY Rejected 2025-06-04 20:56:12 Returned to Applicant NO NC2 FOR SCAFFOLDING, ELECT... See more
24 Habiling Construction Improvement of CBE Building fo... See more Bayombong, Nueva Vizcaya Rejected 2025-06-04 21:22:02 Returned to Applicant Template not duly filled up: ... See more
25 Habiling Construction 066-2024 Improvements of FMR S... See more Didipio,Kasibu,Nueva Vizcaya Rejected 2025-06-04 21:58:33 Returned to Applicant 1. Template not duly filled up... See more
26 DOLE_RO2_2025-06-10_12_LA3V Dkb construction Concreting of road at mabini, ... See more Mabini, baggao, cagayan Approved 2025-06-04 21:59:42 Ready for Release Processed in 4 working days.
27 SHANLEY CONSTRUCTION NCB-INFRA-1SA109-25-CARP-DARIS... See more San Agustin, Isabela Rejected 2025-06-05 01:30:59 Returned to Applicant must be 2 FA and 2 SO
28 DKB CONSTRUCTION CONCRETING OF ROAD AT MABINI, ... See more MABINI, BAGGAO, CAGAYAN Rejected 2025-06-05 01:48:58 Returned to Applicant DOUBLE ENTRY
29 MEGAEAST POWER CONSTRUCTION CORPORATION NATIONAL GRID CORPORATION OF T... See more LARION ALTO PINA BLANCA TUGUEGARAO Rejected 2025-06-05 19:03:07 Returned to Applicant 1. NO NOA,NTP, CONTRACT AGREEM... See more
30 RAMIKE CONSTRUCTION INFRA-NCB-CBIMO-01-25 CONSTRUC... See more sanchez mira, cagayan Rejected 2025-06-06 17:13:37 Returned to Applicant MUST BE 2 SO AND 2 FA
31 3JMS CONSTRUCTION PROPOSED TWO STOREY APARTMENT UGAC SUR, TUGUEGARAO CITY Rejected 2025-06-06 22:37:54 Returned to Applicant NO NC2 FOR WELDER, SCAFFOLDING... See more
32 CAMIA CONSTRUCTION DEVELOPMENT CORPORATION REHABILITATION OF BUGALLON PRO... See more Ramon, Isabela Rejected 2025-06-08 22:55:20 Returned to Applicant NO CHE TESTING CERT./ CHE OPER... See more
33 CAMIA CONSTRUCTION DEVELOPMENT CORPORATION REHABILITATION OF BUGALLON PRO... See more Ramon, Isabela Rejected 2025-06-08 22:55:27 Returned to Applicant DOUBLE ENTRY
34 CLG SHALOM BUILDERS INC. SBC CAUAYAN BR. GROUND FLR., NATIONAL HIGHWAY, DISTRICT 1, CAUAYAN, ISABELA Rejected 2025-06-09 00:40:56 Returned to Applicant DOUBLE-ENTRY
35 SL Development Construction Corp REMAINING WORKS FOR THE TUGUEG... See more Tuguegarao City, Cagayan Province Rejected 2025-06-09 01:25:00 Returned to Applicant CSHP TEMPLATE NOT PROPERLY FIL... See more
36 CLG SHALOM BUILDERS INC. SBC CAUAYAN BR. GROUND FLOOR, NATIONAL HIGHWAY, DISTRICT 1, CAUAYAN ISABELA Rejected 2025-06-09 01:33:56 Returned to Applicant nc2 scaffolding and First Aide... See more
37 DOLE_RO2_2025-06-10_16_B4OL DEKM CONSTRUCTION CONTRACT NO. INFRA-NCB-CBIMO 4... See more CUNIG, GATTARAN, CAGAYAN Approved 2025-06-09 02:21:23 Ready for Release Processed in 2 working days.
38 BY ADMIN/ VICTORIA CZARINNA L. ACOSTA PROPOSED NEW RENOVATION OF MAN... See more G/F SM CITY, BRGY. DISTRICT 2, CAUAYAN CITY, ISABELA Rejected 2025-06-09 17:51:59 Returned to Applicant NO NEED TO UPLOAD ONLINE IF BY... See more
39 BY ADMIN/ PAUL I. MANGANTULAO PROPOSED TWO STOREY APARTMENT ... See more DONA FONIE ST., BRGY. SAN FERMIN, CAUAYAN CITY, ISABELA Rejected 2025-06-09 18:00:05 Returned to Applicant NO NEED TO SUBLMIT ONLINE
40 ARSD CONSTRUCTION CORPORATION Proposed SPUP 4 Storey Parking... See more SPUP Mabini St. Tuguegarao City Rejected 2025-06-09 18:05:45 Returned to Applicant PLS REQ. BACKHOE, MIXER AND DU... See more
41 GELOAR CONSTRUCTION SERVICES CONCRETING CABATUAN TO RIVERSI... See more MABASA, DUPAX DEL NORTE, NUEVA VIZCAYA Rejected 2025-06-09 18:12:23 Returned to Applicant must be 2 fa and 2 so
42 GELOAR CONSTRUCTION SERVICES CONCRETING OF CEMENTERY FTMR, ... See more New Gumiad, Dupax Del Norte, Nueva Vizcaya Rejected 2025-06-09 18:19:06 Returned to Applicant MUST BE 2 FA AND 2 SO
43 GELOAR CONSTRUCTION SERVICES CONCRETING OF LAMO-INEANGAN RO... See more LAMO, DUPAX DEL SUR, NUEVA VIZCAYA Rejected 2025-06-09 18:24:10 Returned to Applicant MUST 2 FA AND 2 SO
44 DOLE_RO2_2025-06-10_13_948X GELOAR CONSTRUCTION SERVICES CONSTRUCTION OF PROTECTION WAL... See more MUNGUIA, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-06-09 18:26:49 Ready for Release Processed in 1 working days.
45 BENSON BUILDERS INFRA-NCB-NVIMO-16-25, PACKAGE... See more SOLANO, NUEVA VIZCAYA Rejected 2025-06-09 18:31:36 Returned to Applicant MUST BE 2 FA AND 2 SO
46 DOLE_RO2_2025-06-10_14_70KR CAB CONSTRUCTION AND SUPPLY INFRA-NCB-NVIMO-16-25,PACKAGE ... See more SOLANO, NUEVA VIZCAYA Approved 2025-06-09 18:36:38 Ready for Release Processed in 1 working days.
47 Proposed Commercial and Warehouse Building Proposed Commercial and Wareho... See more Caggay, Tuguegarao City Rejected 2025-06-09 18:38:37 Returned to Applicant INCOMPLETE ATTACHEMENT
48 GCT CONSTRUCTION INFRA-NCB-NVIMO-11-25, CONSTRU... See more ARITAO, NUEVA VIZCAYA Rejected 2025-06-09 18:42:19 Returned to Applicant must be 2 so and 2 fa
49 MAYHALIGUE CONSTRUCTION AND SUPPLY, INC. INFRA-NCB-NVIMO-16-25, PACKAGE... See more SOLANO, NUEVA VIZCAYA Rejected 2025-06-09 18:45:19 Returned to Applicant MUST BE 2 FA AND 2 SO
50 HBT BUILDERS Construction of Parai MP Hall ... See more LGU-DUPAX DEL NORTE, NUEVA VIZCAYA Rejected 2025-06-09 18:51:51 Returned to Applicant Recommended for Disapproval - ... See more
51 ARSD CONSTRUCTION CORPORATION Proposed SPUP 5 Storey Dormito... See more SPUP Mabini St. Tuguegarao City Rejected 2025-06-09 18:57:31 Returned to Applicant NO PCAB LICENSE, RULE 1020
52 DOLE_RO2_2025-06-10_17_8VXX JMD-68 BUILDERS PB-CW-2025-047 - Construction ... See more San Ramon, Aglipay, Quirino Approved 2025-06-09 19:09:48 Ready for Release Processed in 1 working days.
53 DOLE_RO2_2025-06-10_15_4CNM ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, INC. 2025-D3-RESTO-NIS-PACKAGE 1: R... See more AURORA, ISABELA Approved 2025-06-09 19:24:46 Ready for Release Processed in 1 working days.
54 DOLE_RO2_2025-06-11_21_C5GL PRIME BUILT CONSTRUCTION & SUPPLY INFRA-NCB-NVIMO-15-25, Package... See more BAYOMBONG, NUEVA VIZCAYA Approved 2025-06-09 19:58:23 Ready for Release Processed in 2 working days.
55 DOLE_RO2_2025-06-10_18_OO83 RDJD CONSTRUCTION CONCRETING OF NARURON ROAD(BIT... See more BITNONG, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-06-09 20:20:42 Ready for Release Processed in 1 working days.
56 DIAMOND J BUILDERS LUSOD INIP, NCB-INFRA-QIMO-13-... See more MADDELA, QUIRINO Rejected 2025-06-09 20:39:19 Returned to Applicant Based on DO. 252 series 2025 :... See more
57 J.A.N CONSTRUCTION BALLIGUI CIS, NCB-INFRA-QIMO-1... See more MADDELA, QUIRINO Rejected 2025-06-09 20:46:51 Returned to Applicant Based on DO. 252 series 2025 ... See more
58 DOLE_RO2_2025-06-10_19_A8EQ JPLC TRADING 2024-D3-CAPITAL OUTLAY -10: FU... See more ISABELA Approved 2025-06-09 23:13:04 Ready for Release Processed in 1 working days.
59 DOLE_RO2_2025-06-10_20_KJ04 JPLC TRADING 2024-D3-CAPITAL OUTLAY -1K: RE... See more ISABELA Approved 2025-06-09 23:18:04 Ready for Release Processed in 1 working days.
60 DOLE_RO2_2025-06-11_22_851J Bera construction Concreting of farm to.market r... See more Bagunot, baggao, cagayan Approved 2025-06-10 01:24:56 Ready for Release Processed in 2 working days.
61 DOLE_RO2_2025-06-11_23_SJC4 Bera construction Concreting of farm to market r... See more Agaman proper, baggao , cagayan Approved 2025-06-10 01:34:23 Ready for Release Processed in 2 working days.
62 Proposed Commercial and Warehouse Building Proposed Commercial and Wareho... See more Caggay, Tuguegarao City Rejected 2025-06-10 03:15:26 Returned to Applicant INCOMPLETE ATTACHEMENT
63 DOLE_RO2_2025-06-16_28_3POW RC CONSTRUCTION PB-INF-2025-02 CONSTRUCTION OF... See more TUGUEGARAO CITY Approved 2025-06-10 22:12:59 Ready for Release Processed in 4 working days.
64 DOLE_RO2_2025-06-13_24_3CNA DIAMOND J BUILDERS LUSOD INIP, NCB-INFRA-QIMO-13-... See more MADDELA, QUIRINO Approved 2025-06-11 01:04:20 Ready for Release Processed in 3 working days.
65 DOLE_RO2_2025-06-13_25_B29F J.A.N CONSTRUCTION BALLIGUI CIS, NCB-INFRA-QIMO-1... See more MADDELA, QUIRINO Approved 2025-06-11 01:08:52 Ready for Release Processed in 3 working days.
66 DOLE_RO2_2025-06-13_26_J0V7 D-ZION DESIGN AND CONSTRUCTION Construction of Bugkalot High ... See more New Gumiad, Dupax Del Norte, Nueva Vizcaya Approved 2025-06-11 03:02:53 Ready for Release Processed in 3 working days.
67 YZK BUILDERS Brgy. Ambatali, Ramon, Isabela Rejected 2025-06-11 16:59:00 Returned to Applicant LOI IS ONLY ATTACHED
68 YZK BUILDERS Design and Build of 20,000 bag... See more Brgy. Ambatali, Ramon, Isabela Rejected 2025-06-11 17:01:22 Returned to Applicant LOI IS ONLY ATTACHED
69 YZK BUILDERS Construction of Guard House at... See more Tumauini Isabela Rejected 2025-06-11 17:16:52 Returned to Applicant LOI OF INTENT IS ONLY ATTACHED
70 ALIGWA CONSTRUCTION SERVICES Improvement of Irrigation Cana... See more Didipio, Kasibu, Nueva Vizcaya Rejected 2025-06-11 17:42:18 Returned to Applicant incomplete attachments
71 ALIGWA CONSTRUCTION SERVICES Improvement of Irrigation Cana... See more Didipio, Kasibu, Nueva Vizcaya Rejected 2025-06-11 18:07:55 Returned to Applicant incomplete attachments and ple... See more
72 YZK BUILDERS Construction of Guard House at... See more Tumauini Isabela Rejected 2025-06-11 19:05:43 Returned to Applicant MUST BE 2 FA AND 2 SO
73 YZK BUILDERS Construction of Central Nurser... See more Tumauini Isabela Rejected 2025-06-11 20:33:32 Returned to Applicant MUST BE 2 FA AND 2 SO
74 YZK BUILDERS Construction of Guard House at... See more Tumauini Isabela Rejected 2025-06-11 20:34:40 Returned to Applicant Under DO 252, Series of 2025, ... See more
75 MASTER Z CONSTRUCTION SERVICES CONSTRUCTION OF CHB CANAL LINI... See more BINTAWAN SUR, VILLAVERDE, NUEVA VIZCAYA Rejected 2025-06-12 00:15:19 Returned to Applicant NC2 TRANSIT MIXER
76 MASTER Z CONSTRUCTION SERVICES CONSTRUCTION OF CHB CANAL LINI... See more BINTAWAN SUR, VILLAVERDE, NUEVA VIZCAYA Rejected 2025-06-12 00:38:09 Returned to Applicant nc2 transit mixer
77 D'Limitless Civil Engineering Construction Proposed Construction of Two (... See more Brgy. Ambalatungan, Santiago City Isabela Rejected 2025-06-12 01:35:38 Returned to Applicant SAFETY OFFICER AND FIRST AIDER... See more
78 D'Limitless Civil Engineering Construction Proposed Construction of Two (... See more Brgy. Ambalatungan, Santiago City Isabela Rejected 2025-06-12 01:39:52 Returned to Applicant ONLY OSH PERSONNEL AND NCII SK... See more
79 MASTER Z CONSTRUCTION SERVICES CONSTRUCTION OF RIVER WALL PHA... See more BINTAWAN SUR, VILLAVERDE, NUEVA VIZCAYA Rejected 2025-06-12 01:45:02 Returned to Applicant same Safety Officer and First ... See more
80 MASTER Z CONSTRUCTION SERVICES CONCRETING OF UNAON-STA LUCIA ... See more UNAON-STA. LUCIA, BAGABAG, NUEVA VIZCAYA Rejected 2025-06-12 02:49:14 Returned to Applicant same Safety Officer and First ... See more
81 JOCELYN M. TAGUINOD PROPOSED CONSTRUCTION OF TWO S... See more #87 CAMPOS STREET, CARITAN CENTRO TUGUEGARAO CITY, CAGAYAN Rejected 2025-06-12 19:33:38 Returned to Applicant simplified
82 Sifu J Builders Corporation WIDENING FARM TO MARKET ROAD P... See more Purok 3, Brgy. Tukod, Kasibu, Nueva Vizcaya Rejected 2025-06-12 20:19:05 Returned to Applicant no signature of project owner,... See more
83 DOLE_RO2_2025-06-13_27_BO9Q AMBAGUIO BUILDERS INFRA-NCB-NVIMO-15-25, PACKAGE... See more BAYOMBONG, NUEVA VIZCAYA Approved 2025-06-12 20:50:11 Ready for Release Processed in 1 working days.
84 DOLE_RO2_2025-06-16_29_QL2S OML CONSTRUCTION Construction of 2 Classrooms a... See more Libag, Tuguegarao City Approved 2025-06-12 21:49:44 Ready for Release Processed in 2 working days.
85 SL Development Construction Corp REMAINING WORKS FOR THE TUGUEG... See more Tuguegarao City, Cagayan Province Rejected 2025-06-12 22:47:48 Returned to Applicant NO SIGNATURE OF PROJECT OWNER,... See more
86 7CHIN BUILDERS AND CONSTRUCTION SUPPLY CME-45m, 24sqm, 320kph, 150D k... See more Benito Soliven, Isabela Rejected 2025-06-13 00:41:42 Returned to Applicant LETTER OF INTENT IS ONLY ATTAC... See more
87 MASTER Z CONSTRUCTION SERVICES REHABILITATION/CONSTRUCTION OF... See more BINTAWAN SUR & BINTAWAN NORTE, VILLAVERDE, NUEVA VIZCAYA Rejected 2025-06-15 18:13:14 Returned to Applicant same Safety Officer and First ... See more
88 MASTER Z CONSTRUCTION SERVICES UPGRADING/IMPROVEMENT OF PUROK... See more PUROK 1, SAN PABLO, DIADI, NUEVA VIZCAYA Rejected 2025-06-15 18:16:58 Returned to Applicant nc2 transit mixer
89 DOLE_RO2_2025-06-26_72_54X7 SHANLEY CONSTRUCTION NCB-INFRA-1SA109-25-CARP-DARIS... See more San Agustin, Isabela Approved 2025-06-15 20:46:12 Ready for Release BLURRED CERTIFICATE OF NCII SK... See more
90 ARSD CONSTRUCTION CORPORATION PROPOSED SPUP 4 STOREY PARKING... See more SPUP, MABINI ST., TUGUEGARAO CITY Rejected 2025-06-15 20:59:41 Returned to Applicant PLS REQ. BACKHOE, SIGNATURE OF... See more
91 ARSD CONSTRUCTION CORPORATION PROPOSED SPUP 5 STOREY DORMI... See more SPUP, MABINI ST., TUGUEGARAO CITY Rejected 2025-06-15 21:04:26 Returned to Applicant NO SIGNATURE OF CONTRACTOR (CS... See more
92 DOLE_RO2_2025-06-18_31_GA0P CAB CONSTRUCTION AND SUPPLY INFRA-NCB-NVIMO-16-25, PACKAGE... See more SOLANO, NUEVA VIZCAYA Approved 2025-06-16 00:08:13 Ready for Release Processed in 3 working days.
93 DOLE_RO2_2025-06-16_30_159N ACES 3 CONSTRUCTION NCB-INFRA-QIMO-01-25,P4-Repair... See more Aglipay, Quirino Approved 2025-06-16 00:08:49 Ready for Release Processed in 1 working days.
94 DOLE_RO2_2025-06-18_32_HRQV CAB CONSTRUCTION AND SUPPLY INFRA-NCB-NVIMO-15-25, PACKAGE... See more BAYOMBONG, NUEVA VIZCAYA Approved 2025-06-16 00:12:29 Ready for Release Processed in 3 working days.
95 DOLE_RO2_2025-06-18_33_MEPE GEOLAR CONSTRUCTION SERVICES CONCRETING CABATUAN TO RIVERSI... See more BRGY. MABASA, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-06-16 00:16:06 Ready for Release Processed in 3 working days.
96 DOLE_RO2_2025-06-18_34_30CE GEOLAR CONSTRUCTION SERVICES CONCRETING OF LAMO-INEANGAN RO... See more BARANGAY LAMO, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-06-16 00:19:17 Ready for Release Processed in 3 working days.
97 DOLE_RO2_2025-06-18_35_8V47 GEOLAR CONSTRUCTION SERVICES CONCRETING OF CEMENTERY FTMR, ... See more BRGY. NEW GUMIAD, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-06-16 00:22:31 Ready for Release Processed in 3 working days.
98 DOLE_RO2_2025-06-18_36_P8RT GCT CONSTRUCTION INFRA-NCB-NVIMO-11-25, CONSTRU... See more ARITAO, NUEVA VIZCAYA Approved 2025-06-16 00:30:21 Ready for Release Processed in 3 working days.
99 DOLE_RO2_2025-06-18_37_GD78 MAYHALIGUE CONSTRUCTION AND SUPPLY, INC. INFRA-NCB-NVIMO-16-25, PACKAGE... See more SOLANO, NUEVA VIZCAYA Approved 2025-06-16 00:34:40 Ready for Release Processed in 3 working days.
100 DOLE_RO2_2025-06-18_38_NG9X BENSON BUILDERS INFRA- NCB-NVIMO-16-25, PACKAG... See more SOLANO, NUEVA VIZCAYA Approved 2025-06-16 00:40:29 Ready for Release Processed in 3 working days.
101 DOLE_RO2_2025-06-20_43_L04P SILVERSKY CONSTRUCTION UPGRADING OF 1.90KM BINUANGAN-... See more BINUANGAN, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-06-16 00:46:08 Ready for Release Processed in 5 working days.
102 TATUM CONSTRUCTION CONCRETING OF I.650KM YABBI FT... See more BRGY. YABBI, DUPAX DEL NORTE, NUEVA VIZCAYA Rejected 2025-06-16 00:51:44 Returned to Applicant EXPIRED PCAB
103 D'Limitless Civil Engineering Construction Proposed Construction of Two (... See more Brgy. Ambalatungan, Santiago City Isabela Rejected 2025-06-16 03:08:58 Returned to Applicant OSH PERSONNEL( SAFETY OFFICER ... See more
104 Robert Frederick/ Marietta Bastable Proposed 3-storey Residential ... See more Grand Victoria Heights Subd. Libag Norte Tuguegarao City Rejected 2025-06-16 18:06:27 Returned to Applicant SIMPLIFIED
105 Radiance Solar Solutions Inc. 65MW San Pablo Solar Power Pro... See more Brgy. Annanuman San Pablo Isabela Rejected 2025-06-16 18:57:09 Returned to Applicant MUST BE 2 FA AND 2 SO (COSH NO... See more
106 DOLE_RO2_2025-06-18_39_VMK8 JIT BUILDERS Improvement/Construction of Fa... See more Mangandingay, Cabarroguis, Quirino. Approved 2025-06-16 19:27:33 Ready for Release Processed in 2 working days.
107 DOLE_RO2_2025-06-18_40_JOYU JIT BUILDERS Improvement/Concreting of Farm... See more San Antonio, Aglipay, Quirino. Approved 2025-06-16 20:23:11 Ready for Release Processed in 2 working days.
108 DOLE_RO2_2025-06-18_41_2U7Z JIT BUILDERS Improvement/Concreting of Farm... See more Ramos, Aglipay, Quirino. Approved 2025-06-16 21:00:01 Ready for Release Processed in 2 working days.
109 DOLE_RO2_2025-06-20_44_GSNU MAYHALIGUE CONSTRUCTION AND SUPPLY, INC. INFRA-NCB-NVIMO-17-25, PACKAGE... See more VILLAVERDE, NUEVA VIZCAYA Approved 2025-06-16 21:13:49 Ready for Release Processed in 4 working days.
110 DOLE_RO2_2025-06-20_45_Z7DW E.M. BAYATAN CONSTRUCTION INFRA- NCB-NVIMO-17-25, CONSTR... See more VILLAVERDE, NUEVA VIZCAYA Approved 2025-06-16 21:19:13 Ready for Release Processed in 4 working days.
111 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:26:35 Returned to Applicant DOUBLE ENTRY
112 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:27:04 Returned to Applicant DOUBLE ENTRY
113 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:27:53 Returned to Applicant DOUBLE ENTRY
114 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:28:47 Returned to Applicant DOUBLE ENTRY
115 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:29:24 Returned to Applicant DOUBLE ENTRY
116 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:29:53 Returned to Applicant DOUBLE ENTRY
117 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:30:58 Returned to Applicant DOUBLE ENTRY
118 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:31:59 Returned to Applicant DOUBLE ENTRY
119 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:32:54 Returned to Applicant DOUBLE ENTRY
120 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:46:33 Returned to Applicant DOUBLE ENTRY
121 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:47:11 Returned to Applicant DOUBLE ENTRY
122 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:48:18 Returned to Applicant DOUBLE ENTRY
123 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:48:45 Returned to Applicant DOUBLE ENTRY
124 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:49:11 Returned to Applicant DOUBLE ENTRY
125 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:49:34 Returned to Applicant DOUBLE ENTRY
126 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:50:05 Returned to Applicant DOUBLE ENTRY
127 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:50:35 Returned to Applicant DOUBLE ENTRY
128 J.A UBONGEN CONSTRUCTION lot70 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:51:01 Returned to Applicant DOUBLE ENTRY
129 J.A UBONGEN CONSTRUCTION lot72 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:53:25 Returned to Applicant DOUBLE ENTRY
130 J.A UBONGEN CONSTRUCTION lot72 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:53:56 Returned to Applicant DOUBLE ENTRY
131 J.A UBONGEN CONSTRUCTION lot72 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:54:48 Returned to Applicant DOUBLE ENTRY
132 J.A UBONGEN CONSTRUCTION lot72 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:55:11 Returned to Applicant DOUBLE ENTRY
133 J.A UBONGEN CONSTRUCTION lot72 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:55:33 Returned to Applicant DOUBLE ENTRY
134 J.A UBONGEN CONSTRUCTION lot72 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:55:59 Returned to Applicant DOUBLE ENTRY
135 J.A UBONGEN CONSTRUCTION lot72 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:56:22 Returned to Applicant DOUBLE ENTRY
136 J.A UBONGEN CONSTRUCTION lot72 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:56:47 Returned to Applicant DOUBLE ENTRY
137 J.A UBONGEN CONSTRUCTION lot72 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-16 21:57:12 Returned to Applicant DOUBLE ENTRY
138 Mr. and Mrs. Roel Andrew/ Iris-Jane Ravelo PROPOSED 3-STOREY RESIDENTIAL ... See more Lt.13 Blk 8 Grand Victoria Heights Subd. Libag Norte tuguegarao City Rejected 2025-06-16 22:57:50 Returned to Applicant simplified
139 MASTER Z CONSTRUCTION SERVICES CONCRETING OF UNAON-STA LUCIA ... See more UNAON-STA. LUCIA, BAGABAG, NUEVA VIZCAYA Rejected 2025-06-17 00:53:06 Returned to Applicant PLS REQ. ROAD ROLLER & GRA... See more
140 DOLE_RO2_2025-06-20_46_B625 MASTER Z CONSTRUCTION SERVICES CONSTRUCTION OF CHB CANAL LINI... See more BINTAWAN SUR, VILLAVERDE, NUEVA VIZCAYA Approved 2025-06-17 01:31:35 Ready for Release Processed in 4 working days.
141 DOLE_RO2_2025-06-20_47_DCIE MASTER Z CONSTRUCTION SERVICES UPGRADING/IMPROVEMENT OF PUROK... See more PUROK 1, SAN PABLO, DIADI, NUEVA VIZCAYA Approved 2025-06-17 01:40:01 Ready for Release Processed in 4 working days.
142 DOLE_RO2_2025-06-18_42_KLEL CLG SHALOM BUILDERS INC. SBC CAUYAN ISABELA BRANCH GROUND FLOOR, 2-STOREY BUILDING (BESIDES VICENTE MANLAPAZ BUILDING) NATIONAL HIGHWAY, DISTRICT 1, CAUAYAN, ISABELA Approved 2025-06-17 02:06:51 Ready for Release Processed in 2 working days.
143 Proposed Commercial and Warehouse Building Proposed Commercial and Wareho... See more Caggay, Tuguegarao City, Cagayan Rejected 2025-06-17 16:55:33 Returned to Applicant INCOMPLETE DOCCUMENT ATTACHED
144 QCD CONSTRUCTION AND SUPPLY INFRA-NCB-NVIMO-16-25, PACKAGE... See more SAN LUIS, SOLANO, NUEVA VIZCAYA Rejected 2025-06-17 17:57:40 Returned to Applicant EXPIRED PCAB
145 DOLE_RO2_2025-06-20_48_R8RI N-J CONSTRUCTION IMPROVEMENT OF CORE SHELTER SI... See more BARANGAY TADJI, KASIBU, NUEVA VIZCAYA Approved 2025-06-17 18:05:54 Ready for Release Processed in 3 working days.
146 DOLE_RO2_2025-06-20_49_NSHA WINLEI CONSTRUCTION AND SUPPLY REHABILITATION/IMPROVEMENT OF ... See more BAYOMBONG, NUEVA VIZCAYA Approved 2025-06-17 18:10:38 Ready for Release Processed in 3 working days.
147 DOLE_RO2_2025-06-20_50_P257 WINLEI CONSTRUCTION AND SUPPLY INSTALLATION OF DIRECTIONAL SI... See more CAPITOL COMPOUND, BAYOMBONG, NUEVA VIZCAYA Approved 2025-06-17 18:15:05 Ready for Release Processed in 3 working days.
148 DOLE_RO2_2025-06-24_54_0FQN MAK-CT Construction OPC Construction of Canal Lining (... See more Lasam, Cagayan Approved 2025-06-17 18:59:20 Ready for Release Processed in 5 working days.
149 ARVEA’S CONSTRUCTION NCB-R02-TRMP02-25 CONSTRUCTION... See more TUMAUINI, ISABELA Rejected 2025-06-17 19:04:21 Returned to Applicant Under DO 252, Series of 2025, ... See more
150 DOLE_RO2_2025-06-20_51_WMQ6 YZK BUILDERS Design and Build of 20,000 bag... See more Brgy. Ambatali, Ramon, Isabela Approved 2025-06-17 23:09:00 Ready for Release Processed in 3 working days.
151 Municipality of Ramon, Isabela UPGRADING OF LOCAL ACCESS ROAD... See more Burgos, Ramon, Isabela Rejected 2025-06-17 23:11:29 Returned to Applicant incomplete documents
152 DOLE_RO2_2025-06-20_52_AUSF ARVEA’S CONSTRUCTION NCB-R02-TRMP02-25 CONSTRUCTION... See more TUMAUINI, ISABELA Approved 2025-06-18 16:45:34 Ready for Release Processed in 2 working days.
153 Municipality of Ramon, Isabela UPGRADING OF LOCAL ACCESS ROAD... See more Burgos, Ramon, Isabela Rejected 2025-06-18 18:49:36 Returned to Applicant Under DO 252, Series of 2025, ... See more
154 DOLE_RO2_2025-06-20_53_FHBJ BUILDTEK CONSTRUCTION Repair/Rehabilitation of Dibul... See more Barangay, Dibulo, Dinapigue, Isabela Approved 2025-06-18 18:58:21 Ready for Release Processed in 2 working days.
155 WILLIE'S CONSTRUCTION CONSTRUCTION OF 4'' CHB CANAL ... See more ARITAO, NUEVA VIZCAYA Rejected 2025-06-18 22:45:07 Returned to Applicant CSHP TEMPLATE NO PROPERLY FILL... See more
156 Radiance Solar Solutions Inc. 65MW San Pablo Solar Power Pro... See more Brgy. Annanuman San Pablo Isabela Rejected 2025-06-18 23:41:14 Returned to Applicant Incomplete
157 RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED TELEC... See more PUROK 1 BRGY STA LUCIA, BAGABAG, NUEVA VIZCAYA Rejected 2025-06-19 02:14:38 Returned to Applicant NO SIGNATURE IN PCAB. NO CERT ... See more
158 DOLE_RO2_2025-06-24_55_VPPG RAMIKE CONSTRUCTION NFRA-NCB-CBIMO-01-25 CONSTRUCT... See more SANCHEZ MIRA, CAGAYAN Approved 2025-06-19 17:23:01 Ready for Release Processed in 3 working days.
159 J.A UBONGEN CONSTRUCTION Lot70 Repair/Rehabilitation of... See more Barangay Bucal sur Dinapigue Isabela Rejected 2025-06-19 18:10:22 Returned to Applicant No NCII Scaffolding
160 J.A UBONGEN CONSTRUCTION Lot72 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-06-19 18:18:57 Returned to Applicant EXPIRED PCAB. Cert of Ramos is... See more
161 Harmonic System Incorporated Limbauan Solar Power Plant Limbauan, San Pablo, Isabela Rejected 2025-06-19 20:21:49 Returned to Applicant As per DO 252 s 2025 effective... See more
162 DOLE_RO2_2025-06-24_56_LT02 BENSON BUILDERS INFRA-NCB-NVIMO-10-25, REHABIL... See more STA. FE, NUEVA VIZCAYA Approved 2025-06-19 21:42:10 Ready for Release Processed in 3 working days.
163 DOLE_RO2_2025-06-24_57_WYTQ BENSON BUILDERS IMPROVEMENT OF ANTUTOT-ALLOY R... See more BRGY. ALLOY, KASIBU, NUEVA VIZCAYA Approved 2025-06-19 21:45:51 Ready for Release Processed in 3 working days.
164 DOLE_RO2_2025-06-24_58_684X BENSON BUILDERS INFRA-NCB-NVIMO-03-25, CONSTRU... See more BAMBANG, NUEVA VIZCAYA Approved 2025-06-19 21:50:39 Ready for Release Processed in 3 working days.
165 DOLE_RO2_2025-06-24_59_8FTQ JKCEZ CONCRETING OF PUROK APUNAN ROA... See more BRGY. MACABENGA, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-06-19 21:55:44 Ready for Release Processed in 3 working days.
166 DOLE_RO2_2025-06-24_60_DUK7 JKCEZ CONSTRUCTION CONCRETING OF SADDLE ROAD BRGY. MACABENGA, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-06-19 22:04:31 Ready for Release Processed in 3 working days.
167 C.D.J. BUILDERS AND CONSTRUCTION SUPPLIES INFRA-NCB-NVIMO-17-25, PACKAGE... See more VILLAVERDE, NUEVA VIZCAYA Rejected 2025-06-19 22:12:18 Returned to Applicant ABOUT TO EXPIRE PCAB (JUNE 25,... See more
168 DOLE_RO2_2025-06-24_61_NM7E 4 KIDS BUILDERS AND CONSTRUCTION SUPPLY INFRA-NCB-NVIMO-06-25, CONSTRU... See more DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-06-19 22:18:33 Ready for Release Processed in 3 working days.
169 J. A UBONGEN CONSTRUCTION Lot54 Repair/Rrhabilitation of... See more San Agustin Isabela Rejected 2025-06-19 22:24:59 Returned to Applicant EXPIRED PCAB
170 DOLE_RO2_2025-06-24_62_XYUF CAB CONSTRUCTION AND SUPPLY IMPROVEMENT OF GONGGONGOB ROAD... See more VILLAVERDE, NUEVA VIZCAYA Approved 2025-06-19 22:27:38 Ready for Release Processed in 3 working days.
171 ARSD CONSTRUCTION CORPORATION Proposed SPUP 4 Storey Parking... See more SPUP Mabini St. Tuguegarao City Rejected 2025-06-19 23:13:32 Returned to Applicant Incomplete
172 ARSD CONSTRUCTION CORPORATION Proposed SPUP 5 Storey Dormito... See more SPUP Mabini St. Tuguegarao City Rejected 2025-06-19 23:17:41 Returned to Applicant Incomplete
173 DOLE_RO2_2025-06-25_66_BPXG J. A UBONGEN CONSTRUCTION Repair/Rehabilitation of San I... See more San Isidro Isabela Approved 2025-06-19 23:19:17 Ready for Release Processed in 4 working days.
174 DOLE_RO2_2025-06-24_63_VM9Q QCD CONSTRUCTION AND SUPPLY INFRA-NCB-NVIMO-16-25, PACKAGE... See more SAN LUIS, SOLANO, NUEVA VIZCAYA Approved 2025-06-19 23:46:47 Ready for Release Processed in 3 working days.
175 J. A UBONGEN CONSTRUCTION Lot55 Repair/Rehabilitation of... See more Jones Isabela Rejected 2025-06-22 17:35:46 Returned to Applicant EXPIRED PCAB
176 J. A UBONGEN CONSTRUCTION Lot58 Repair/Rehabilitation of... See more Barangay Linamanan Jones Isabela Rejected 2025-06-22 17:44:14 Returned to Applicant EXPIRED PCAB
177 J.A UBONGEN CONSTRUCTION Lot58 Repair/Rehabilitation of... See more Barangay Linamanan Jones Isabela Rejected 2025-06-22 17:53:54 Returned to Applicant double entry application #177
178 WILLIE'S CONSTRUCTION CONSTRUCTION OF 4'' CHB CANAL ... See more ARITAO, NUEVA VIZCAYA Rejected 2025-06-22 19:55:04 Returned to Applicant NO TESTING CERTIFICATE OF DUMP... See more
179 JURIS CONSTRUCTION & BUILDERS Improvement/Concreting of Farm... See more Victoria, Aglipay, Quirino Rejected 2025-06-22 22:51:59 Returned to Applicant Finished Project- (Letter of ... See more
180 DOLE_RO2_2025-06-25_67_BZFN CAMIA CONSTRUCTION DEVELOPMENT CORPORATION REHABILITATION OF BUGALLON PRO... See more Ramon, Isabela Approved 2025-06-22 23:04:47 Ready for Release Processed in 2 working days.
181 JURIS CONSTRUCTION & BUILDERS PB-CW-2025-012- IMPROVEMENT/CO... See more Cardenas, Saguday, Quirino Rejected 2025-06-23 00:21:27 Returned to Applicant Finished Project ( June 23, 20... See more
182 MASTER Z CONSTRUCTION SERVICES CONSTRUCTION OF RIVER WALL PHA... See more BINTAWAN SUR, VILLAVERDE, NUEVA VIZCAYA Rejected 2025-06-23 00:36:23 Returned to Applicant FIRST AIDER IS NOT VALID (MUST... See more
183 RJR'S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more STA MARGARITA,BAGGAO,CAGAYAN Rejected 2025-06-23 17:10:51 Returned to Applicant INCOMPLETE ATTACHEMENT
184 DOLE_RO2_2025-06-25_68_JT08 AMBAGUIO BUILDERS INSTALLATION OF CAPITOL COMPOU... See more CAPITOL COMPOUND, BAYOMBONG, NUEVA VIZCAYA Approved 2025-06-23 18:16:17 Ready for Release Processed in 2 working days.
185 RJR,S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more STA.MARGARITA,BAGGAO,CAGAYAN Rejected 2025-06-23 18:17:26 Returned to Applicant UNSIGNED PCAB AND EXPIRED EQUI... See more
186 RJR'S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more IBULO,BAGGAO,CAGAYAN Rejected 2025-06-23 18:42:58 Returned to Applicant double entry (jurisdiction of ... See more
187 DOLE_RO2_2025-06-24_64_OZ4D AJN24 CONSTRUCTION NCB-INFRA-QIMO-01-02, P6, ADRI... See more AGLIPAY, QUIRINO Approved 2025-06-23 18:56:50 Ready for Release Processed in 1 working days.
188 RJR'S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more CARUPIAN, BAGGAO,CAGAYAN Rejected 2025-06-23 19:03:39 Returned to Applicant UNSIGNED PCAB AND EXPIRED EQUI... See more
189 DOLE_RO2_2025-06-25_69_F4TT TATUM CONSTRUCTION CONCRETING OF I.650KM YABBI FT... See more DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-06-23 19:04:02 Ready for Release Processed in 2 working days.
190 AJN24 CONSTRUCTION NCB-INFRA-QIMO-01-25, P7, ADRI... See more AGLIPAY, QUIRINO Rejected 2025-06-23 19:19:21 Returned to Applicant Same Safety Officer and First... See more
191 DOLE_RO2_2025-06-24_65_5LSU AJN24 CONSTRUCTION NCB-INFRA-QIMO-01-25, P7, ADRI... See more AGLIPAY, QUIRINO Approved 2025-06-23 20:52:07 Ready for Release Processed in 1 working days.
192 J.A.M. Industrial Sales Installation of SFO Tank 327 Prenza Highway, Cauayan City, Isabela Rejected 2025-06-23 22:36:11 Returned to Applicant As per new DO 252 s 2025. For ... See more
193 RJR'S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more IBULO,BAGGAO,CAGAYAN Rejected 2025-06-23 22:44:04 Returned to Applicant pls req. first aider id
194 DOLE_RO2_2025-06-25_70_GY9R SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF CABULUAN SWI... See more CABULUAN, ALCALA, CAGAYAN Approved 2025-06-23 23:18:59 Ready for Release Processed in 2 working days.
195 Municipality of Ramon, Isabela UPGRADING OF LOCAL ACCESS ROAD... See more Burgos, Ramon, Isabela Rejected 2025-06-23 23:27:03 Returned to Applicant Rochelle S. Redolozo (FA) must... See more
196 DOLE_RO2_2025-06-25_71_FXWB SHASHA'S CONSTRUCTION AND SUPPLIES CONSTRUCTION OF SLF FACILITY (... See more DALAOIG, ALCALA, CAGAYAN Approved 2025-06-23 23:51:13 Ready for Release Processed in 2 working days.
197 E.L. CHAN CONSTRUCTION AND DEVELOPMENT RELOCATION of Metrobank-Maharl... See more R4 Tower. Quezon St. Cauayan City, Isabela Rejected 2025-06-24 00:02:07 Returned to Applicant No NCII Scaffolding, NCII weld... See more
198 RD BEDAÑA CONSTRUCTION AND SUPPLIES STREET LIGHTING PROJECT ALONG ... See more DADAP, LUNA, ISABELA Rejected 2025-06-24 00:49:24 Returned to Applicant One person is not allowed to s... See more
199 TOP VISION DESIGN AND CONSTRUCTION SERVICES REPAIR OF 6 CLASSROOMS AT ATUL... See more ATULAYAN, TUGUEGARAO CITY Rejected 2025-06-24 00:50:27 Returned to Applicant NO ATTACHED CERTIFICATE FOR SC... See more
200 DOLE_RO2_2025-07-01_74_U4XE REKEAM CONSTRUCTION & SUPPLY INSTALLATION OF SOLAR LIGHTS T... See more BAYOMBONG, NUEVA VIZCAYA Approved 2025-06-24 04:59:44 Ready for Release Processed in 6 working days.
201 D' BROTHERS INTERNATIONAL TRADING CORPORATION INFRA-NCB-NVIMO-26-25, CONSTRU... See more KAYAPA, NUEVA VIZCAYA Rejected 2025-06-24 05:08:17 Returned to Applicant Form not filled out properly.
202 DOLE_RO2_2025-07-01_75_KPN7 BENSON BUILDERS CONSTRUCTION OF ROAD NETWORKS ... See more BRGY. ANTUTOT, KASIBU, NUEVA VIZCAYA Approved 2025-06-24 05:13:39 Ready for Release Processed in 6 working days.
203 DOLE_RO2_2025-07-01_76_R2ZK CAB CONSTRUCTION AND SUPPLY CONCRETING OF BACLAS TO BILEN... See more BRGY. SALINGSINGAN, AMBAGUIO, NUEVA VIZCAYA Approved 2025-06-24 05:20:10 Ready for Release Processed in 6 working days.
204 DOLE_RO2_2025-07-01_77_O8GB BELANCE BUILDERS & TRADING CONSTRUCTION OF MECHANICAL DR... See more BRGY. CAPISAAN, KASIBU, NUEVA VIZCAYA Approved 2025-06-24 05:27:53 Ready for Release Processed in 6 working days.
205 AMBAGUIO BUILDERS CONCRETING OF AWA TO MANGGA FA... See more BRGY. POBLACION, AMBAGUIO, NUEVA VIZCAYA Rejected 2025-06-24 05:33:13 Returned to Applicant FA WITH EXISTING PROJECT TO SI... See more
206 DOLE_RO2_2025-07-01_78_0N0S D.A. CADELINA CONSTRUCTION INFRA-NCB-NVIMO-17-25, PACKAGE... See more VILLAVERDE, NUEVA VIZCAYA Approved 2025-06-24 05:38:37 Ready for Release Processed in 6 working days.
207 DOLE_RO2_2025-07-01_79_V7IA FIRST- OPTION BUILDERS' AND CONSTRUCTION SUPPLIES IMPROVEMENT OF VILLA AURORA TO... See more DIADI, NUEVA VIZCAYA Approved 2025-06-24 05:43:49 Ready for Release Processed in 6 working days.
208 DOLE_RO2_2025-07-01_80_YA2O C.D.J. BUILDERS AND CONSTRUCTION SUPPLIES INFRA-NCB-NVIMO-17-25, PACKAGE... See more VILLAVERDE, NUEVA VIZCAYA Approved 2025-06-24 05:47:28 Ready for Release Processed in 6 working days.
209 BY ADMIN/MR. & MRS. CESAR GATUS AND BELINDA B. GATUS PROPOSED 7-UNIT TWO STOREY RES... See more SAN FERMIN CAUAYAN CITY ISABELA Rejected 2025-06-24 18:14:11 Returned to Applicant BY ADMIN
210 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF STA.... See more STA. ANA, CAGAYAN Rejected 2025-06-25 00:27:59 Returned to Applicant unsigned PCAB License, No NC2 ... See more
211 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF STA.... See more STA. ANA, CAGAYAN Rejected 2025-06-25 00:29:29 Returned to Applicant unsigned PCAB License, No NC2 ... See more
212 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF MATI... See more CAMALANIUGAN, CAGAYAN Rejected 2025-06-25 00:30:53 Returned to Applicant unsigned PCAB License, No NC2 ... See more
213 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF CAMA... See more CAMALANIUGAN, CAGAYAN Rejected 2025-06-25 00:33:37 Returned to Applicant unsigned PCAB License, NO NC2 ... See more
214 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF CAMA... See more CAMALANIUGAN, CAGAYAN Rejected 2025-06-25 00:39:07 Returned to Applicant PROJECT TOTAL COST IN THE APPL... See more
215 DOLE_RO2_2025-07-01_81_GEBW YZK BUILDERS Construction of Central Nurser... See more Tumauini Isabela Approved 2025-06-25 00:43:50 Ready for Release Processed in 5 working days.
216 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF CENT... See more CLAVERIA, CAGAYAN Rejected 2025-06-25 00:48:16 Returned to Applicant PROJECT COST IN THE CSHP APPLI... See more
217 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF STA.... See more STA. ANA, CAGAYAN Rejected 2025-06-25 00:55:39 Returned to Applicant PROJECT COST IN THE CSHP APPLI... See more
218 DOLE_RO2_2025-07-01_82_DSCP BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF STA.... See more STA. ANA, CAGAYAN Approved 2025-06-25 00:56:29 Ready for Release Processed in 5 working days.
219 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF MATI... See more CAMALANIUGAN, CAGAYAN Rejected 2025-06-25 00:58:11 Returned to Applicant PROJECT COST IN THE CSHP APPLI... See more
220 SAGADANIAN BUILDERS CW-C-UCRIS-01-2025/UCRIS, MALL... See more MALLIG, ISABELA Rejected 2025-06-25 01:35:21 Returned to Applicant 1.As per new DO 252 s 2025. Fo... See more
221 DOLE_RO2_2025-07-01_83_SM31 Radiance Solar Solutions Inc. 65MW San Pablo Solar Power Pro... See more Brgy. Annanuman San Pablo Isabela Approved 2025-06-25 01:57:53 Ready for Release Processed in 5 working days.
222 Radiance Solar Solutions Inc. 65MW San Pablo Solar Power Pro... See more Brgy. Annanuman San Pablo Isabela Rejected 2025-06-25 02:09:45 Returned to Applicant DUPLICATE
223 D' BROTHERS INTERNATIONAL TRADING CORPORATION INFRA-NCB-NVIMO-26-25, CONSTRU... See more KAYAPA, NUEVA VIZCAYA Rejected 2025-06-25 04:52:16 Returned to Applicant DUPLICATE
224 DOLE_RO2_2025-07-01_84_L6YH JOVIC CONSTRUCTION & SUPPLY RETROFITTING OF CAPPIT (PADUYA... See more KASIBU, NUEVA VIZCAYA Approved 2025-06-25 04:56:28 Ready for Release Processed in 5 working days.
225 DOLE_RO2_2025-07-01_85_6H1I E.H. MILIO CONSTRUCTION IMPROVEMENT OF BATEC LOGPOND R... See more KASIBU, NUEVA VIZCAYA Approved 2025-06-25 05:00:50 Ready for Release Processed in 5 working days.
226 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF MATI... See more CAMALANIUGAN, CAGAYAN Rejected 2025-06-25 17:32:07 Returned to Applicant PROJECT COST IN THE CSHP APPLI... See more
227 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF MATI... See more CAMALANIUGAN, CAGAYAN Rejected 2025-06-25 17:36:28 Returned to Applicant UNSIGNED PCAB LICENSE, NO NC2 ... See more
228 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF CENT... See more CLAVERIA, CAGAYAN Rejected 2025-06-25 17:37:36 Returned to Applicant UNSIGNED PCAB LICENSE, NO NC2 ... See more
229 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF NORT... See more ABULUG, CAGAYAN Rejected 2025-06-25 17:41:24 Returned to Applicant UNSIGNED PCAB LICENSE, NO NC2 ... See more
230 PAULINE CECILLE DIMSON / PROPOSED THREE STOREY STUDIO APARTMENT WITH RESIDENTIAL BUILDING PROPOSED THREE STOREY STUDIO A... See more SCORPIO ST. EXTENSION CONCUELO HEIGHTS, LEONARDA TUG. CITY Rejected 2025-06-25 18:22:07 Returned to Applicant SIMPLIFIED, WRONG RORM
231 E.L. CHAN CONSTRUCTION AND DEVELOPMENT RELOCATION of Metrobank-Maharl... See more R4 Tower. Quezon St. Cauayan City, Isabela Rejected 2025-06-25 18:25:08 Returned to Applicant 1. CSHP template 6.1 not fille... See more
232 DOLE_RO2_2025-07-01_86_CUMA Radiance Solar Solutions Inc. 65MW San Pablo Solar Power Pro... See more Brgy. Annanuman San Pablo Isabela Approved 2025-06-25 18:58:07 Ready for Release Processed in 4 working days.
233 E.L. CHAN CONSTRUCTION AND DEVELOPMENT RELOCATION of Metrobank-Maharl... See more R4 Tower. Quezon St. Cauayan City, Isabela Rejected 2025-06-25 19:03:30 Returned to Applicant double entry
234 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF NORT... See more ABULUG, CAGAYAN Rejected 2025-06-25 19:35:41 Returned to Applicant PROJECT COST IN THE CSHP APPLI... See more
235 DOLE_RO2_2025-07-01_87_4FBS BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF PINI... See more ABULUG, CAGAYAN Approved 2025-06-25 19:36:39 Ready for Release Processed in 4 working days.
236 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF ABUL... See more ABULUG, CAGAYAN Rejected 2025-06-25 19:37:44 Returned to Applicant UNSIGNED PCAB LICENSE
237 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF ABUL... See more ABULUG, CAGAYAN Rejected 2025-06-25 19:38:49 Returned to Applicant UNSIGNED PCAB LICENSE
238 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF LAL-... See more LAL-LO, CAGAYAN Rejected 2025-06-25 19:40:47 Returned to Applicant UNSIGNED PCAB LICENSE
239 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF ALLA... See more ALLACAPAN, CAGAYAN Rejected 2025-06-25 19:41:56 Returned to Applicant UNSIGNED PCAB
240 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF LASA... See more LASAM, CAGAYAN Rejected 2025-06-25 20:13:36 Returned to Applicant PROJECT NAME AND LOCATION NOT ... See more
241 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF SAN ... See more SAN MATEO, ISABELA Rejected 2025-06-25 20:14:36 Returned to Applicant no signature of owner at upper... See more
242 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF LAPA... See more CABATUAN, ISABELA Rejected 2025-06-25 20:15:40 Returned to Applicant No signature at the upper righ... See more
243 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF ROXA... See more ROXAS, ISABELA Rejected 2025-06-25 20:16:38 Returned to Applicant no signature of the owner at P... See more
244 AJN24 CONSTRUCTION PB-CW-2025-007 - IMPROVEMENT ... See more STO. TOMAS, MADDELA, QUIRINO Rejected 2025-06-25 22:14:25 Returned to Applicant 1. Application Form (please in... See more
245 AJN24 CONSTRUCTION PB-CW-2025-008 - IMPROVEMENT ... See more VILLA AGULLANA, MADDELA, QUIRINO Rejected 2025-06-25 22:19:37 Returned to Applicant 1. NO Application Form Attache... See more
246 ARSD CONSTRUCTION CORPORATION Proposed SPUP 4 Storey Parking... See more SPUP Mabini St. Tuguegarao City Rejected 2025-06-25 23:05:09 Returned to Applicant Under DO 252, Series of 2025, ... See more
247 ARSD CONSTRUCTION CORPORATION Proposed SPUP 5 Storey Dormito... See more SPUP Mabini St. Tuguegarao City Rejected 2025-06-25 23:08:39 Returned to Applicant unsigned contractor (template)
248 AJN24 CONSTRUCTION PB-CW-2025-007 - IMPROVEMENT ... See more STO. TOMAS, MADDELA, QUIRINO Rejected 2025-06-25 23:15:55 Returned to Applicant FINISH PROJECT
249 DOLE_RO2_2025-06-27_73_PV0N AJN24 CONSTRUCTION PB-CW-2025-008 - IMPROVEMENT ... See more VILLA AGULLANA, MADDELA, QUIRINO Approved 2025-06-26 01:02:13 Ready for Release Processed in 2 working days.
250 DOLE_RO2_2025-07-02_98_0M7V YZK BUILDERS Construction of Guard House at... See more Tumauini Isabela Approved 2025-06-26 00:09:19 Ready for Release Processed in 5 working days.
251 WILLIE'S CONSTRUCTION CONSTRUCTION OF 4'' CHB CANAL ... See more ARITAO, NUEVA VIZCAYA Rejected 2025-06-26 00:46:13 Returned to Applicant FA WITH EXISTING PROJECT TO BE... See more
252 MC Geometric Proportions, Inc. Package 25-14: City Sports Com... See more Baluarte, Santiago City Rejected 2025-06-26 18:53:47 Returned to Applicant Tagged as finished project
253 DOLE_RO2_2025-07-01_88_UEQG A.P BOISER CONSTRUCTION AND SUPPLY Narrow Base Tower (NBT) Height... See more PH020051-Brgy. Bilibigao, Claveria, Cagayan Approved 2025-06-26 19:14:50 Ready for Release Processed in 3 working days.
254 CAPITAL CONSTRUCTION Contract No. 2024-DII-RNIS-SAN... See more SAN MATEO, ISABELA Rejected 2025-06-26 19:38:31 Returned to Applicant only pcab document is attached
255 JKA-Ver Construction and Engineering Services FTAP-GLOBE ROLLOUT PROJECT PUROK 4, BRGY. BACKILING, APPARI CAGAYAN Rejected 2025-06-26 21:35:06 Returned to Applicant INCOMPLETE ATTACHEDMENT
256 DOLE_RO2_2025-07-01_89_SYPL DRAGON HATCHED CONSTRUCTION CONSTRUCTION OF NEW ILAGAN CIT... See more BRGY. ALIBAGU, CITY OF ILAGAN , ISABELA Approved 2025-06-26 23:25:24 Ready for Release Processed in 3 working days.
257 DOLE_RO2_2025-07-01_90_FQL2 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF STA.... See more STA. ANA, CAGAYAN Approved 2025-06-26 23:35:54 Ready for Release Processed in 3 working days.
258 DOLE_RO2_2025-07-02_99_FWQA BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF STA.... See more STA. ANA, CAGAYAN Approved 2025-06-26 23:36:41 Ready for Release Processed in 4 working days.
259 DOLE_RO2_2025-07-01_91_QKN9 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF MATI... See more CAMALANIUGAN, CAGAYAN Approved 2025-06-26 23:38:29 Ready for Release Processed in 3 working days.
260 DOLE_RO2_2025-07-01_92_8L59 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF CAMA... See more CAMALANIUGAN, CAGAYAN Approved 2025-06-26 23:42:19 Ready for Release Processed in 3 working days.
261 DOLE_RO2_2025-07-01_93_JMTC BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF CENT... See more CLAVERIA, CAGAYAN Approved 2025-06-26 23:43:03 Ready for Release Processed in 3 working days.
262 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF NORT... See more ABULUG, CAGAYAN Rejected 2025-06-26 23:44:07 Returned to Applicant PROJECT COST IN THE CSHP APPLI... See more
263 DOLE_RO2_2025-07-02_100_R1OA BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF PINI... See more ABULUG, CAGAYAN Approved 2025-06-26 23:45:40 Ready for Release Processed in 4 working days.
264 DOLE_RO2_2025-07-01_94_0V4N BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF ABUL... See more ABULUG, CAGAYAN Approved 2025-06-26 23:46:19 Ready for Release Processed in 3 working days.
265 DOLE_RO2_2025-07-01_95_ZSN4 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF ABUL... See more ABULUG, CAGAYAN Approved 2025-06-26 23:50:02 Ready for Release Processed in 3 working days.
266 DOLE_RO2_2025-07-02_101_JBW9 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF LAL-... See more LAL-LO, CAGAYAN Approved 2025-06-26 23:50:53 Ready for Release Processed in 4 working days.
267 DOLE_RO2_2025-07-02_102_IEF3 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF ALLA... See more ALLACAPAN, CAGAYAN Approved 2025-06-26 23:53:54 Ready for Release Processed in 4 working days.
268 DOLE_RO2_2025-07-01_96_KP0U BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF LASA... See more LASAM, CAGAYAN Approved 2025-06-26 23:55:05 Ready for Release Processed in 3 working days.
269 MC Geometric Proportions, Inc. Package 25-14: City Sports Com... See more Baluarte, Santiago City Rejected 2025-06-29 18:10:13 Returned to Applicant double entry ID NO. 409
270 RJR’S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more STA. CARUPIAN,BAGGAO,CAGAYAN Rejected 2025-06-29 19:29:27 Returned to Applicant EXPIRED CHE TESTING EQUIPMENT
271 RDJD CONSTRUCTION CONCRETING OF NARURON ROAD(BIT... See more BITNONG, DUPAX DEL SUR, NUEVA VIZCYA Rejected 2025-06-29 20:10:46 Returned to Applicant DUPLICATE
272 RTC CONSTRUCTION CONSTRUCTION OF PERIMETER FENC... See more LALLO, CAGAYAN Rejected 2025-06-29 20:27:04 Returned to Applicant INCOMPLETE ATTACHEMENT
273 RTC CONSTRUCTION CONSTRUCTION OF PERIMETER FENC... See more LALLO, CAGAYAN Rejected 2025-06-29 20:50:30 Returned to Applicant 1. UNSIGNED FIRST PAGE OF TEMP... See more
274 JHUERS CONSTRUCTION LGU-DIADI BAC 2025-05-CONSTRUC... See more ESCOTING, DIADI, NUEVA VIZCAYA Rejected 2025-06-29 21:15:37 Returned to Applicant CHE EXPIRED, CSHP TEMPLATE NOT... See more
275 RTC CONSTRUCTION CONSTRUCTION OF PERIMETER FENC... See more LALLO, CAGAYAN Rejected 2025-06-29 21:18:45 Returned to Applicant DUPLICATE
276 DOLE_RO2_2025-07-01_97_LINH SAGADANIAN BUILDERS CW-C-UCRIS-01-2025/UCRIS, MALL... See more MALLIG, ISABELA Approved 2025-06-29 22:34:25 Ready for Release Processed in 1 working days.
277 DOUBLE-D CONSTRUCTION CONSTRUCTION OF 3 CLASSROOMS, ... See more LINAO ELEMENTARY SCHOOL, TUGUEGARAO CITY Rejected 2025-06-30 01:03:15 Returned to Applicant NO ATTACHED NC2 OPERATOR FOR M... See more
278 JHUERS CONSTRUCTION 8000-000-3-1-10-007-006-009-CO... See more BARANGAY STA. MARIA, DUPAX DEL SUR, NUEVA VIZCAYA Rejected 2025-06-30 01:20:36 Returned to Applicant CHE EXPIRED, CSHP TEMPLATE NOT... See more
279 JHUERS CONSTRUCTION 8000-000-3-1-10-007-006-009-CO... See more BARANGAY STA. MARIA, DUPAX DEL SUR, NUEVA VIZCAYA Rejected 2025-06-30 01:20:45 Returned to Applicant DUPLICATE
280 DOLE_RO2_2025-07-02_103_79R3 ROMSON CONSTRUCTION & SUPPLIES CONSTRUCTION OF MULTIPURPOSE H... See more DINE, KASIBU, NUEVA VIZCAYA Approved 2025-06-30 01:59:25 Ready for Release Processed in 3 working days.
281 JHUERS CONSTRUCTION PB-CW-2025-051 COMPLETION / UP... See more GREGORIO PIMENTEL, DIFFUN, QUIRINO Rejected 2025-06-30 17:45:23 Returned to Applicant Double Entry
282 DOLE_RO2_2025-07-02_104_HR2O JHUERS CONSTRUCTION PB-CW-2025-049 COMPLETION / UP... See more GURIBANG, DIFFUN, QUIRINO Approved 2025-06-30 17:57:35 Ready for Release Processed in 2 working days.
283 DOLE_RO2_2025-07-02_105_E9PG ARSD CONSTRUCTION CORPORATION Proposed SPUP 4 Storey Parking... See more SPUP Mabini St. Tuguegarao City Approved 2025-06-30 18:16:00 Ready for Release Processed in 2 working days.
284 DOLE_RO2_2025-07-02_106_PRGJ ARSD CONSTRUCTION CORPORATION Proposed SPUP 5 Storey Dormito... See more SPUP Mabini St. Tuguegarao City Approved 2025-06-30 18:19:59 Ready for Release Processed in 2 working days.
285 MA TESORO CONSTRUCTION INFRA 25-10-30-PACKAGE 25-30: ... See more SANTIAGO CITY,ISABELA Rejected 2025-06-30 18:33:00 Returned to Applicant the uploaded documents are NCI... See more
286 MA TESORO CONSTRUCTION INFRA 25-10-31-PACKAGE 25-31: ... See more SANTIAGO CITY,ISABELA Rejected 2025-06-30 18:51:29 Returned to Applicant the uploaded documents are NCI... See more
287 JKA-Ver Construction and Engineering Services FTAP-GLOBE ROLLOUT PROJECT PUROK 4, BRGY. BACKILING, APPARI CAGAYAN Rejected 2025-06-30 19:18:00 Returned to Applicant a. unsigned PCAB License b.... See more
288 JHUERS CONSTRUCTION PB-CW-2025-051 COMPLETION / UP... See more GREGORIO PIMENTEL, DIFFUN, QUIRINO Rejected 2025-06-30 21:25:50 Returned to Applicant Safety Officer Michael Bucahan... See more
289 JHUERS CONSTRUCTION PB-CW-2025-33 CONSTRUCTION/ CO... See more GURIBANG, DIFFUN, QUIRINO Rejected 2025-06-30 21:29:21 Returned to Applicant 1. No attached COSH certificat... See more
290 DOLE_RO2_2025-07-02_107_NAHF D' BROTHERS INTERNATIONAL TRADING CORPORATION NCB-INFRA-QIMO-02-25, P2,QUIRI... See more QUIRINO Approved 2025-06-30 21:55:51 Ready for Release Processed in 2 working days.
291 JHUERS CONSTRUCTION NCB-INFRA-QIMO-01-25, P1 ADRIS... See more AGLIPAY, QUIRINO Rejected 2025-06-30 21:58:53 Returned to Applicant SO with on-going project
292 DOLE_RO2_2025-07-03_108_6CUS D' BROTHERS INTERNATIONAL TRADING CORPORATION NCB-INFRA-QIMO-02-25, P1,QUIRI... See more QUIRINO Approved 2025-06-30 22:01:29 Ready for Release Processed in 3 working days.
293 G.M. PAJARILLAGA CONSTRUCTION & SUPPLY INFRA-NCB-NVIMO-17-25, PACKAGE... See more VILLAVERDE, NUEVA VIZCAYA Rejected 2025-06-30 22:07:42 Returned to Applicant Attach a copy of the company e... See more
294 JHUERS CONSTRUCTION NCB-INFRA-QIMO-03-25 CABUGBUGA... See more CABARROGUIS, QUIRINO Rejected 2025-06-30 22:37:48 Returned to Applicant 1.Certificate of Testing and I... See more
295 Harmonic System Incorporated Limbauan Solar Power Plant Limbauan, San Pablo, Isabela Rejected 2025-07-01 00:22:38 Returned to Applicant 1. No attached CSHP Program Te... See more
296 CAPITAL CONSTRUCTION Contract No. 2024-DII-RNIS-SAN... See more SAN MATEO, ISABELA Rejected 2025-07-01 16:52:14 Returned to Applicant Under DO 252, Series of 2025, ... See more
297 DOLE_RO2_2025-07-04_110_7ZCH RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED TELEC... See more PUROK 1 BRGY STA LUCIA, BAGABAG, NUEVA VIZCAYA Approved 2025-07-01 20:05:12 Ready for Release Processed in 3 working days.
298 YSIDRA CONSTRUCTION INC. Construction of 1 Unit Classro... See more Hacienda Intal, Baggao, Cagayan Rejected 2025-07-01 22:35:10 Returned to Applicant NO NCII CERTIFICATE FOR WELDER... See more
299 JHUERS CONSTRUCTION NCB-INFRA-QIMO-03-25 CABUGBUGA... See more CABARROGUIS, QUIRINO Rejected 2025-07-01 22:35:49 Returned to Applicant (DOUBLE ENTRY) You have subm... See more
300 JHUERS CONSTRUCTION NCB-INFRA-QIMO-01-25, P1 ADRIS... See more AGLIPAY, QUIRINO Rejected 2025-07-01 22:40:48 Returned to Applicant Safety Officer Mr. MICHAEL ADA... See more
301 DOLE_RO2_2025-07-10_114_6L9U SL Development Construction Corp REMAINING WORKS FOR THE TUGUEG... See more Tuguegarao City, Cagayan Province Approved 2025-07-01 23:03:52 Ready for Release Processed in 7 working days.
302 WILLIE'S CONSTRUCTION CONSTRUCTION OF 4'' CHB CANAL ... See more ARITAO, NUEVA VIZCAYA Rejected 2025-07-01 23:33:09 Returned to Applicant NO COE OF FIRST AIDER
303 DOLE_RO2_2025-07-04_111_QQCG D' BROTHERS INTERNATIONAL TRADING CORPORATION INFRA-NCB-NVIMO-26-25, CONSTRU... See more KAYAPA, NUEVA VIZCAYA Approved 2025-07-02 00:03:06 Ready for Release Processed in 3 working days.
304 DOLE_RO2_2025-07-04_112_B77L AMBAGUIO BUILDERS CONCRETING OF AWA TO MANGGA FA... See more BRGY. POBLACION, AMBAGUIO, NUEVA VIZCAYA Approved 2025-07-02 00:07:51 Ready for Release Processed in 3 working days.
305 3JMS CONSTRUCTION REHABILITATION OF ROAD ALONG S... See more SORIANO ST., PALLUA SUR, TUGUEGARAO CITY, CAGAYAN Rejected 2025-07-02 18:24:49 Returned to Applicant TOTAL PROJECT COST NOT SAME IN... See more
306 DOLE_RO2_2025-07-10_115_O9UY 3JMS CONSTRUCTION REHABILITATION OF ROAD ALONG Z... See more LARION BAJO, TUGUEGARAO CITY, CAGAYAN Approved 2025-07-02 18:29:47 Ready for Release Processed in 6 working days.
307 DOLE_RO2_2025-07-10_116_CZFX 3JMS CONSTRUCTION CONSTRUCTION OF MASONRY DRAINA... See more SUNKIST STREET PENGUE-RUYU, TUGUEGARAO CITY, CAGAYAN Approved 2025-07-02 18:34:39 Ready for Release Processed in 6 working days.
308 WILLIE'S CONSTRUCTION CONSTRUCTION OF 4'' CHB CANAL ... See more ARITAO, NUEVA VIZCAYA Rejected 2025-07-02 18:43:50 Returned to Applicant CSHP Application & Program... See more
309 DOLE_RO2_2025-07-10_117_MUAW RAMIKE CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more PASSING, LASAM, CAGAYAN Approved 2025-07-02 19:20:18 Ready for Release Processed in 6 working days.
310 DOLE_RO2_2025-07-10_118_7T0U CJTPASCUAL CONSTRUCTION DEVELOPMENT OF LASAM PUBLIC CE... See more CENTRO 03, LASAM, CAGAYAN Approved 2025-07-02 19:55:31 Ready for Release Processed in 6 working days.
311 DOLE_RO2_2025-07-10_119_D0WW CJTPASCUAL CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more NEW ORLINS, LASAM, CAGAYAN Approved 2025-07-03 11:22:12 Ready for Release Processed in 5 working days.
312 7CHIN BUILDERS AND CONSTRUCTION SUPPLY CME-45m, 24sqm, 320kph, 150D k... See more Benito Soliven, Isabela Rejected 2025-07-03 11:27:48 Returned to Applicant RE-SUBMISSION NEEDED. INCOMPLE... See more
313 DOLE_RO2_2025-07-10_120_LYA3 YSIDRA CONSTRUCTION INC. Construction of 1 Unit Classro... See more Hacienda Intal, Baggao, Cagayan Approved 2025-07-03 11:39:07 Ready for Release Processed in 5 working days.
314 D'Limitless Civil Engineering Construction Proposed Construction of Two (... See more Brgy. Ambalatungan, Santiago City Isabela Rejected 2025-07-03 13:25:42 Returned to Applicant Under DO 252, Series of 2025, ... See more
315 DOLE_RO2_2025-07-03_109_QA8A D'Limitless Civil Engineering Construction Proposed Construction of Two (... See more Brgy. Ambalatungan, Santiago City Isabela Approved 2025-07-03 14:36:53 Ready for Release Processed in 1 working days.
316 DOLE_RO2_2025-07-11_131_XH1K ARNOLD AND DOMINADOR CONSTRUCTION SERVICES CONSTRUCTION OF HAZARDOUS WAST... See more BAGABAG, NUEVA VIZCAYA Approved 2025-07-03 14:50:10 Ready for Release Processed in 6 working days.
317 ARNOLD AND DOMINADOR CONSTRUCTION SERVICES REPAIR AND IMPROVEMENT OF P.I.... See more BAYOMBONG, NUEVA VIZCAYA Rejected 2025-07-03 14:55:07 Returned to Applicant FINISHED PROJECT
318 DOLE_RO2_2025-07-11_132_7ABC ARNOLD AND DOMINADOR CONSTRUCTION SERVICES COMPLETION OF HAZARDOUS WASTE ... See more BAMBANG, NUEVA VIZCAYA Approved 2025-07-03 14:58:41 Ready for Release Processed in 6 working days.
319 ATLANTIC CONSTRUCTION repair/rehabilitation of canan... See more cabatuan, isabela Rejected 2025-07-03 15:01:42 Returned to Applicant ISABELA PROJECT
320 ARNOLD AND DOMINADOR CONSTRUCTION SERVICES REPAIR AND MAINTENANCE OF PPDO... See more BAYOMBONG, NUEVA VIZCAYA Rejected 2025-07-03 15:02:09 Returned to Applicant FINISHED PROJECT
321 DOLE_RO2_2025-07-11_133_1CUX ARNOLD AND DOMINADOR CONSTRUCTION SERVICES REPAIR AND MAINTENANCE OF TIBL... See more AMBAGUIO, NUEVA VIZCAYA Approved 2025-07-03 15:06:09 Ready for Release Processed in 6 working days.
322 J.A.M. Industrial Sales Installation of SFO Tank 327 Prenza Highway, Cauayan City, Isabela Rejected 2025-07-03 15:32:28 Returned to Applicant NO SIGNATURE OF SAFETY OFFICER... See more
323 DOLE_RO2_2025-07-11_134_02RT ARNOLD AND DOMINADOR CONSTRUCTION SERVICES COMPLETION OF HAZARDOUS WASTE ... See more DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-07-03 15:46:40 Ready for Release Processed in 6 working days.
324 DOLE_RO2_2025-07-10_121_PD9M JHUERS CONSTRUCTION NCB-INFRA-QIMO-01-25, P1- ADRI... See more AGLIPAY, QUIRINO Approved 2025-07-03 18:03:02 Ready for Release Processed in 5 working days.
325 JHUERS CONSTRUCTION PB-CW-2025-33 CONSTRUCTION/ CO... See more GURIBANG, DIFFUN, QUIRINO Rejected 2025-07-03 18:06:58 Returned to Applicant Certificate of Testing Backhoe... See more
326 DOLE_RO2_2025-07-06_114_VL0Y JHUERS CONSTRUCTION PB-CW-2025-051 COMPLETION/ UPG... See more GREGORIO PIMENTEL, DIFFUN, QUIRINO Approved 2025-07-03 18:11:12 Ready for Release Processed in 2 working days.
327 JHUERS CONSTRUCTION NCB-INFRA-QIMO-03-25- CABUGBUG... See more CABARROGUIS, QUIRINO Rejected 2025-07-03 19:09:20 Returned to Applicant Certificate of Testing of Back... See more
328 MIZRACH'S CONSTRUCTION SERVICES CONSTRUCTION OF STONE MASONRY ... See more Guinalbin, Aglipay, Quirino Rejected 2025-07-04 12:08:32 Returned to Applicant No attached File
329 DOLE_RO2_2025-07-10_122_OJAK DOUBLE-D CONSTRUCTION CONSTRUCTION OF 3 CLASSROOMS, ... See more LINAO ELEMENTARY SCHOOL, TUGUEGARAO CITY Approved 2025-07-04 13:42:38 Ready for Release Processed in 4 working days.
330 7CHIN BUILDERS AND CONSTRUCTION SUPPLY CME-45m, 24sqm, 320kph, 150D k... See more Benito Soliven, Isabela Rejected 2025-07-04 14:08:47 Returned to Applicant LETTER OF INTENT AND COE MUST ... See more
331 DOLE_RO2_2025-07-11_135_5ZDB MNL Inc. Construction of Self Supportin... See more Brgy. Imelda Bliss Village, Ilagan City, Isabela Approved 2025-07-04 15:54:17 Ready for Release Processed in 5 working days.
332 JURIS CONSTRUCTION & BUILDERS PB-CW-2025-022-Improvement/Con... See more Dumabato Sur, Maddela, Quirino Rejected 2025-07-05 12:35:08 Returned to Applicant FINISHED PROJECT
333 DOLE_RO2_2025-07-10_123_9OTM JIJOMER CONSTRUCTION Repair / Rehab. of Ramon Birth... See more Isabela Approved 2025-07-07 07:44:01 Ready for Release Processed in 4 working days.
334 DOLE_RO2_2025-07-10_124_YJ6G JIJOMER CONSTRUCTION Repair / Rehab. of San Isidro ... See more Isabela Approved 2025-07-07 07:48:56 Ready for Release Processed in 4 working days.
335 DOLE_RO2_2025-07-10_125_XQS5 JIJOMER CONSTRUCTION Repair / Rehab. of San Isidro ... See more Isabela Approved 2025-07-07 08:24:58 Ready for Release Processed in 4 working days.
336 A-Czar18 Construction Repair/Improvement of Aglipay ... See more Villa Ventura, Aglipay, Quirino Rejected 2025-07-07 10:27:09 Returned to Applicant No COSH Certificate of Umbania... See more
337 7CHIN BUILDERS AND CONSTRUCTION SUPPLY CME-50m, 24sqm, 320kph, 150D k... See more San Agustin, Isabela Rejected 2025-07-07 11:57:02 Returned to Applicant CSHP NOT DULY FILLED OUT (1.0 ... See more
338 ATLANTIC CONSTRUCTION resealing of runway cracks and... See more tuguegarao city, cagayan Rejected 2025-07-07 14:19:55 Returned to Applicant Under DO 252, Series of 2025, ... See more
339 JKA-Ver Construction and Engineering Services FTAP-GLOBE ROLLOUT PROJECT PUROK 4, BRGY. BACKILING, APPARI CAGAYAN Rejected 2025-07-07 15:22:46 Returned to Applicant NO SIGNATURE OF NAME OF CONTRA... See more
340 RSL BUILDERS CORPORATION PH020215 BRGY. MASIPI WEST, CABAGAN, ISABELA Rejected 2025-07-07 15:37:28 Returned to Applicant NO CHE TESTING CERT/CHE OPERAT... See more
341 RSL BUILDERS CORPORATION PH020226 Purok 3 Brgy. Bagu, Pamplona, Cagayan Rejected 2025-07-07 15:42:26 Returned to Applicant NO SIGNATURE OF CONTRACTOR IN ... See more
342 ACES 3 CONSTRUCTION PB-CW-2025-045-Reconstruction ... See more Ricarte Sur, Diffun, Quirino Rejected 2025-07-07 16:51:15 Returned to Applicant Require NCII for electrical, w... See more
343 DOLE_RO2_2025-07-10_126_XILX ACES 3 CONSTRUCTION PB-CW-2025-046 Magsaysay,Diffun,Quirino Approved 2025-07-07 16:57:04 Ready for Release Processed in 3 working days.
344 RJR'S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more CARUPIAN , BAGGAO, CAGAYAN Rejected 2025-07-08 09:41:01 Returned to Applicant FILL OUT PROPERLY THE CSHP APP... See more
345 RJR'S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more IBULO , BAGGAO, CAGAYAN Rejected 2025-07-08 09:44:05 Returned to Applicant FILL OUT PROPERLY THE CSHP APP... See more
346 RJR'S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more SANTA MARGARITA,BAGGAO,CAGAYAN Rejected 2025-07-08 09:45:42 Returned to Applicant FILL OUT PROPERLY THE CSHP APP... See more
347 DOLE_RO2_2025-07-11_136_2H4M SIFU J BUILDERS CORPORATION Widening Farm to Market Road P... See more Brgy. Tukod, Kasibu, Nueva Vizcaya Approved 2025-07-08 10:46:39 Ready for Release Processed in 4 working days.
348 DOLE_RO2_2025-07-11_137_XZ84 WILLIE'S CONSTRUCTION CONSTRUCTION OF 4'' CHB CANAL ... See more ARITAO, NUEVA VIZCAYA Approved 2025-07-08 11:31:47 Ready for Release Processed in 3 working days.
349 3JMS COSNTRUCTION REHABILITATION OF ROAD ALONG S... See more SORIANO STREET, PALLUA SUR, TUGUEGARAO CITY Rejected 2025-07-08 13:14:23 Returned to Applicant 1. FIRST AIDER SHOULD BE A 4-D... See more
350 DOLE_RO2_2025-07-10_127_BID0 D.A CADELIÑA CONSTRUCTION INFRA-NCB-NVIMO-30-25 CONSTRUC... See more BAGABAG, NUEVA VIZCAYA Approved 2025-07-08 13:38:43 Ready for Release Processed in 2 working days.
351 DOLE_RO2_2025-07-10_128_A50T HORIVER CONSTRUCTION IMPROVEMENT OF BASEMENT OF TUG... See more Carig Sur, Tuguegarao City Approved 2025-07-08 13:53:44 Ready for Release Processed in 2 working days.
352 Branics Construction Services Concreting of Verona Digitel R... See more Verona, Didipio, Kasibu, Nueva Vizcaya Rejected 2025-07-08 16:11:55 Returned to Applicant 1. Provide for the Lease Agree... See more
353 DOLE_RO2_2025-07-11_138_MVAS Aligwa Construction Services Improvement of Irrigation Cana... See more Didipio, Kasibu, Nueva Vizcaya Approved 2025-07-08 16:17:46 Ready for Release Processed in 3 working days.
354 RD BEDAÑA CONSTRUCTION AND SUPPLIES STREET LIGHTING PROJECT ALONG ... See more DADAP, LUNA, ISABELA Rejected 2025-07-08 16:42:03 Returned to Applicant FINISHED PROJECT (JULY 10, 202... See more
355 DOLE_RO2_2025-07-11_139_J7XM RJR'S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more ALBA,BAGGAO,CAGAYAN Approved 2025-07-08 16:48:17 Ready for Release Processed in 3 working days.
356 DOLE_RO2_2025-07-10_129_A2IL JHUERS CONSTRUCTION PB-CW-2025-024 (RE-ADVERTISED)... See more STO.NIÑO, MADDELA, QUIRINO Approved 2025-07-08 16:50:34 Ready for Release Processed in 2 working days.
357 DOLE_RO2_2025-07-11_140_70RR V.S. LAUNGAYAN HARDWARE AND CONSTRUCTION SUPPLY IB 2025-02-04(01) - INFRASTRUC... See more Pamplona, Cagayan Approved 2025-07-09 08:26:27 Ready for Release Processed in 3 working days.
358 DOLE_RO2_2025-07-11_141_N3Y8 V.S. LAUNGAYAN HARDWARE AND CONSTRUCTION SUPPLY IB 2025-02-04(01) - INFRASTRUC... See more Libertad, Abulug, Cadayan Approved 2025-07-09 08:40:09 Ready for Release Processed in 3 working days.
359 Municipality of Aglipay, Quirino CONSTRUCTION OF STONE MASONRY ... See more Guinalbin, Aglipay, Quirino Rejected 2025-07-09 10:02:54 Returned to Applicant NCII Certificate of Mr. Bayana... See more
360 DOLE_RO2_2025-07-11_142_FRC0 RJR'S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more AGAMAN SUR, BAGGAO, CAGAYAN Approved 2025-07-09 11:07:19 Ready for Release Processed in 3 working days.
361 DOLE_RO2_2025-07-11_143_11T7 RJR'S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more BITAG GRANDE , BAGGAO, CAGAYAN Approved 2025-07-09 11:09:46 Ready for Release Processed in 3 working days.
362 DOLE_RO2_2025-07-11_144_NICJ RJR'S CONSTRUCTION CONSTRUCTION/COMPLETION OF DRI... See more TALLANG,BAGGAO,CAGAYAN Approved 2025-07-09 11:18:05 Ready for Release Processed in 2 working days.
363 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF NORT... See more ABULUG, CAGAYAN Rejected 2025-07-09 11:44:39 Returned to Applicant Total project cost did not mat... See more
364 DOLE_RO2_2025-07-10_130_5829 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF NORT... See more ABULUG, CAGAYAN Approved 2025-07-09 11:58:44 Ready for Release Processed in 1 working days.
365 DOLE_RO2_2025-07-11_145_JSR2 BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF LAPA... See more CABATUAN, ISABELA Approved 2025-07-09 13:30:08 Ready for Release Processed in 2 working days.
366 DOLE_RO2_2025-07-11_146_2IWL BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF ROXA... See more ROXAS, ISABELA Approved 2025-07-09 13:31:21 Ready for Release Processed in 2 working days.
367 DOLE_RO2_2025-07-11_147_6CQW BIFESA CONSTRUCTION REPAIR/ REHABILITATION OF SAN ... See more SAN MATEO, ISABELA Approved 2025-07-09 13:32:30 Ready for Release Processed in 2 working days.
368 DOLE_RO2_2025-07-14_153_OUVW JHUERS CONSTRUCTION PB-CW-2025-33 CONSTRUCTION/ CO... See more GURIBANG, DIFFUN, QUIRINO Approved 2025-07-09 16:20:58 Ready for Release Processed in 3 working days.
369 JHUERS CONSTRUCTION PB-CW-2025-023 (RE- ADVERTISED... See more PEDLISAN, MADDELA, QUIRINO Rejected 2025-07-09 16:26:05 Returned to Applicant Unsigned application form
370 DOLE_RO2_2025-07-14_154_TO6R JHUERS CONSTRUCTION NCB-INFRA-QIMO-01-25, P1- ADRI... See more AGLIPAY, QUIRINO Approved 2025-07-09 16:30:14 Ready for Release Processed in 3 working days.
371 DOLE_RO2_2025-07-14_155_AG76 JHUERS CONSTRUCTION PB-CW-2025-060 RENOVATION OF C... See more CAPITOL HILLS, CABARROGUIS, QUIRINO Approved 2025-07-09 16:36:34 Ready for Release Processed in 3 working days.
372 DOLE_RO2_2025-07-16_163_WBIP JHUERS CONSTRUCTION PB-CW-2025-042 CONSTRUCTION OF... See more SAN SALVADOR, MADDELA, QUIRINO Approved 2025-07-09 16:48:47 Ready for Release Processed in 5 working days.
373 DOLE_RO2_2025-07-16_164_ETVN JHUERS CONSTRUCTION NCB-INFRA-QIMO-03-25- CABUGBUG... See more CABARROGUIS, QUIRINO Approved 2025-07-09 16:53:10 Ready for Release Processed in 5 working days.
374 DOLE_RO2_2025-07-16_165_CALL JHUERS CONSTRUCTION PB-CW-2025-031 CONSTRUCTION/ C... See more PROGRESO, AGLIPAY, QUIRINO Approved 2025-07-09 17:04:07 Ready for Release Processed in 5 working days.
375 DOLE_RO2_2025-07-16_166_R5K1 JHUERS CONSTRUCTION LGU-DIADI BAC 2025-05-CONSTRUC... See more DIADI, NUEVA VIZCAYA Approved 2025-07-10 09:13:32 Ready for Release Processed in 4 working days.
376 DOLE_RO2_2025-07-16_167_PUM3 JHUERS CONSTRUCTION 8000-000-3-1-10-007-006-009-CO... See more BARANGAY STA. MARIA, DUPAX DEL SUR, NUEVA VIZCAYA Approved 2025-07-10 09:29:11 Ready for Release Processed in 4 working days.
377 DOLE_RO2_2025-07-11_149_Y31X JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-70-25 CONSTRUC... See more SAN GUILLERMO AND CLAVERIA, CAGAYAN Approved 2025-07-10 09:59:32 Ready for Release Processed in 2 working days.
378 DOLE_RO2_2025-07-11_148_KDSX JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-71-25 CONSTRUC... See more LUZON, CLAVERIA, CAGAYAN Approved 2025-07-10 10:14:32 Ready for Release Processed in 2 working days.
379 DOLE_RO2_2025-07-11_150_R9YM JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-72-25 CONSTRUC... See more MACTEL, CLAVERIA, CAGAYAN Approved 2025-07-10 10:21:11 Ready for Release Processed in 2 working days.
380 DOLE_RO2_2025-07-11_151_TLQC JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-76-25 CONSTRUC... See more CLAVERIA, CAGAYAN Approved 2025-07-10 10:26:32 Ready for Release Processed in 2 working days.
381 DOLE_RO2_2025-07-11_152_DPV8 JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-77-25 CONSTRUC... See more CLAVERIA, CAGAYAN Approved 2025-07-10 10:38:09 Ready for Release Processed in 2 working days.
382 DOLE_RO2_2025-07-16_168_KBZU MASTER Z CONSTRUCTION SERVICES CONSTRUCTION OF RIVER WALL PHA... See more BINTAWAN SUR, VILLAVERDE, NUEVA VIZCAYA Approved 2025-07-10 11:39:49 Ready for Release Processed in 5 working days.
383 DOLE_RO2_2025-07-16_169_NU19 DKB CONSTRUCTION CONCRETING OF ROAD AT SITIO CA... See more REMUS, BAGGAO,CAGAYAN Approved 2025-07-10 12:09:15 Ready for Release Processed in 5 working days.
384 DOLE_RO2_2025-07-16_170_2PAG DKB CONSTRUCTION CONSTRUCTION OF EVACUATION CEN... See more SAN JOSE, BAGGAO, CAGAYAN Approved 2025-07-10 12:23:43 Ready for Release Processed in 5 working days.
385 DOLE_RO2_2025-07-16_171_TERE DKB CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more BUNUGAN, BAGGAO, CAGAYAN Approved 2025-07-10 12:27:58 Ready for Release Processed in 5 working days.
386 DOLE_RO2_2025-07-16_172_8BZW JHUERS CONSTRUCTION 8000-000-3-1-10-006-001-000-CO... See more BARANGAY DOMANG, DUPAX DEL SUR, NUEVA VIZCAYA Approved 2025-07-10 12:53:42 Ready for Release Processed in 5 working days.
387 DOLE_RO2_2025-07-16_173_ZNHT JHUERS CONSTRUCTION LGU - DIADI BAC 2025-03-CONSTR... See more DIADI, NUEVA VIZCAYA Approved 2025-07-10 14:14:02 Ready for Release Processed in 5 working days.
388 DOLE_RO2_2025-07-16_174_10A2 DOUBLE-D CONSTRUCTION REHABILITATION OF MASONRY DRAI... See more LEGASPI STREET, CENTRO 8, TUGUEGARAO CITY Approved 2025-07-10 14:33:55 Ready for Release Processed in 5 working days.
389 RD BEDAÑA CONSTRUCTION AND SUPPLIES STREET LIGHTING PROJECT ALONG ... See more DADAP, LUNA, ISABELA Rejected 2025-07-10 14:41:53 Returned to Applicant TAGGED AS FINISHED PROJECT
390 DOLE_RO2_2025-07-16_175_BUUU E.L. CHAN CONSTRUCTION AND DEVELOPMENT RELOCATION of Metrobank-Maharl... See more R4 Tower. Quezon St. Cauayan City, Isabela Approved 2025-07-10 15:49:27 Ready for Release Processed in 5 working days.
391 DOLE_RO2_2025-07-16_176_TYSA RD BEDAÑA CONSTRUCTION AND SUPPLIES STREET LIGHTING PROJECT ALONG ... See more DADAP, LUNA, ISABELA Approved 2025-07-10 16:03:48 Ready for Release Processed in 5 working days.
392 DOLE_RO2_2025-07-16_177_PYMF RD BEDAÑA CONSTRUCTION AND SUPPLIES STREET LIGHTING PROJECT IN BAR... See more BARANGAY MACUGAY, LUNA, ISABELA Approved 2025-07-10 16:15:04 Ready for Release Processed in 5 working days.
393 JIJOMER CONSTRUCTION Repair / Rehab. of Ramon Rural... See more Isabela Rejected 2025-07-10 16:33:11 Returned to Applicant NO SIGNATURE OF THE PROJ
394 DOLE_RO2_2025-07-16_178_B74N JHUERS CONSTRUCTION PB-CW-2025-038 CONSTRUCTION OF... See more SAN PASCUAL, DIFFUN, QUIRINO Approved 2025-07-10 17:43:20 Ready for Release Processed in 4 working days.
395 DOLE_RO2_2025-07-16_179_L6K5 JHUERS CONSTRUCTION PB-CW-2025-043 CONSTRUCTION OF... See more STO. TOMAS, MADDELA, QUIRINO Approved 2025-07-10 17:48:23 Ready for Release Processed in 4 working days.
396 DOLE_RO2_2025-07-16_180_QUNM JHUERS CONSTRUCTION PB-CW-2025-048 RECONSTRUCTION ... See more MADDELA, QUIRINO Approved 2025-07-10 17:51:54 Ready for Release Processed in 4 working days.
397 DOLE_RO2_2025-07-16_181_KQKR JHUERS CONSTRUCTION PB-CW-2025-011 IMPROVEMENT/ CO... See more SAN ISIDRO, DIFFUN, QUIRINO Approved 2025-07-10 17:55:44 Ready for Release Processed in 4 working days.
398 DOLE_RO2_2025-07-16_182_Y2OR W.S FAGCANGAN CONSTRUCTION MANAGEMENT SERVICES REHABILITATION OF VGH GYMNASIU... See more BAGGAO CAGAYAN Approved 2025-07-11 07:48:33 Ready for Release Processed in 4 working days.
399 RSL BUILDERS ORPORATION BRGY MASIPI WEST CABAGAN ISABELA Rejected 2025-07-11 12:11:06 Returned to Applicant NO CHE TESTING CERT/CHE OPERAT... See more
400 RD TALENS CONSTRUCTION AND TRADING DESIGN AND BUILD FOR THE ESTAB... See more CAGAYAN Rejected 2025-07-11 13:59:16 Returned to Applicant NO SIGNATURE OVER PRINTED NAME... See more
401 RD TALENS CONSTRUCTION AND TRADING DESIGN AND BUILD FOR THE ESTAB... See more ISABELA Rejected 2025-07-11 14:02:22 Returned to Applicant 1. No signature of the project... See more
402 DOLE_RO2_2025-07-16_183_7PJ5 G.M. PAJARILLAGA CONSTRUCTION & SUPPLY INFRA-NCB-NVIMO-17-25, PACKAGE... See more VILLAVERDE, NUEVA VIZCAYA Approved 2025-07-11 14:06:08 Ready for Release Processed in 4 working days.
403 DOLE_RO2_2025-07-14_156_GG2O NAJU-SHRINE CONSTRUCTION SERVICES CONSTRUCTION OF MULTI-PURPOSE ... See more BARANGAY PAO, KASIBU, NUEVA VZICAYA Approved 2025-07-11 14:12:37 Ready for Release Processed in 2 working days.
404 DOLE_RO2_2025-07-16_184_2HKF ACES 3 CONSTRUCTION PB-CW-2025-045-Reconstruction ... See more Ricarte Sur, Diffun, Quirino Approved 2025-07-11 15:20:53 Ready for Release Processed in 4 working days.
405 Lancesoft Infra Solution Inc E02911-B05 / NS-NTG23-I44 ZONE 2, BRGY. CALITLITAN, ARITAO, NUEVA VIZCAYA Rejected 2025-07-11 15:43:16 Returned to Applicant no attached application form a... See more
406 Lancesoft Infra Solution Inc E02878 B06 / NS-TER24 B113 HT MP1 BRGY LUBLUB POBLACION ALFONSO CASTANEDA NUEVA VIZCAYA Rejected 2025-07-11 16:31:21 Returned to Applicant no attachments
407 DOLE_RO2_2025-07-15_162_FOCZ 5MJ'S CONSTRUCTION CONSTRUCTION OF BAYBAYOG AGRI-... See more BAYBAYOG, ALCALA, CAGAYAN Approved 2025-07-11 16:54:05 Ready for Release Processed in 2 working days.
408 5MJ'S CONSTRUCTION CONCRETING OF JURISDICTION FMR JURISDICTION ALCALA, CAGAYAN Rejected 2025-07-11 17:00:41 Returned to Applicant UNSIGNED PCAB LICENSE, NO CHE ... See more
409 DOLE_RO2_2025-07-14_157_U2D1 NAJU-SHRINE CONSTRUCTION SERVICES IMPROVEMENT OF BARANGAY ROADS ... See more BRGY. PAO, KASIBU, NUEVA VIZCAYA Approved 2025-07-13 10:33:08 Ready for Release Processed in 1 working days.
410 DOLE_RO2_2025-07-14_158_XZVA NAJU-SHRINE CONSTRUCTION SERVICES IMPROVEMENT OF KINAPIAN FMR-PU... See more BRGY. PAO, KASIBU, NUEVA VIZCAYA Approved 2025-07-13 10:37:25 Ready for Release Processed in 1 working days.
411 DOLE_RO2_2025-07-16_185_IHBX SKYELER'S CONSTRUCTION SERVICES INSTALLATION OF SOLAR STREETLI... See more BAYOMBONG, NUEVA VIZCAYA Approved 2025-07-13 10:46:17 Ready for Release Processed in 3 working days.
412 DOLE_RO2_2025-07-16_186_E8S0 D' BROTHERS INTERNATIONAL TRADING CORPORATION NCB-INFRA-QIMO-11-25, DUMALINT... See more DIFFUN, QUIRINO Approved 2025-07-13 10:56:55 Ready for Release Processed in 3 working days.
413 DOLE_RO2_2025-07-16_187_UAOK RD BEDAÑA CONSTRUCTION AND SUPPLIES STREET LIGHTING PROJECT IN BAR... See more BARANGAY PULAY, LUNA, ISABELA Approved 2025-07-14 09:20:58 Ready for Release Processed in 3 working days.
414 DOLE_RO2_2025-07-16_188_NYLZ RD BEDAÑA CONSTRUCTION AND SUPPLIES STREET LIGHTING PROJECT IN BAR... See more BARANGAY LALOG 1, LUNA, ISABELA Approved 2025-07-14 09:26:55 Ready for Release Processed in 3 working days.
415 DOLE_RO2_2025-07-16_189_DIK1 Harmonic System Incorporated Limbauan Solar Power Plant Limbauan, San Pablo, Isabela Approved 2025-07-14 10:12:41 Ready for Release Processed in 3 working days.
416 DOLE_RO2_2025-07-16_190_YWY6 CAPITAL CONSTRUCTION Contract No. 2024-DII-RNIS-SAN... See more SAN MATEO, ISABELA Approved 2025-07-14 10:39:37 Ready for Release Processed in 3 working days.
417 DOLE_RO2_2025-07-16_191_3JZX JKA-Ver Construction and Engineering Services FTAP-GLOBE ROLLOUT PROJECT PUROK 4, BRGY. BACKILING, APPARI CAGAYAN Approved 2025-07-14 10:39:49 Ready for Release Processed in 3 working days.
418 JKAVer Construction and Engineering Services FTAP-GLOBE ROLLOUT PROJECT: PH... See more Brgy. San Juan Quezon, Isabela Rejected 2025-07-14 11:33:47 Returned to Applicant H.E. not indicated in the appl... See more
419 RD TALENS CONSTRUCTION AND TRADING DESIGN AND BUILD FOR THE ESTAB... See more CAGAYAN Rejected 2025-07-14 15:52:45 Returned to Applicant CSHP TEMPLATE NOT SIGNED BY TH... See more
420 RD TALENS CONSTRUCTION AND TRADING DESIGN AND BUILD FOR THE ESTAB... See more ISABELA Rejected 2025-07-14 15:54:48 Returned to Applicant HEAVY EQUIPMENT (BULLDOZER, DU... See more
421 DOLE_RO2_2025-08-06_282_USUI MNL INC. BARANGAY KAYCHANARIANAN BASCO BATANES Approved 2025-07-14 16:17:15 Ready for Release Processed in 17 working days.
422 DOLE_RO2_2025-08-06_283_H8JR MNL INC. CONSTRUCTION OF SELF SUPPORTIN... See more NATIONAL RD SITIO CALAVANAN STA LUCIA ITBAYAT BATANES Approved 2025-07-14 16:21:35 Ready for Release Processed in 17 working days.
423 DOLE_RO2_2025-07-15_159_QY5G JMRL DESIGN AND CONSTRUCTION INFRA-NCB-NVIMO-19-25-REHABILI... See more KAYAPA, NUEVA VIZCAYA Approved 2025-07-14 16:57:01 Ready for Release Processed in 1 working days.
424 MNL INC. CONSTRUCTION OF SELF SUPPORTIN... See more MAIN AVE CORR LAKANDULA ST BRGY SAN GABRIEL TUGUEGARAO CITY CAGAYAN Rejected 2025-07-14 17:48:25 Returned to Applicant NO NC2 FOR SCAFFOLDING
425 DOLE_RO2_2025-07-15_160_MOVJ MIZRACH'S CONSTRUCTION SERVICES CONSTRUCTION OF STONE MASONRY ... See more Guinalbin, Aglipay, Quirino Approved 2025-07-15 08:05:22 Ready for Release Processed in 1 working days.
426 MA TESORO CONSTRUCTION INFRA 25-10-30-PACKAGE 25-30: ... See more SANTIAGO CITY,ISABELA Rejected 2025-07-15 08:32:06 Returned to Applicant NO LOI, APPLICATION FORM, CSHP... See more
427 MA TESORO CONSTRUCTION INFRA 25-10-30-PACKAGE 25-30: ... See more SANTIAGO CITY,ISABELA Rejected 2025-07-15 09:03:11 Returned to Applicant 1. ADDITIONAL 1 SAFETY OFFICER... See more
428 MA TESORO CONSTRUCTION INFRA 25-10-31-PACKAGE 25-31: ... See more SANTIAGO CITY,ISABELA Rejected 2025-07-15 09:08:15 Returned to Applicant 1. ADDITIONAL 1 SAFEWTY OFFICE... See more
429 DOLE_RO2_2025-07-15_161_PMFY JHUERS CONSTRUCTION PB-CW-2025-028 CONSTRUCTION/ C... See more COFCAVILLE, MADDELA, QUIRINO Approved 2025-07-15 10:08:30 Ready for Release Processed in 1 working days.
430 JHUERS CONSTRUCTION PB-CW-2025-023 (RE-ADVERTISED)... See more PEDLISAN, AGLIPAY, QUIRINO Rejected 2025-07-15 10:26:16 Returned to Applicant Findings: 1. Safety Officer H... See more
431 A&J DESIGNS AND CONSTRUCTION REPAIR/REHABILITATION OF PLGU ... See more NUEVA VIZCAYA STATE UNIVERSITY- BAMBANG CAMPUS Rejected 2025-07-15 13:33:54 Returned to Applicant Properly Fill out Template
432 JIT BUILDERS Completion/Upgrading/Repair of... See more Burgos, Cabarroguis, Quirino. Rejected 2025-07-15 14:14:29 Returned to Applicant Findings: 1. Skilled Worker C... See more
433 JIT BUILDERS Completion/Upgrading/Repair of... See more Tucod, Cabarroguis, Quirino Rejected 2025-07-15 15:11:32 Returned to Applicant Findings: 1. Skilled Worker C... See more
434 MIG AGGREGATES AND CONCRETE PRODUCTS IMPROVEMENT OF OFFICE COMPOUND... See more CALAPANGAN, STO. NIÑO, CAGAYAN Rejected 2025-07-15 16:52:33 Returned to Applicant INCOMPLETE ATTACHEMENT
435 MIG AGGREGATES AND CONCRETE PRODUCTS SUPPLY, DELIVERY AND INSTALLAT... See more CALAPANGAN, STO. NIÑO, CAGAYAN Rejected 2025-07-15 18:57:04 Returned to Applicant INCOMPLETE ATTACHMENT
436 7CHIN BUILDERS AND CONSTRUCTION SUPPLY CME-45m, 24sqm, 320kph, 150D k... See more Benito Soliven, Isabela Rejected 2025-07-16 07:50:41 Returned to Applicant DOUBLE ENTRY #599
437 DOLE_RO2_2025-07-17_193_ANZI CMGD CONSTRUCTION SVP-PR NO. CP-2025-01-0007 GEP... See more NIA, MARIIS, MINANTE I, CAUAYAN CITY, ISABELA Approved 2025-07-16 08:31:39 Ready for Release Processed in 2 working days.
438 DOLE_RO2_2025-07-17_194_V78I JHUERS CONSTRUCTION PB-CW-2025-023 (RE- ADVERTISED... See more PEDLISAN, MADDELA, QUIRINO Approved 2025-07-16 08:44:36 Ready for Release Processed in 2 working days.
439 DOLE_RO2_2025-07-21_201_E9NH D. MORALES CONSTRUCTION REHABILITATION OF MASONRY DRAI... See more DEL ROSARIO ST., CENTRO 4, TUGUEGARAO CITY, CAGAYAN Approved 2025-07-16 08:52:24 Ready for Release Processed in 4 working days.
440 8J BUILDERS AND SUPPLY COMPLETION OF DRAINAGE SYSTEM ... See more PUROK 4, VILLAMOR, CABARROGUIS, QUIRINO Rejected 2025-07-16 09:07:22 Returned to Applicant Incomplete documents
441 7CHIN BUILDERS AND CONSTRUCTION SUPPLY CME-45m, 24sqm, 320kph, 150D k... See more Benito Soliven, Isabela Rejected 2025-07-16 09:12:39 Returned to Applicant NO CSHP TEMPLATE ATTACHED.
442 7CHIN BUILDERS AND CONSTRUCTION SUPPLY CME-50m, 24sqm, 320kph, 150D k... See more San agustin, Isabela Rejected 2025-07-16 10:12:02 Returned to Applicant LETTER OF INTENT MUST BE SIGNE... See more
443 MIG AGGREGATES AND CONCRETE PRODUCTS ESTABLISHMENT OF NURSERY AND W... See more CALAPANGAN, STO. NIÑO, CAGAYAN Rejected 2025-07-16 10:26:35 Returned to Applicant INCOMPLETE ATTACHMENT
444 MNL INC. CONSTRUCTION OF SELF SUPPORTIN... See more MAIN AVE CORR LAKANDULA ST BRGY SAN GABRIEL TUGUEGARAO CITY CAGAYAN Rejected 2025-07-16 10:45:22 Returned to Applicant NC2 FOR SCAFFOLDER, ELECTRICIA... See more
445 DOLE_RO2_2025-07-16_192_YYV5 5MJ'S CONSTRUCTION Concreting of Jurisdiction FMR Jurisdiction, Alcala, Cagayan Approved 2025-07-16 11:11:18 Ready for Release Processed in 1 working days.
446 Gualon Construction Construction of Cemetery Road ... See more Barangay Paitan, Bayombong, Nueva Vizcaya Rejected 2025-07-16 11:44:28 Returned to Applicant 1. Application Form and Templa... See more
447 SCR CONSTRUCTION AND ENTERPRISES NCB-INFRA-QIMO-27-24 CONSTRUCT... See more MADDELA, QUIRINO Rejected 2025-07-16 12:08:03 Returned to Applicant Safety Officers and First Aide... See more
448 DOLE_RO2_2025-07-21_202_O7OH 7CHIN BUILDERS AND CONSTRUCTION SUPPLY CME-50m, 24sqm, 320kph, 150D k... See more CLAVERIA, CAGAYAN Approved 2025-07-16 15:26:37 Ready for Release Processed in 3 working days.
449 DOLE_RO2_2025-07-17_195_C0FG 7CHIN BUILDERS AND CONSTRUCTION SUPPLY CME-45m, 24sqm, 320kph, 150D k... See more Benito Soliven, Isabela Approved 2025-07-16 17:29:46 Ready for Release Processed in 1 working days.
450 DOLE_RO2_2025-07-17_196_70GF 7CHIN BUILDERS AND CONSTRUCTION SUPPLY CME-50m, 24sqm, 320kph, 150D k... See more San Agustin, Isabela Approved 2025-07-16 17:33:50 Ready for Release Processed in 1 working days.
451 ACES 3 CONSTRUCTION PB-CW-2025-050-COMPLETION/UPGR... See more CAMPAMENTO,DIFFUNQUIRINO Rejected 2025-07-17 10:13:20 Returned to Applicant Findings: 1. Safety Officer, ... See more
452 ACES 3 CONSTRUCTION PB-CW-2025-058-COMPLETION/UPGR... See more Magsaysay,Diffun,Quirino Rejected 2025-07-17 10:15:44 Returned to Applicant Findings: 1. Safety Officer, ... See more
453 DOLE_RO2_2025-07-21_203_AEYP RD TALENS CONSTRUCTION AND TRADING DESIGN AND BUILD FOR THE ESTAB... See more CAGAYAN Approved 2025-07-17 11:34:14 Ready for Release Processed in 3 working days.
454 RD TALENS CONSTRUCTION AND TRADING DESIGN AND BUILD FOR THE ESTAB... See more ISABELA Rejected 2025-07-17 11:35:25 Returned to Applicant DOUBLE ENTRY
455 RD TALENS CONSTRUCTION AND TRADING DESIGN AND BUILD FOR THE ESTAB... See more ISABELA Rejected 2025-07-17 11:35:35 Returned to Applicant DOUBLE ENTRY
456 JHUERS CONSTRUCTION PB-CW-2025-032 CONSTRUCTION/ C... See more LIWAYWAY, DIFFUN, QUIRINO Rejected 2025-07-17 13:45:12 Returned to Applicant 1. Please fill out under CSHP ... See more
457 J3P CONSTRUCTION AND DEVELOPE CORPORATION CONSTRUCTION OF MACAÑAO PERMA... See more LUNA, ISABELA Rejected 2025-07-17 15:48:14 Returned to Applicant Certificate of Training of Fir... See more
458 DOLE_RO2_2025-07-21_197_AWBU JHUERS CONSTRUCTION LGU-DIADI BAC 2025-08 CONSTRUC... See more BARANGAY DECABACAN, DIADI, NUEVA VIZCAYA Approved 2025-07-17 17:03:36 Ready for Release Processed in 2 working days.
459 DOLE_RO2_2025-07-21_198_WCN4 JHUERS CONSTRUCTION IMPROVEMENT OF COVERED COURT @... See more ROSARIO, DIADI, NUEVA VIZCAYA Approved 2025-07-17 17:06:50 Ready for Release Processed in 2 working days.
460 DOLE_RO2_2025-07-21_199_EAM2 JHUERS CONSTRUCTION CONSTRUCTION OF OVER FLOW BRID... See more PUROK 6, BONFAL PROPER, BAYOMBONG, NUEVA VIZCAYA Approved 2025-07-17 17:12:37 Ready for Release Processed in 2 working days.
461 J3P CONSTRUCTION AND DEVELOPE CORPORATION CONSTRUCTION OF MACAÑAO PERMA... See more LUNA, ISABELA Rejected 2025-07-17 17:13:20 Returned to Applicant CERTIFICATE OF TRAINING OF FIR... See more
462 JHUERS CONSTRUCTION PB-CW-2025-032 CONSTRUCTION/ C... See more LIWAYWAY, DIFFUN, QUIRINO Rejected 2025-07-17 17:31:03 Returned to Applicant Findings: 1. MARIANNE M. DAPO... See more
463 JKA-Ver Construction and Engineering Services FTAP-GLOBE ROLLOUT PROJECT BRGY. CABESERA, 9 AND 11, ILAGAN CITY, ISABELA Rejected 2025-07-18 08:55:01 Returned to Applicant 1. NC II BACKHOE OPERATOR INVA... See more
464 JKAVer Construction and Engineering Services FTAP - GLOBE ROLLOUT PROJECT: ... See more Brgy. San Juan Quezon, Isabela Rejected 2025-07-18 11:31:01 Returned to Applicant 1. NC II-BACKHOE OPERATOR IS I... See more
465 DOLE_RO2_2025-07-21_200_10EA SCR CONSTRUCTION AND ENTERPRISES NCB-INFRA-QIMO-27-24 CONSTRUCT... See more MADDELA, QUIRINO Approved 2025-07-18 12:10:04 Ready for Release Processed in 1 working days.
466 DOLE_RO2_2025-07-21_204_BO6U JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-79-25 CONSTRUC... See more CLAVERIA, CAGAYAN Approved 2025-07-18 12:38:08 Ready for Release Processed in 2 working days.
467 DOLE_RO2_2025-07-21_205_39F3 JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-81-25 CONSTRUC... See more CLAVERIA, CAGAYAN Approved 2025-07-18 12:42:00 Ready for Release Processed in 2 working days.
468 Juris Construction & Builders PB-CW-2025-019- Improvement of... See more Buenavista, Maddela, Quirino Rejected 2025-07-18 13:44:56 Returned to Applicant Please Attached First Aider ID... See more
469 Juris Construction & Builders PB-CW-2025-039-Construction of... See more Abbag, Maddela, Quirino Rejected 2025-07-18 15:01:51 Returned to Applicant Please Attached First Aider ID... See more
470 DOLE_RO2_2025-07-28_215_7Q2A J.A UBONGEN CONSTRUCTION Lot70 Repair/Rehabilitation of... See more Brgy.Bucal sur Dinapigue Isabela Approved 2025-07-18 16:30:12 Ready for Release Processed in 6 working days.
471 DOLE_RO2_2025-07-28_216_VQYT J. A UBONGEN CONSTRUCTION Lot54 Repair/Rehabilitation o... See more San Agustin Isabela Approved 2025-07-18 16:39:16 Ready for Release Processed in 6 working days.
472 DOLE_RO2_2025-07-23_210_6LWT J. A UBONGEN CONSTRUCTION Lot55 Repair/Rehabilitation of... See more Jones Isabela Approved 2025-07-18 17:04:59 Ready for Release Processed in 3 working days.
473 DOLE_RO2_2025-07-28_217_C8ET RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED TELEC... See more BRGY ZONE III (POB), SAN MARIANO, ISABELA Approved 2025-07-18 18:42:04 Ready for Release Processed in 6 working days.
474 DOLE_RO2_2025-07-28_218_VIP5 J. A UBONGEN CONSTRUCTION Lot58 Repair/Rehabilitation of... See more Barangay Linamanan Jones Isabela Approved 2025-07-21 08:09:05 Ready for Release Processed in 6 working days.
475 J.A UBONGEN CONSTRUCTION Lot72 Repair/Rehabilitation of... See more Barangay Ayod Dinapigue Isabela Rejected 2025-07-21 08:33:35 Returned to Applicant FA AND SO W/ ONGOING PROJECT W... See more
476 DOLE_RO2_2025-07-21_207_26QJ G3M CONSTRUCTION CONCRETING OF BALONG TO BALHI ... See more LABANG, AMBAGUIO, NUEVA VIZCAYA Approved 2025-07-21 10:23:52 Ready for Release Processed in 1 working days.
477 DOLE_RO2_2025-07-21_208_KVVC G3M CONSTRUCTION CONCRETING OF BIT-ANG TO BARAN... See more NAPO, AMBAGUIO, NUEVA VIZCAYA Approved 2025-07-21 10:26:38 Ready for Release Processed in 1 working days.
478 DOLE_RO2_2025-07-21_209_EROZ G3M CONSTRUCTION CONCRETING OF PIHIPI ROAD CAMANDAG, AMBAGUIO, NUEVA VIZCAYA Approved 2025-07-21 10:28:49 Ready for Release Processed in 1 working days.
479 DOLE_RO2_2025-07-21_206_U3RQ TECKCON CONSTRUCTION IB#-2025-39: CONSTRUCTION OF M... See more GADU, SOLANA, CAGAYAN Approved 2025-07-21 10:34:41 Ready for Release Processed in 1 working days.
480 7CHIN BUILDERS AND CONSTRUCTION SUPPLY CME-45m, 24sqm, 320kph, 150D k... See more SAGUDAY QUIRINO Rejected 2025-07-21 10:48:19 Returned to Applicant Letter must Address to Our Re... See more
481 DOLE_RO2_2025-07-23_211_NHZG JC SOLIDARITY CONSTRUCTION NCB-INFRA-ISA124-25-RPIS-GAPPA... See more CAUAYAN CITY, ISABELA Approved 2025-07-21 11:05:08 Ready for Release Processed in 3 working days.
482 DOLE_RO2_2025-07-23_212_63AZ JC SOLIDARITY CONSTRUCTION INFRA-NCB-ISA125-25-RPIS-GAPPA... See more CAUAYAN CITY, ISABELA Approved 2025-07-21 11:09:06 Ready for Release Processed in 3 working days.
483 DOLE_RO2_2025-07-23_213_7I0N JC SOLIDARITY CONSTRUCTION NCB-INFRA-ISA126-25-RSNIS-SPCI... See more CABAGAN, ISABELA Approved 2025-07-21 11:12:37 Ready for Release Processed in 3 working days.
484 JKAVer Construction and Engineering Services FTAP - GLOBE ROLLOUT PROJECT :... See more Brgy. San Juan Quezon, Isabela Rejected 2025-07-21 11:35:32 Returned to Applicant 1. Application form should be ... See more
485 DOLE_RO2_2025-07-29_228_09M2 MA TESORO CONSTRUCTION PACKAGE 25-31: CONSTRUCTION/ I... See more BALUARTE - BANNAWAG NORTE, SANTIAGO CITY Approved 2025-07-21 14:35:08 Ready for Release Processed in 6 working days.
486 DOLE_RO2_2025-07-29_229_4KM5 MA TESORO CONSTRUCTION PACKAGE 25-30: BARANGAY FACILI... See more VARIOUS BARANGAYS, SANTIAGO CITY Approved 2025-07-21 14:37:06 Ready for Release Processed in 6 working days.
487 DOLE_RO2_2025-07-28_219_5RAI JC PALOMO CONSTRUCTION AND CONSTRUCTION SUPPLY CONSTRUCTION OF MACAÑAO PERMA... See more LUNA, ISABELA Approved 2025-07-21 16:17:26 Ready for Release Processed in 5 working days.
488 MNL INC. CONSTRUCTION OF SELF SUPPORTIN... See more MAIN AVE CORR LAKANDULA ST BRGY SAN GABRIEL TUGUEGARAO CITY CAGAYAN Rejected 2025-07-21 16:20:05 Returned to Applicant NO CHE TESTING FOR EQUIPMENT U... See more
489 DOLE_RO2_2025-07-29_230_2FRP JC PALOMO CONSTRUCTION AND CONSTRUCTION SUPPLY CONCRETING OF FMR AT NATIONAL ... See more QUEZON, ISABELA Approved 2025-07-21 16:24:07 Ready for Release Processed in 6 working days.
490 DOLE_RO2_2025-07-28_220_TGST BRANICS CONSTRUCTION SERVICES Concreting of Verona Digitel R... See more Verona, Didipio, Kasibu, Nueva Vizcaya Approved 2025-07-21 18:20:13 Ready for Release Processed in 5 working days.
491 DOLE_RO2_2025-07-28_221_M5AS GUALON CONSTRUCTION CONSTRUCTION OF CEMETERY ROAD ... See more BARANGAY PAITAN, BAYOMBONG, NUEVA VIZCAYA Approved 2025-07-22 09:31:03 Ready for Release Processed in 5 working days.
492 REYROSE CONSTRUCTION CONSTRUCTION OFAND INSTALLATIO... See more camalaniugan, cagayan Rejected 2025-07-22 11:58:23 Returned to Applicant NO NAME AND SIGNATURE OF PROJE... See more
493 SCR CONSTRUCTION AND ENTERPRISES PB-CW-2025-010 IMPROVEMENT/ CO... See more GULAC, DIFFUN, QUIRINO Rejected 2025-07-22 12:41:49 Returned to Applicant Same Person ( First Aider and ... See more
494 DOLE_RO2_2025-07-28_222_30O8 Juris Construction & Builders PB-CW-2025-19-Improvement/Conc... See more Buenavista, Maddela, Quirino Approved 2025-07-22 13:20:06 Ready for Release Processed in 4 working days.
495 DOLE_RO2_2025-07-28_223_M54V Juris Construction & Builders PB-CW-2025-039-Construction of... See more Abbag, Maddela, Quirino Approved 2025-07-22 13:31:25 Ready for Release Processed in 4 working days.
496 YSIDRA CONSTRUCTION INC. Construction of 1 Box Culvert ... See more Agaman Norte, Baggao Cagayan Rejected 2025-07-22 14:41:11 Returned to Applicant NO CSHP TEMPLATE ATTACHED
497 GENTEN BUILDERS REPAIR/REHABILITATION OF CLAVE... See more CLAVERIA,CAGAYAN Rejected 2025-07-22 15:43:09 Returned to Applicant INCOMPLETE ATTACHEMENT
498 GENTEN BUILDERS REPAIR/REHABILITATION OF STA. ... See more STA.PRAXEDES,CAGAYAN Rejected 2025-07-22 16:03:01 Returned to Applicant NO NC2 FOR ELECTRICIAN, NO NC2... See more
499 DOLE_RO2_2025-07-28_224_0YCQ MASTER Z CONSTRUCTION SERVICES REHABILITATION/CONSTRUCTION OF... See more BINTAWAN SUR & BINTAWAN NORTE, VILLAVERDE, NUEVA VIZCAYA Approved 2025-07-22 16:06:33 Ready for Release Processed in 4 working days.
500 RD TALENS CONSTRUCTION AND TRADING DESIGN AND BUILD FOR THE ESTAB... See more ISABELA Rejected 2025-07-22 16:49:45 Returned to Applicant NC2 BULLDOZER FAKE, NC2 SMAW F... See more
501 JHUERS CONSTRUCTION PB-CW-2025-056 COMPLETION/ UPG... See more CALAOCAN, CABARROGUIS, QUIRINO Rejected 2025-07-22 17:29:34 Returned to Applicant FA AND SO WITH EXISTING PROJEC... See more
502 DOLE_RO2_2025-07-28_225_BZ1V JKA-Ver Construction and Engineering Services FTAP-GLOBE ROLLOUT PROJECT BRGY. CABESERA, 9 AND 11, ILAGAN CITY, ISABELA Approved 2025-07-23 08:11:28 Ready for Release Processed in 4 working days.
503 3JMS CONSTRUCTION REHABILITATION OF ROAD ALONG S... See more SORIANO STREET, PALLUA SUR, TUGUEGARAO CITY Rejected 2025-07-23 12:02:56 Returned to Applicant FA AND SO WITH EXISTING PROJEC... See more
504 DOLE_RO2_2025-07-29_231_E7TI EDWIN ERWIN SISON CONSTRUCTION INFRA-NCB-NVIMO-16-25, PACKAGE... See more SOLANO, NUEVA VIZCAYA Approved 2025-07-23 12:34:49 Ready for Release Processed in 4 working days.
505 DOLE_RO2_2025-07-29_232_AWWS DEKM CONSTRUCTION CONSTRUCTION/CONTINUATION OF M... See more SITIO MASISIT, ASASSI, BAGGAO, CAGAYAN Approved 2025-07-23 12:38:47 Ready for Release Processed in 4 working days.
506 DOLE_RO2_2025-07-29_233_NLZY BELANCE BUILDERS & TRADING IMPROVEMENT OF CATAWARAN-KAKID... See more BRGY. CATAWARAN, KASIBU, NUEVA VIZCAYA Approved 2025-07-23 12:39:15 Ready for Release Processed in 4 working days.
507 MIG AGGREGATES AND CONCRETE PRODUCTS IMPROVEMENT OF OFFICE COMPOUND... See more CALAPANGAN, STO. NIÑO, CAGAYAN Rejected 2025-07-23 12:42:33 Returned to Applicant Under DO 252, Series of 2025, ... See more
508 DOLE_RO2_2025-07-29_234_0J2V WINLEI CONSTRUCTION AND SUPPLY IMPROVEMENT OF PUROK 1-2 COMMO... See more SOLANO, NUEVA VIZCAYA Approved 2025-07-23 12:45:23 Ready for Release Processed in 4 working days.
509 MIG AGGREGATES AND CONCRETE PRODUCTS SUPPLY, DELIVERY AND INSTALLAT... See more CALAPANGAN, STO. NIÑO, CAGAYAN Rejected 2025-07-23 12:48:36 Returned to Applicant AS PER DO 252 GUIDELENES 10 WO... See more
510 MIG AGGREGATES AND CONCRETE PRODUCTS ESTABLISHMENT OF NURSERY AND W... See more CALAPANGAN, STO. NIÑO, CAGAYAN Rejected 2025-07-23 12:52:35 Returned to Applicant PROVIDE 2 SO AND 2 FA FOR 10WO... See more
511 JHUERS CONSTRUCTION PB-CW-2025-032 CONSTRUCTION/ C... See more LIWAYWAY, DIFFUN, QUIRINO Rejected 2025-07-23 13:14:12 Returned to Applicant PLEASE ATTACHED NC II OF ELEC... See more
512 JKAVer Construction and Engineering Services FTAP - GLOBE ROLLOUT PROJECT: ... See more Brgy. San Juan Quezon, Isabela Rejected 2025-07-23 13:23:54 Returned to Applicant 1. CSHP TEMPLATE- NOT DULY FIL... See more
513 J.R. MALOLOYON DESIGN AND CONSTRUCTION ENHANCEMENT OF HALLWAY, ENGINE... See more NIA-COMPOUND, NATIONAL HIGHWAY, SAN FERMIN, CAUAYAN CITY, ISABELA Rejected 2025-07-23 14:10:26 Returned to Applicant tagged as finished project, no... See more
514 DOLE_RO2_2025-07-24_214_MUS2 SCR CONSTRUCTION AND ENTERPRISES PB-CW-2025-010 IMPROVEMENT/ CO... See more GULAC, DIFFUN, QUIRINO Approved 2025-07-23 14:25:39 Ready for Release Processed in 2 working days.
515 J.R. MALOLOYON DESIGN AND CONSTRUCTION CONSTRUCTION OF COVERED PATHWA... See more NATIONAL HIGHWAY, SAN FERMIN, CAUAYAN CITY, ISABELA Rejected 2025-07-23 14:26:21 Returned to Applicant NO SIGNATURE OF AMO AT UPPER R... See more
516 DOLE_RO2_2025-07-29_235_PMI5 DEKM CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more HACIENDA-INTAL, BAGGAO, CAGAYAN Approved 2025-07-23 14:39:07 Ready for Release Processed in 4 working days.
517 DOLE_RO2_2025-07-29_236_MXNV CAVAT CAPITOL MERCHANDISING AND CONSTRUCTION Concreting of Road at Alonzo F... See more Lingu, Solana, Cagayan Approved 2025-07-23 14:48:12 Ready for Release Processed in 4 working days.
518 DOLE_RO2_2025-07-29_237_MRJ3 CAVAT CAPITOL MERCHANDISING AND CONSTRUCTION Concreting of Road at Alonzo F... See more Bauan East, Solana, Cagayan Approved 2025-07-23 14:53:48 Ready for Release Processed in 4 working days.
519 MARKGIL CONSTRUCTION FARM TO MARKET ROAD1 ILAGAN ISABELA Rejected 2025-07-23 14:57:32 Returned to Applicant SAMPLE ONLY
520 BMJ BUILDERS Provision of Labor and Materia... See more Carig Sur, Tuguegarao City Rejected 2025-07-23 15:04:07 Returned to Applicant NO NAME AND SIGNATURE OF PROJE... See more
521 Lancesoft Infra Solution Inc E02911-B05 / NS-NTG23-I44 ZONE 2, BRGY. CALITLITAN, ARITAO, NUEVA VIZCAYA Rejected 2025-07-23 16:00:56 Returned to Applicant 1. Unsigned PCAB 2. First Aid... See more
522 Lancesoft Infra Solution Inc E02878 B06 / NS-TER24 B113 HT MP1 BRGY LUBLUB POBLACION ALFONSO CASTANEDA NUEVA VIZCAYA Rejected 2025-07-23 16:12:10 Returned to Applicant 1. Unsigned Template 2. Unsig... See more
523 TOP VISION DESIGN AND CONSTRUCTION SERVICES REPAIR OF 6 CLASSROOMS AT ATUL... See more ATULAYAN,TUGUEGARAO CITY Rejected 2025-07-23 16:31:52 Returned to Applicant FINISHED PROJECTS
524 RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED 45M T... See more BRGY DUMMUN, GATTARAN, CAGAYAN Rejected 2025-07-24 09:19:46 Returned to Applicant APPLICATION FORM NOT PROPERLY ... See more
525 RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED 45M T... See more BRGY MAGUIRIG, SOLANA, CAGAYAN Rejected 2025-07-24 09:25:18 Returned to Applicant APPLICATION FORM NOT PROPERLY ... See more
526 RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED 45M T... See more BRGY LANGAGAN, SANCHEZ-MIRA CAGAYAN Rejected 2025-07-24 09:38:07 Returned to Applicant FA NAD SO WITH EXISTING PROJEC... See more
527 DOLE_RO2_2025-07-28_226_TINN ACES 3 CONSTRUCTION PB-CW-2025-050-COMPLETION/UPGR... See more CAMPAMENTO,DIFFUN QUIRINO Approved 2025-07-24 11:53:18 Ready for Release Processed in 3 working days.
528 DOLE_RO2_2025-07-28_227_PKKJ ACES 3 CONSTRUCTION PB-CW-2025-058-COMPLETION/UPGR... See more Magsaysay,Diffun,Quirino Approved 2025-07-24 11:54:58 Ready for Release Processed in 3 working days.
529 DECA CONSTRUCTION CONSTRUCTION OF SLAUGHTER HOUS... See more MINANGA SUR, LASAM, CAGAYAN Rejected 2025-07-24 13:01:21 Returned to Applicant DOUBLE ENTRY
530 Lancesoft Infra Solution Inc E02911-B05 / NS-NTG23-I44 ZONE 2, BRGY. CALITLITAN, ARITAO, NUEVA VIZCAYA Rejected 2025-07-24 16:04:40 Returned to Applicant Unsigned PCAB
531 Lancesoft Infra Solution Inc E02878 B06 / NS-TER24 B113 HT MP1 BRGY LUBLUB POBLACION ALFONSO CASTANEDA NUEVA VIZCAYA Rejected 2025-07-24 16:13:11 Returned to Applicant Unsigned PCAB
532 RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED 45M T... See more BRGY BAGU, PAMPLONA, CAGAYAN Rejected 2025-07-24 17:11:08 Returned to Applicant DOUBLE ENTRY
533 DOLE_RO2_2025-07-29_240_J7LF JHUERS CONSTRUCTION PB-CW-2025-032 CONSTRUCTION/ C... See more LIWAYWAY, DIFFUN, QUIRINO Approved 2025-07-25 11:32:06 Ready for Release Processed in 3 working days.
534 JHUERS CONSTRUCTION LGU- DIADI BAC 2025-08 IMPROVE... See more PUROK 1 LURAD, SITIO NAGTIM-OG, BUGNAY, PUROK 5 DURUAROG AND PUROK 3 NAGSABARAN, DIADI, NUEVA VIZCAYA Rejected 2025-07-25 12:39:11 Returned to Applicant RAMIL L. CABBIGAT - safety off... See more
535 DOLE_RO2_2025-07-30_244_UY4A JHUERS CONSTRUCTION LGU- DIADI BAC 2025-11 CONSTRU... See more PUROK 2 BARANGAY BUGNAY, DIADI, NUEVA VIZCAYA Approved 2025-07-25 12:44:40 Ready for Release Processed in 4 working days.
536 DOLE_RO2_2025-07-30_245_XKH0 JHUERS CONSTRUCTION LGU- DIADI BAC 2025-12 SLOPE P... See more BARANGAY NAGSABARAN, DIADI, NUEVA VIZCAYA Approved 2025-07-25 12:49:34 Ready for Release Processed in 4 working days.
537 DOLE_RO2_2025-07-30_246_2ENH JHUERS CONSTRUCTION 8000-000-3-1-10-007-002-020 IM... See more BARANGAY MANGAYANG, DUPAX DEL SUR, NUEVA VIZCAYA Approved 2025-07-25 12:55:08 Ready for Release Processed in 4 working days.
538 LAB GENERAL ENGINEERING Repair/Rehabilitation of Duma... See more Jones, Isabela Rejected 2025-07-25 15:41:39 Returned to Applicant NO ATTACHED DOCUMENTARY REQUIR... See more
539 LAB GENERAL ENGINEERING Repair/Rehabilitation of Sto D... See more Jones, Isabela Rejected 2025-07-25 15:47:51 Returned to Applicant NO ATTACHED DOCUMENTARY REQUIR... See more
540 DOLE_RO2_2025-07-30_241_R37O EDWIN ERWIN SISON CONSTRUCTION CONSTRUCTION OF AROSIP CIS BRGY. BASCARAN, SOLANO, NUEVA VIZCAYA Approved 2025-07-26 18:04:41 Ready for Release Processed in 2 working days.
541 DOLE_RO2_2025-07-30_247_IUZD EDWIN ERWIN SISON CONSTRUCTION CONSTRUCTION OF LATUYOT CIS, M... See more BRGY. MAGAPUY, BAYOMBONG, NUEVA VIZCAYA Approved 2025-07-26 18:13:45 Ready for Release Processed in 2 working days.
542 DOLE_RO2_2025-07-30_248_91CQ DECA CONSTRUCTION CONSTRUCTION OF SLAUGHTER HOUS... See more MINANGA SUR, LASAM, CAGAYAN Approved 2025-07-28 13:27:57 Ready for Release Processed in 3 working days.
543 8J BUILDERS AND SUPPLY COMPLETION OF DRAINAGE SYSTEM ... See more PUROK 4, VILLAMOR, CABARROGUIS, QUIRINO Rejected 2025-07-28 13:33:31 Returned to Applicant 1. CSHP program not duly fille... See more
544 DOLE_RO2_2025-07-29_238_43LO JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-82-25 CONSTRUC... See more CLAVERIA, CAGAYAN Approved 2025-07-28 13:35:05 Ready for Release Processed in 1 working days.
545 DOLE_RO2_2025-07-31_249_QGJS RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED TELEC... See more BRGY MARABURAB, ALCALA, CAGAYAN Approved 2025-07-28 14:02:47 Ready for Release Processed in 3 working days.
546 8J BUILDERS AND SUPPLY PB-CW-2025-009 IMPROVEMENT/CON... See more VILLA JOSE YLANAN, MADDELA, QUIRINO Rejected 2025-07-28 16:37:50 Returned to Applicant 1. CSHP PROGRAM NOT DULY FILLE... See more
547 DOLE_RO2_2025-07-30_242_TDWS UPLAND CONSTRUCTION CONCRETING OF BIT-ANG TO BARAN... See more AMMOWEG, AMBAGUIO, NUEVA VIZCAYA Approved 2025-07-28 16:44:28 Ready for Release Processed in 2 working days.
548 UPLAND CONSTRUCTION CONCRETING OF TADYUKONG TO TUP... See more DULLI, AMBAGUIO, NUEVA VIZCAYA Rejected 2025-07-28 16:46:52 Returned to Applicant Safety Officer and First Aider... See more
549 DOLE_RO2_2025-07-31_250_WL08 UPLAND CONSTRUCTION CONCRETING OF LABBI TO LAYLAYA... See more TIBLAC, AMBAGUIO, NUEVA VIZCAYA Approved 2025-07-28 16:49:50 Ready for Release Processed in 3 working days.
550 DOLE_RO2_2025-07-29_239_2JJA MNL INC. CONSTRUCTION OF SELF SUPPORTIN... See more MAIN AVE CORR LAKANDULA ST BRGY SAN GABRIEL TUGUEGARAO CITY CAGAYAN Approved 2025-07-28 16:58:41 Ready for Release Processed in 1 working days.
551 DOLE_RO2_2025-07-30_243_R7E8 WINLEI CONSTRUCTION AND SUPPLY CONCRETING OF BALITON-LINGAY-U... See more BAYOMBONG, NUEVA VIZCAYA Approved 2025-07-28 18:24:53 Ready for Release Processed in 2 working days.
552 SESE CONSTRUCTION SERVICES CONCRETING OF SITIO MALAMBAN F... See more DALAOIG ALCALA CAGAYAN Rejected 2025-07-29 11:10:36 Returned to Applicant INCOMPLETE ATTACHEMENT
553 SESE CONSTRUCTION SERVICES CONCRETING OF SITIO MALAMBAN F... See more DALAOIG ALCALA CAGAYAN Rejected 2025-07-29 11:24:05 Returned to Applicant INCOMPLETE ATTACHEMENT
554 SESE CONSTRUCTION SERVICES CONCRETING OF SITIO MALAMBAN F... See more DALAOIG ALCALA CAGAYAN Rejected 2025-07-29 11:30:58 Returned to Applicant EXPIRED NC2 FOR WHEEL LOADER
555 ATLANTIC CONSTRUCTION repair/rehabilitation of canan... See more cabatuan, isabela Rejected 2025-07-29 14:01:12 Returned to Applicant NO SIGNATURE OF AMO AT UPPER P... See more
556 ATLANTIC CONSTRUCTION resealing of runway cracks and... See more tuguegarao city, cagayan Rejected 2025-07-29 14:04:11 Returned to Applicant 1. CSHP Program not duly fille... See more
557 JKAVer Construction and Engineering Services FTAP-GLOBE ROLLOUT PROJECT: PH... See more Brgy. San Juan Quezon, Isabela Rejected 2025-07-29 15:34:15 Returned to Applicant 1. Lease contract agreement/re... See more
558 LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF LINOM... See more JONES, ISABELA Rejected 2025-07-29 15:48:13 Returned to Applicant NO ATTACHED DOCUMENTARY REQUIR... See more
559 LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF ITBAY... See more ITBAYAT, BATANES Rejected 2025-07-29 15:58:32 Returned to Applicant NO UPLOADED CSHP DOCUMENTS
560 LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF RAE... See more BATANES Rejected 2025-07-29 16:09:06 Returned to Applicant NO UPLOADED CSHP DOCUMENTS
561 JOHN 6:51 BUILDERS CONCRTETING OF ROAD Zone 5, Macababbad St., Annafunan East, Tuguegarao City Rejected 2025-07-29 16:17:25 Returned to Applicant 1. CSHP application & Prog... See more
562 JOHN 6:51 BUILDERS Rejected 2025-07-29 16:20:12 Returned to Applicant 1. CSHP PROGRAM NOT DULY FILLE... See more
563 LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF IMNAJ... See more BATANES Rejected 2025-07-29 16:26:36 Returned to Applicant NO UPLOADED CSHP DOCUMENTS
564 LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF UYUGA... See more BATANES Rejected 2025-07-29 16:35:34 Returned to Applicant NO UPLOADED CSHP DOCUMENTS
565 DOLE_RO2_2025-07-31_251_3B9Q GENTEN BUILDERS REPAIR/REHABILITATION OF STA. ... See more STA. PRAXEDES Approved 2025-07-29 18:05:37 Ready for Release Processed in 2 working days.
566 DOLE_RO2_2025-07-31_252_QWWJ GENTEN BUILDERS REPAIR/REHABILITATION OF CLAVE... See more Claveria, cagayan Approved 2025-07-29 18:14:28 Ready for Release Processed in 2 working days.
567 DOLE_RO2_2025-08-01_255_Z3FP RDJD CONSTRUCTION CONSTRUCTION OF OVERFLOW BRIDG... See more BINUANGAN, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-07-30 10:58:39 Ready for Release Processed in 2 working days.
568 DOLE_RO2_2025-08-01_256_EGNT RDJD CONSTRUCTION IMPROVEMENT OF BARANGAY INABA... See more INABAN, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-07-30 11:04:15 Ready for Release Processed in 2 working days.
569 DOLE_RO2_2025-07-31_253_Z9PH DANDEX CONSTRUCTION CONSTRUCTION OF SPORTS AND CUL... See more ALLACAPAN, CAGAYAN Approved 2025-07-30 13:16:02 Ready for Release Processed in 1 working days.
570 ATLANTIC CONSTRUCTION repair/rehabilitation of canan... See more cabatuan, isabela Rejected 2025-07-30 13:44:05 Returned to Applicant CSHP TEMPLATE NOT DULY FILLED ... See more
571 DOLE_RO2_2025-08-04_257_T1F9 UPLAND CONSTRUCTION CONCRETING OF TADYUKONG TO TUP... See more DULLI, AMBAGUIO, NUEVA VIZCAYA Approved 2025-07-30 17:49:04 Ready for Release Processed in 3 working days.
572 DOLE_RO2_2025-07-31_254_WRD9 REYROSE CONSTRUCTION CONSTRUCTION OFAND INSTALLATIO... See more camalaniugan, cagayan Approved 2025-07-30 18:01:18 Ready for Release Processed in 1 working days.
573 DOLE_RO2_2025-08-04_258_FSI5 JHUERS CONSTRUCTION LGU- DIADI BAC 2025-08 IMPROVE... See more PUROK 1 LURAD, SITIO NAGTIM-OG, BUGNAY, PUROK 5 DURUAROG AND PUROK 3 NAGSABARAN, DIADI, NUEVA VIZCAYA Approved 2025-07-31 08:59:00 Ready for Release Processed in 3 working days.
574 DOLE_RO2_2025-08-04_260_9AEA RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED TELEC... See more BRGY DUMMUN, GATTARAN, CAGAYAN Approved 2025-07-31 10:34:34 Ready for Release Processed in 3 working days.
575 DOLE_RO2_2025-08-04_261_1MAT RJR'S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more J.PALLAGAO,BAGGAO,CAGAYAN Approved 2025-07-31 10:38:59 Ready for Release Processed in 3 working days.
576 DOLE_RO2_2025-08-04_262_A8QI TAMRHEY CONSTRUCTION CONSTRUCTION OF SPRING DEVELOP... See more DOMANG, DUPAX DEL SUR Approved 2025-07-31 10:39:11 Ready for Release Processed in 3 working days.
577 DOLE_RO2_2025-08-04_263_L1JI RJR'S CONSTRUCTION CONSTRUCTION OF BOX CULVERT AT... See more HACIENDA-INTAL,BAGGAO,CAGAYAN Approved 2025-07-31 10:41:12 Ready for Release Processed in 3 working days.
578 DOLE_RO2_2025-08-04_264_4PJ6 TAMRHEY CONSTRUCTION CONSTRUCTION OF CANAL LINING (... See more DOMANG, DUPAX DEL SUR Approved 2025-07-31 10:41:57 Ready for Release Processed in 3 working days.
579 DOLE_RO2_2025-08-04_265_GGK4 RJR'S CONSTRUCTION CONCRETING OF ROAD AT TAGUNTUN... See more TAGUNTUNGAN,BAGGAO,CAGAYAN Approved 2025-07-31 10:44:05 Ready for Release Processed in 3 working days.
580 DOLE_RO2_2025-08-04_266_NDYM TAMRHEY CONSTRUCTION CONSTRUCTION OF SPRING DEVELOP... See more LUKIDNON, DUPAX DEL SUR Approved 2025-07-31 10:44:15 Ready for Release Processed in 3 working days.
581 DOLE_RO2_2025-08-04_267_YDIK RJR'S CONSTRUCTION CONSTRUCTION OF BOX CULVERT AT... See more HACIENDA-INTAL,BAGGAO,CAGAYAN Approved 2025-07-31 10:44:41 Ready for Release Processed in 3 working days.
582 DOLE_RO2_2025-08-04_268_8TBE RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED 45M T... See more BRGY MAGUIRIG, SOLANA, CAGAYAN Approved 2025-07-31 10:57:39 Ready for Release Processed in 3 working days.
583 DOLE_RO2_2025-08-04_259_ZQ4C MASTER Z CONSTRUCTION SERVICES INSTALLATION OF ENERGY EFFICI... See more DOPAJ, DUPAX DEL SUR, NUEVA VIZCAYA Approved 2025-07-31 11:40:56 Ready for Release Processed in 3 working days.
584 DOLE_RO2_2025-08-04_269_IX9M TAMRHEY CONSTRUCTION CONSTRUCTION OF SLOPE PROTECTI... See more PALABOTAN, DUPAX DEL SUR, NUEVA VIZCAYA Approved 2025-07-31 11:46:22 Ready for Release Processed in 3 working days.
585 DOLE_RO2_2025-08-04_270_HSVM TAMRHEY CONSTRUCTION CONCRETING OF ROAD WITH CANAL ... See more GABUT, DUPAX DEL SUR, NUEVA VIZCAYA Approved 2025-07-31 11:49:34 Ready for Release Processed in 3 working days.
586 DOLE_RO2_2025-08-04_271_FG1M JHUERS CONSTRUCTION PB-CW-2025-056 COMPLETION/ UPG... See more CALAOCAN, CABARROGUIS, QUIRINO Approved 2025-07-31 12:36:59 Ready for Release Processed in 3 working days.
587 DOLE_RO2_2025-08-04_272_ES2G RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED 45M T... See more BRGY LANGAGAN, SANCHEZ-MIRA CAGAYAN Approved 2025-07-31 13:39:11 Ready for Release Processed in 3 working days.
588 DOLE_RO2_2025-08-04_273_WF5Z RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED 45M T... See more BRGY BAGU, PAMPLONA, CAGAYAN Approved 2025-07-31 14:22:05 Ready for Release Processed in 3 working days.
589 EGB CONSTRUCTION CORPORATION/JP CALDERON CONSTRUCTION AND GENERAL MERCHANDISING CONSTRUCTION OF SAN PEDRO BRID... See more MALLIG, ISABELA Rejected 2025-07-31 16:46:50 Returned to Applicant There are no attached document... See more
590 EGB CONSTRUCTION CORPORATION/JP CALDERON CONSTRUCTION AND GENERAL MERCHANDISING CONSTRUCTION OF SIEMPRE VIVA B... See more MALLIG, ISABELA Rejected 2025-07-31 16:53:35 Returned to Applicant There are no attached document... See more
591 DOLE_RO2_2025-08-04_274_HEPD J.R. MALOLOYON DESIGN & CONSTRUCTION CONSTRUCTION OF COVERED PATHWA... See more CAUAYAN CITY, ISABELA Approved 2025-07-31 16:54:11 Ready for Release Processed in 2 working days.
592 SESE CONSTRUCTION SERVICES CONCRETING OF SITIO MALAMBAN F... See more DALAOIG ALCALA CAGAYAN Rejected 2025-07-31 17:24:33 Returned to Applicant CSHP PROGRAM NOT DULY FILLED O... See more
593 DOLE_RO2_2025-08-04_275_UJ3P EGB CONSTRUCTION CORPORATION/JP CALDERON CONSTRUCTION AND GENERAL MERCHANDISING CONSTRUCTION OF SIEMPRE VIVA B... See more MALLIG, ISABELA Approved 2025-08-01 10:37:59 Ready for Release Processed in 2 working days.
594 DOLE_RO2_2025-08-04_276_P57F EGB CONSTRUCTION CORPORATION/JP CALDERON CONSTRUCTION AND GENERAL MERCHANDISING CONSTRUCTION OF SAN PEDRO BRID... See more MALLIG, ISABELA Approved 2025-08-01 10:41:12 Ready for Release Processed in 2 working days.
595 JKA-Ver Construction and Engineering Services FTAP-GLOBE ROLLOUT PROJECT PUROK 4, BRGY STA FELOMINA, ABULOG, CAGAYAN Rejected 2025-08-01 14:33:07 Returned to Applicant 1. FIRST AIDER CERTIFICATE IS ... See more
596 MIG AGGREGATES AND CONCRETE PRODUCTS IMPROVEMENT OF OFFICE COMPOUND... See more CALAPANGAN, STO. NIÑO, CAGAYAN Rejected 2025-08-01 14:43:53 Returned to Applicant he submitted CSHP Program is i... See more
597 MIG AGGREGATES AND CONCRETE PRODUCTS SUPPLY, DELIVERY AND INSTALLAT... See more CALAPANGAN, STO. NIÑO, CAGAYAN Rejected 2025-08-01 14:57:54 Returned to Applicant 1. Safety Officer VICTOR JERIC... See more
598 MIG AGGREGATES AND CONCRETE PRODUCTS ESTABLISHMENT OF NURSERY AND W... See more CALAPANGAN, STO. NIÑO, CAGAYAN Rejected 2025-08-01 15:24:23 Returned to Applicant The submitted CSHP Program is ... See more
599 RJR’S CONSTRUCTION CONCRETING OF FMR PHASE 2 AT C... See more CARUPIAN BAGGAO CAGAYAN Rejected 2025-08-01 15:46:07 Returned to Applicant The CSHP application is jurisd... See more
600 DOLE_RO2_2025-08-05_277_MC2X RJR’S CONSTRUCTION CONCRETING OF FMR PHASE II AT ... See more IBULO BAGGAO CAGAYAN Approved 2025-08-01 15:50:21 Ready for Release Processed in 2 working days.
601 DOLE_RO2_2025-08-05_278_Y39P RJR ‘S CONSTRUCTION Concreting of Fmr phase 2 at s... See more Sta margarita baggao cagayan Approved 2025-08-01 15:53:31 Ready for Release Processed in 2 working days.
602 J.F. GABOTERO, INC. IMPROVEMENT/EXPANSION OF PASSE... See more Brgy. Kayvaluganan, Basco, Batanes Rejected 2025-08-01 17:02:33 Returned to Applicant no application , no cshp progr... See more
603 DOLE_RO2_2025-08-06_284_8WTK MACST CONSTRUCTION AND SUPPLY IMPROVEMENT OF FMR-PLANAS ROAD... See more ANTUTOT,KASIBU,NUEVA VIZCAYA Approved 2025-08-01 17:02:44 Ready for Release Processed in 3 working days.
604 DOLE_RO2_2025-08-06_285_YN3U MACST CONSTRUCTION AND SUPPLY CONSTRUCTION OF STANDARD CHILD... See more POBLACION, KASIBU,NUEVA VIZCAYA Approved 2025-08-01 17:09:58 Ready for Release Processed in 3 working days.
605 DOLE_RO2_2025-08-06_286_YZGR J.F. GABOTERO, INC. IMPROVEMENT/ EXPANSION OF PASS... See more BASCO, BATANES Approved 2025-08-01 19:57:24 Ready for Release Processed in 3 working days.
606 CTC Group Inc former Alphateq Inc Globe Roll-out Project PH020189-Brgy. Pinaripad Sur, Aglipay, Quirino Rejected 2025-08-02 11:11:15 Returned to Applicant 1. CSHP Application is not upd... See more
607 RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED 45M T... See more BRGY DARAPIDAP, ARITAO, NUEVA VIZCAYA Rejected 2025-08-04 08:11:08 Returned to Applicant Expired PCAB
608 DOLE_RO2_2025-08-06_287_53NE E.H. MILIO CONSTRUCTION CONSTRUCTION OF CENTRO BAGLAN ... See more LUPA, KASIBU,NUEVA VIZCAYA Approved 2025-08-04 10:15:42 Ready for Release Processed in 2 working days.
609 DOLE_RO2_2025-08-06_288_1UF9 E.H. MILIO CONSTRUCTION IMPROVEMENT OF TADJI-TUKOD ROA... See more TADJI, KASIBU, NUEVA VIZCAYA Approved 2025-08-04 10:22:49 Ready for Release Processed in 2 working days.
610 DOLE_RO2_2025-08-05_279_HR2Q CAVAT CAPITOL MERCHANDISING AND CONSTRUCTION ITB# - 2025-41: Concreting of ... See more Carilucud. Solana, Cagayan Approved 2025-08-04 10:37:04 Ready for Release Processed in 1 working days.
611 DOLE_RO2_2025-08-05_280_BFDK TECKCON CONSTRUCTION IB#-2025-44: CONSTRUCTION OF F... See more FURAGUI, SOLANA, CAGAYAN Approved 2025-08-04 10:41:37 Ready for Release Processed in 1 working days.
612 DOLE_RO2_2025-08-05_281_2WXV RJR'S CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more CARUPIAN , BAGGAO, CAGAYAN Approved 2025-08-04 16:27:52 Ready for Release Processed in 1 working days.
613 DOLE_RO2_2025-08-06_289_GQRQ TAMRHEY CONSTRUCTION CONCRETING OF ROAD AT PARAI (P... See more PUROK RIVERSIDE PARAI, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-08-05 09:15:28 Ready for Release Processed in 1 working days.
614 sample 24BO23213 ISABELA Rejected 2025-08-05 09:27:37 Returned to Applicant sample
615 TAMRHEY CONSTRUCTION IMPROVEMENT OF PUROK MACATE FT... See more MACABENGA,DUPAX DEL NORTE,NUEVA VIZCAYA Rejected 2025-08-05 10:55:59 Returned to Applicant The applicant is Tamrhey Const... See more
616 BELANCE BUILDERS & TRADING IMPROVEMENT OF PUROK MACATE FT... See more MACABENGA,DUPAX DEL NORTE,NUEVA VIZCAYA Rejected 2025-08-05 11:11:42 Returned to Applicant Change Safety Officer and Firs... See more
617 BELANCE BUILDERS & TRADING IMPROVEMENT OF PUROK MACATE FT... See more MACABENGA, DUPAX DEL NORTE,NUEVA VIZCAYA Rejected 2025-08-05 12:45:07 Returned to Applicant Change First Aider and Safety ... See more
618 DOLE_RO2_2025-08-06_290_FYGW JKA-Ver Construction and Engineering Services FTAP-GLOBE ROLLOUT PROJECT PUROK 4, BRGY STA FELOMINA, ABULOG, CAGAYAN Approved 2025-08-05 14:27:01 Ready for Release Processed in 1 working days.
619 DOLE_RO2_2025-08-12_297_AXED TAMRHEY CONSTRUCTION CONCRETING OF ROAD AT PUROK RI... See more PUROK RIVERSIDE, PARAI, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-08-05 15:36:52 Ready for Release Processed in 6 working days.
620 DOLE_RO2_2025-08-12_298_DSH9 BELANCE BUILDERS & TRADING IMPROVEMENT OF PUROK MACATE FT... See more MACABENGA, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-08-05 15:42:35 Ready for Release Processed in 5 working days.
621 J.F. GABOTERO, INC. IMPROVEMENT/ EXPANSION OF PASS... See more BASCO, BATANES Rejected 2025-08-05 16:42:25 Returned to Applicant double entry
622 Markathella Construction Repair/Improvement of Comfort ... See more Nueva Vizcaya State University, Bayombong, Nueva Vizcaya Rejected 2025-08-06 09:55:17 Returned to Applicant incomplete documents.
623 DOLE_RO2_2025-08-07_291_MJ08 CREST92 Construction & Development Corporation Concreting of Road along Zone ... See more Gosi Norte, Tuguegarao City, Cagayan Approved 2025-08-06 09:55:52 Ready for Release Processed in 1 working days.
624 J.F. GABOTERO, INC. REHABILITATION OF POWER HOUSE ... See more BASCO, BATANES Rejected 2025-08-06 11:48:41 Returned to Applicant expired NC2 of heavy equipment... See more
625 BHM CONSTRUCTION Improvement of Potable Water S... See more Cabarroguis, Quirino Rejected 2025-08-06 12:18:18 Returned to Applicant 1. Application Forms and CSHP ... See more
626 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 4CALANT... See more CALANTAC, ALCALA, CAGAYAN Rejected 2025-08-06 12:34:01 Returned to Applicant CHE TESTING ABOUT TO EXPIRE, A... See more
627 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF AFUSING DAGA... See more AFUSING DAGA, ALCALA, CAG Rejected 2025-08-06 12:50:25 Returned to Applicant CHE TESTING CERTIFICATE IS ABO... See more
628 DOLE_RO2_2025-08-07_292_47WE REYROSE CONSTRUCTION CONSTRUCTION OF VERTICAL NICHE... See more camalaniugan, cagayan Approved 2025-08-06 13:38:49 Ready for Release Processed in 1 working days.
629 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF AFUSING DAGA... See more AFUSING DAGA, ALCALA, CAG Rejected 2025-08-06 14:28:25 Returned to Applicant CHE TESTING CERTIFICATE IS ABO... See more
630 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF TUPANG CENTR... See more TUPANG, ALCALA, CAGAYAN Rejected 2025-08-06 14:32:54 Returned to Applicant CHE TESTING CERTIFICATE IS ABO... See more
631 RL MALIONES CONSTRUCTION CONSTRUCTION OF LAMO COVERED C... See more BRGY. LAMO, DUPAX DEL NORTE, NUEVA VIZCAYA Rejected 2025-08-06 14:36:08 Returned to Applicant NO ATTACHMENTS AND TEMPLATE
632 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 1 AFUSI... See more AFUSING DAGA, ALCALA, CAG Rejected 2025-08-06 14:38:20 Returned to Applicant CHE TESTING CERTIFICATE IS ABO... See more
633 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 1 PARED... See more PARED, ALCALA, CAGAYAN Rejected 2025-08-06 14:43:35 Returned to Applicant CHE TESTING CERTIFICATE ABOUT ... See more
634 VB GINES CONSTRUCTION CONSTRUCTION OF WATER TANKS AN... See more BAYOMBONG, NUEVA VIZCAYA Rejected 2025-08-06 15:05:43 Returned to Applicant PCAB NO SIGNATURE
635 3JMS CONSTRUCTION PROPOSED TWO STOREY APARTMENT UGAC SUR, TUGUEGARAO CITY Rejected 2025-08-06 15:10:07 Returned to Applicant 1.0 No submitted sogned statem... See more
636 VB GINES CONSTRUCTION CONSTRUCTION OF WATER TANKS AN... See more BAYOMBONG, NUEVA VIZCAYA Rejected 2025-08-06 15:24:11 Returned to Applicant PCAB NO SIGNATURE
637 DOLE_RO2_2025-08-12_299_CUNJ RL MALIONES CONSTRUCTION CONSTRUCTION OF LAMO COVERED C... See more BRGY. LAMO, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-08-06 15:27:59 Ready for Release Processed in 5 working days.
638 LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF IMNAJ... See more BATANES Rejected 2025-08-06 15:37:41 Returned to Applicant No uploaded CSHP documents
639 LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF UYUGA... See more BATANES Rejected 2025-08-06 15:43:28 Returned to Applicant No uploaded CSHP documents
640 LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF RAELE... See more BATANES Rejected 2025-08-06 15:49:33 Returned to Applicant No uploaded CSHP documents
641 LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF ITBAY... See more BATANES Rejected 2025-08-06 16:12:23 Returned to Applicant No uploaded CSHP documents
642 DOLE_RO2_2025-08-08_293_PTCY SE-SE CONSTRUCTION SERVICES REHABILITATION OF AGANI SWIP-D... See more AGANI ALCALA CAGAYAN Approved 2025-08-06 17:16:44 Ready for Release Processed in 2 working days.
643 DOLE_RO2_2025-08-08_294_1X4C SE-SE CONSTRUCTION SERVICES REHABILITATION OF CABARUAN ROA... See more PINOPOC ALCALA CAGAYAN Approved 2025-08-06 17:25:27 Ready for Release Processed in 2 working days.
644 DOLE_RO2_2025-08-08_295_WH9C SE-SE CONSTRUCTION SERVICES CONCRETING OF SITIO MALAMBAN F... See more DALAOIG ALCALA CAGAYAN Approved 2025-08-06 17:44:54 Ready for Release Processed in 2 working days.
645 Lancesoft Infra Solution Inc E02878 B06 / NS-TER24 B113 HT MP1 BRGY LUBLUB POBLACION ALFONSO CASTANEDA NUEVA VIZCAYA Rejected 2025-08-07 10:15:11 Returned to Applicant Completed Project
646 Lancesoft Infra Solution Inc E02911-B05 / NS-NTG23-I44 ZONE 2, BRGY. CALITLITAN, ARITAO, NUEVA VIZCAYA Rejected 2025-08-07 10:18:46 Returned to Applicant Completed Project
647 7CHIN BUILDERS AND CONSTRUCTION SUPPLY PH020191-CME-45m, 24sqm, 320kp... See more SAGUDAY QUIRINO Rejected 2025-08-07 10:57:31 Returned to Applicant Please attached first Aider ID... See more
648 SE-SE CONSTRUCTION SERVICES REHABILITATION OF MADUPPAPA FM... See more DALAOIG ALCALA CAGAYAN Rejected 2025-08-07 12:01:39 Returned to Applicant . 7.1 - PLEASE ATTACHED SAMPLE... See more
649 DOLE_RO2_2025-08-08_296_LLL9 JKAVer Construction and Engineering Services FTAP-GLOBE ROLLOUT PROJECT: PH... See more Brgy. San Juan Quezon, Isabela Approved 2025-08-07 12:01:57 Ready for Release Processed in 1 working days.
650 VB GINES CONSTRUCTION UPGRADING OF N.V. BENGUET JCT.... See more KAYAPA,NUEVA VIZCAYA Rejected 2025-08-07 12:32:00 Returned to Applicant USIGNED PCAB
651 YSIDRA CONSTRUCTION INC. Construction of 1 Box Culvert ... See more Agaman Norte, Baggao Cagayan Rejected 2025-08-07 12:46:26 Returned to Applicant 1. CSHP application (page2) mi... See more
652 YSIDRA CONSTRUCTION INC. Construction of 1 Box Culvert ... See more Rejected 2025-08-07 14:16:00 Returned to Applicant 1. NO SIGNATURE OF THE AUTHORI... See more
653 3JMS CONSTRUCTION PROPOSED TWO STOREY APARTMENT UGAC SUR, TUGUEGARAO CITY Rejected 2025-08-07 14:59:31 Returned to Applicant 1. UNDER 7.1 OF CSHP TEMPLATE ... See more
654 DOLE_RO2_2025-08-18_316_T1LZ DAWNBUILDERS CONSTRUCTION CORP. Construction of 45 meters 3-Le... See more Brgy. Comon, Aritao, Nueva Vizcaya (16.2643°,121.0422°) Approved 2025-08-07 15:10:26 Ready for Release Processed in 7 working days.
655 W.S FAGCANGAN CONSTRUCTION MANAGEMENT SERVICES Improvement of VGH Gymnasium a... See more San Jose, Baggao, Cagayan Rejected 2025-08-07 15:33:17 Returned to Applicant NOT PROPERLY FILLED OUT FORMS ... See more
656 DEKM CONSTRUCTION Completion of Masisit Elementa... See more Sitio Masisit, Asassi, Baggao, Cagayan Rejected 2025-08-07 16:12:36 Returned to Applicant NOT PROPERLY FILLED OUT FORM
657 CTC Group Inc former Alphateq Inc Globe Roll-out Project PH020189-Brgy. Pinaripad Sur, Aglipay, Quirino Rejected 2025-08-07 21:25:31 Returned to Applicant Please follows the orders of r... See more
658 DOLE_RO2_2025-08-18_317_WX9C RA AGUILAR CONSTRUCTION SERVICES CORP INSTALLATION OF 3-LEGGED 45M T... See more BRGY DARAPIDAP, ARITAO, NUEVA VIZCAYA Approved 2025-08-08 07:56:59 Ready for Release Processed in 7 working days.
659 LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF LINOM... See more ISABELA Rejected 2025-08-08 08:56:29 Returned to Applicant 1. NO NOTICE OF AWARD FROM PRO... See more
660 LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF DUMAW... See more ISABELA Rejected 2025-08-08 09:01:49 Returned to Applicant EXPIRED NCII CARPENTRY 2. NO N... See more
661 LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF STO D... See more ISABELA Rejected 2025-08-08 09:08:17 Returned to Applicant NO NCII SCAFFOLDING
662 LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF RAELE... See more BATANES Rejected 2025-08-08 09:14:27 Returned to Applicant No uploaded CSHP documents
663 LAB GENERAL ENGINEERING REPAIR/REHABILITION OF IMNAJBU... See more BATANES Rejected 2025-08-08 09:19:18 Returned to Applicant SO2 and SA same person
664 DOLE_RO2_2025-08-14_305_04XO LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF UYUGA... See more BATANES Approved 2025-08-08 09:23:54 Ready for Release Processed in 4 working days.
665 DOLE_RO2_2025-08-14_306_OFRY LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF ITBAY... See more BATANES Approved 2025-08-08 09:27:51 Ready for Release Processed in 4 working days.
666 DOLE_RO2_2025-08-12_300_URDS 3JMS CONSTRUCTION PROPOSED TWO STOREY APARTMENT UGAC SUR, TUGUEGARAO CITY Approved 2025-08-08 15:05:24 Ready for Release Processed in 3 working days.
667 DOLE_RO2_2025-08-12_301_3TZ2 MIG AGGREGATES AND CONCRETE PRODUCTS IMPROVEMENT OF OFFICE COMPOUND... See more CALAPANGAN, STO. NIÑO, CAGAYAN Approved 2025-08-08 15:17:09 Ready for Release Processed in 3 working days.
668 DOLE_RO2_2025-08-12_302_ASFR MIG AGGREGATES AND CONCRETE PRODUCTS SUPPLY, DELIVERY AND INSTALLAT... See more CALAPANGAN, STO. NIÑO, CAGAYAN Approved 2025-08-08 15:30:20 Ready for Release Processed in 3 working days.
669 DOLE_RO2_2025-08-12_303_O60E MIG AGGREGATES AND CONCRETE PRODUCTS ESTABLISHMENT OF NURSERY AND W... See more CALAPANGAN, STO. NIÑO, CAGAYAN Approved 2025-08-08 15:33:10 Ready for Release Processed in 3 working days.
670 DOLE_RO2_2025-08-12_304_IFSU SESE CONSTRUCTION SERVICES REHABILITATION OF MADUPPAPA FM... See more CABULUAN ALCALA CAGAYAN Approved 2025-08-08 16:33:25 Ready for Release Processed in 2 working days.
671 DOLE_RO2_2025-08-14_307_6T9H W.S FAGCANGAN CONSTRUCTION MANAGEMENT SERVICES Improvement of VGH Gymnasium a... See more San Jose, Baggao, Cagayan Approved 2025-08-11 11:33:34 Ready for Release Processed in 3 working days.
672 DOLE_RO2_2025-08-14_308_0GDO DKB CONSTRUCTION Construction of 2 Classroom at... See more Poblacion, Baggao, Cagayan Approved 2025-08-11 11:50:47 Ready for Release Processed in 3 working days.
673 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 4 CALAN... See more ZONE 4 CALANTAC FMR, AT CALANTAC, ALCALA, CAGAYAN Rejected 2025-08-11 13:14:59 Returned to Applicant REFER TO 7.1: RESPONSIBLE FOR ... See more
674 DOLE_RO2_2025-08-19_322_FTMW SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF AFUSING DAGA... See more AFUSING DAGA, ALCALA, CAG Approved 2025-08-11 13:22:52 Ready for Release Processed in 6 working days.
675 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 1 PARED... See more PARED, ALCALA, CAGAYAN Rejected 2025-08-11 13:34:43 Returned to Applicant REFER TO 20.0: EMERGENCY PREP... See more
676 DOLE_RO2_2025-08-14_309_OHZZ Markathella Construction Repair/Improvement of Comfort ... See more Nueva Vizcaya State University, Bayombong, Nueva Vizcaya Approved 2025-08-11 13:38:36 Ready for Release Processed in 3 working days.
677 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF AFUSING DAGA... See more AFUSING DAGA, ALCALA, CAGAYAN Rejected 2025-08-11 14:13:51 Returned to Applicant DOUBLE ENTRY
678 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF TUPANG CENTR... See more TUPANG, ALCALA, CAGAYAN Rejected 2025-08-11 14:20:57 Returned to Applicant REFER TO 20.0: EMERGENCY PREPA... See more
679 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 1 AFUSI... See more AFUSING DAGA, ALCALA, CAGAYAN Rejected 2025-08-11 14:30:05 Returned to Applicant REFER TO 20.0: EMERGENCY PREPA... See more
680 DOLE_RO2_2025-08-14_310_PE70 J.F. GABOTERO, INC. REHABILITATION OF POWER HOUSE ... See more BASCO, BATANES Approved 2025-08-11 16:56:11 Ready for Release Processed in 3 working days.
681 DOLE_RO2_2025-08-14_311_OXCE 8J BUILDERS AND SUPPLY PB-CW-2025-009, IMPROVEMENT/CO... See more VILLA JOSE YLANAN, MADDELA, QUIRINO Approved 2025-08-12 08:26:00 Ready for Release Processed in 3 working days.
682 8J BUILDERS AND SUPPLY PB-CW-2025-009, IMPROVEMENT/CO... See more VILLA JOSE YLANAN, MADDELA, QUIRINO Rejected 2025-08-12 08:30:21 Returned to Applicant Duplicate Application
683 DOLE_RO2_2025-08-19_321_7CAT DEKM CONSTRUCTION Completion of Masisit Elementa... See more San Jose, Baggao, Cagayan Approved 2025-08-12 09:10:54 Ready for Release Processed in 5 working days.
684 DOLE_RO2_2025-08-19_323_GQP3 RJR'S CONSTRUCTION Procurement of Repair of River... See more remus , BAGGAO, CAGAYAN Approved 2025-08-12 09:29:06 Ready for Release Processed in 6 working days.
685 DULCA CONSTRUCTION SERVICES 2024-16i: IMPROVEMENT OF MINI-... See more NUEVA VIZCAYA STATE UNIVERSITY, BAYOMBONG, NUEVA VIZCAYA Rejected 2025-08-12 09:51:07 Returned to Applicant Completed Project
686 DOLE_RO2_2025-08-14_312_X72I WINLEI CONSTRUCTION AND SUPPLY CONSTRUCTION OF TEMPORARY LEAR... See more MATAGA-AY ELEMENTARY SCHOOL, JOSE ANCHETA, MADDELA QUIRINO AND SAN MANUEL INTEGRATED SCHOOL BUILDING 1 AND 2 SAN MANUEL, AGLIPAY, QUIRINO. Approved 2025-08-12 11:59:21 Ready for Release Processed in 2 working days.
687 DOLE_RO2_2025-08-14_313_1S2Q KNB CONSTRUCTION REPAIR AND REHABILITATION OF C... See more CAUAYAN CITY ISABELA Approved 2025-08-12 12:59:34 Ready for Release Processed in 2 working days.
688 DOLE_RO2_2025-08-14_314_GXPY KNB CONSTRUCTION REPAIR/REHABILITATION OF NAGUI... See more NAGUILIAN ISABELA Approved 2025-08-12 13:15:31 Ready for Release Processed in 2 working days.
689 DOLE_RO2_2025-08-14_315_PYLX KNB CONSTRUCTION HARANA BARANGAY HEALTH STATION... See more LUNA ISABELA Approved 2025-08-12 13:25:51 Ready for Release Processed in 2 working days.
690 KNB CONSTRUCTION REPAIR/REHABILITATION OF ITBUD... See more UYUGAN BATANES Rejected 2025-08-12 13:43:00 Returned to Applicant The CSHP application is jurisd... See more
691 KNB CONSTRUCTION REPAIR/REHABILITATION OF MAHAT... See more MAHATAO BATANES Rejected 2025-08-12 13:46:57 Returned to Applicant The CSHP application is jurisd... See more
692 KNB CONSTRUCTION REPAIR/REHABILITATION OF PANAT... See more MAHATAO BATANES Rejected 2025-08-12 13:50:38 Returned to Applicant The CSHP application is jurisd... See more
693 DOLE_RO2_2025-08-19_324_BZET SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 4 CALAN... See more CALANTAC, ALCALA, CAGAYAN Approved 2025-08-12 14:08:21 Ready for Release Processed in 5 working days.
694 DOLE_RO2_2025-08-19_325_7RK6 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF AFUSING DAGA... See more AFUSING DAGA, ALCALA, CAG Approved 2025-08-12 14:11:51 Ready for Release Processed in 5 working days.
695 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF TUPANG- CENT... See more TUPANG, ALCALA, CAG Rejected 2025-08-12 14:13:57 Returned to Applicant DOUBLE ENTRY
696 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 1 AFUS... See more AFUSING, DAGA, ALCALA, CAGAYAN Rejected 2025-08-12 14:20:52 Returned to Applicant DOUBLE ENTRY
697 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 1 PARE... See more PARED, ALCALA, CAGAYAN Rejected 2025-08-12 14:25:00 Returned to Applicant DOUBLE ENTRY
698 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF AFUSING DAG... See more AFUSING DAGA, ALCALA, CAGAYAN Rejected 2025-08-12 14:29:03 Returned to Applicant DOUBLE ENTRY
699 PRIMITIVO P. ESLABON CONSTRUCTION AND HARDWARE IMPROVEMENT OF MUNICIPAL PARK ... See more ALLACAPAN, CAGAYAN Rejected 2025-08-12 19:37:13 Returned to Applicant Completed project
700 Kyle MKZ Construction IMPROVEMENT OF FMR (BESSANG-NA... See more DIDIPIO, KASIBU, NUEVA, VIZCAYA Rejected 2025-08-13 09:10:30 Returned to Applicant Finish Project Unsigned and E... See more
701 DOLE_RO2_2025-08-18_318_R7OV 7CHIN BUILDERS AND CONSTRUCTION SUPPLY PH020225-CME-45m, 24sqm, 320kp... See more CORDON ISABELA Approved 2025-08-13 13:26:24 Ready for Release Processed in 3 working days.
702 DOLE_RO2_2025-08-18_319_AJ7N UNDERGROUND TECHNOLOGIES INC. Proposed Hand-holes and Direct... See more SOLANO MUNICIPAL ENGINEERING OFFICE Approved 2025-08-13 15:02:48 Ready for Release Processed in 3 working days.
703 JPLC TRADING 2025-24-HO-COB-01; SUPPLY, DEL... See more NIA – MARIIS HEAD OFFICE Rejected 2025-08-14 08:45:04 Returned to Applicant 1. application form and cshp t... See more
704 ATLANTIC CONSTRUCTION resealing of runway cracks and... See more tuguegarao city, cagayan Rejected 2025-08-14 14:02:56 Returned to Applicant Please reapply. Location of th... See more
705 ATLANTIC CONSTRUCTION repair/rehabilitation of canan... See more cabatuan, isabela Rejected 2025-08-14 14:06:46 Returned to Applicant CSHP TEMPLATE NOT DULY FILLED ... See more
706 DOLE_RO2_2025-08-18_320_YWAX RL MALIONES CONSTRUCTION CONSTRUCTION OF LAMO COVERED C... See more BRGY. LAMO, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-08-15 08:30:52 Ready for Release Processed in 2 working days.
707 BHM CONSTRUCTION Improvement of Potable Water S... See more Cabarroguis, Quirino Rejected 2025-08-15 09:29:20 Returned to Applicant COMPLETED/FINISHED PROJECT
708 DOLE_RO2_2025-08-19_326_U9ID YSIDRA CONSTRUCTION INC. Construction of 1 Box Culvert ... See more Agaman Norte, Baggao Cagayan Approved 2025-08-15 11:30:12 Ready for Release Processed in 3 working days.
709 JS AND ASSOCIATES CONSTRUCTION AND DEVELOPMENT, INC. PH020192 BRGY VILLA QUIRINO, BAGABAG, NUEVA VIZCAYA Rejected 2025-08-15 14:00:42 Returned to Applicant KINDLY USE THE PRESCRIBED TEMP... See more
710 BEGAL DESIGN AND CONSTRUCTION UPGRADING OF 1.82 KM BELANCE- ... See more DUPAX DEL NORTE, NUEVA VIZCAYA Rejected 2025-08-16 11:22:12 Returned to Applicant NEEDS ADDITIONAL SAFETY OFFICE... See more
711 DOLE_RO2_2025-08-19_327_GJ3R 4 KIDS BUILDERS AND CONSTRUCTION SUPPLY CONCRETING OF FARM TO MARKET R... See more DUPAX DEL SUR, NUEVA VIZCAYA Approved 2025-08-16 11:28:10 Ready for Release Processed in 2 working days.
712 DOLE_RO2_2025-08-19_328_QTNT BEGAL DESIGN AND CONSTRUCTION UPGRADING OF 1.82 KM BELANCE- ... See more DUPAX DEL SUR, NUEVA VIZCAYA Approved 2025-08-16 11:32:24 Ready for Release Processed in 2 working days.
713 ATLANTIC CONSTRUCTION resealing of runway cracks and... See more tuguegarao city, cagayan Rejected 2025-08-18 08:16:12 Returned to Applicant REFER TO CSHP TEMPLATE: xii - ... See more
714 BALLIGI CONSTRUCTION AND DEVELOPMENT CORPORATION Construction of AFPSLAI Office... See more Maharlika Highway, Caggay, Tuguegarao, Cagayan Rejected 2025-08-18 09:02:30 Returned to Applicant INCOMPLETE ATTACHEMENT
715 DOLE_RO2_2025-08-19_329_805K SE-SE CONSTRUCTION SERVICES IMPROVEMENT OF INTEGRATED SCHO... See more MARABURAB ALCALA CAGAYAN Approved 2025-08-18 09:13:56 Ready for Release Processed in 2 working days.
716 DOLE_RO2_2025-08-19_330_RRF1 SE-SE CONSTRUCTION SERVICES CONSTRUCTION OF MULTIPURPOSE G... See more CENTRO SUR ALCALA CAGAYAN Approved 2025-08-18 09:21:13 Ready for Release Processed in 2 working days.
717 JHUERS CONSTRUCTION PB-CW-2025-026 CONSTRUCTION/CO... See more SAN PEDRO, MADDELA, QUIRINO Rejected 2025-08-18 09:40:24 Returned to Applicant Safety Officer with ongoing pr... See more
718 Power Check Enterprises PH020193_Tesorio's Lot Purok 3, Brgy. Palacian, Aglipay, Quirino Rejected 2025-08-18 11:13:29 Returned to Applicant 1. CSHP program not duly fille... See more
719 WERR CORPORATION INTERNATIONAL CONSTRUCTION OF WELCOME ARCH Maddarulug Norte, Enrile, Cagayan Rejected 2025-08-18 11:14:47 Returned to Applicant PLEASE REFER TO CSHP TEMPLATE:... See more
720 WERR CORPORATION INTERNATIONAL CONSTRUCTION OF WELCOME ARCH Maddarulug Norte, Enrile, Cagayan Rejected 2025-08-18 12:28:12 Returned to Applicant PLEASE REFER TO CSHP TEMPLATE:... See more
721 DOLE_RO2_2025-08-19_331_KFQ4 UNDERGROUND TECHNOLOGIES INC. Proposed Hand-holes and Direct... See more VILLAVERDE MUNICIPAL ENGINEERING OFFICE Approved 2025-08-18 13:26:45 Ready for Release Processed in 1 working days.
722 DOLE_RO2_2025-08-19_332_Q436 Power Check Enterprises PH020193_Tesorio's Lot Purok 3, Brgy. Palacian, Aglipay, Quirino Approved 2025-08-18 13:30:50 Ready for Release Processed in 1 working days.
723 TOP VISION DESIGN AND CONSTRUCTION SERVICES REPAIR OF 6 CLASSROOMS AT ATUL... See more ATULAYAN,TUGUEGARAO CITY Rejected 2025-08-18 13:47:10 Returned to Applicant Completed Project
724 FULRUBELL CORPORATION FTAP ROLOUT PROJECT Mallig, Isabela Rejected 2025-08-18 16:16:17 Returned to Applicant Completed project
725 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 1 AFUSI... See more AFUSING DAGA, ALCALA, CAG Rejected 2025-08-19 10:59:01 Returned to Applicant 1. Expired Testing Certificate... See more
726 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 1 PARED... See more PARED, ALCALA, CAGAYAN Rejected 2025-08-19 11:05:16 Returned to Applicant 1.The submitted certificate of... See more
727 DOLE_RO2_2025-08-19_333_VIXX SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF AFUSING DAGA... See more AFUSING DAGA, ALCALA, CAGAYAN Approved 2025-08-19 11:11:58 Ready for Release Processed in 1 working days.
728 DOLE_RO2_2025-08-19_334_83V5 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF TUPANG CENTR... See more TUPANG, ALCALA, CAGAYAN Approved 2025-08-19 11:19:13 Ready for Release Processed in 1 working days.
729 DOLE_RO2_2025-08-19_335_7O8F EVERMOUNT CONSTRUCTION CORPORATION 4PH PUEBLO DE CAUAYAN BY PASS ROAD SAN FERMIN, CAUAYAN CITY, ISABELA Approved 2025-08-19 12:20:12 Ready for Release Processed in 1 working days.
730 SHASHA'S CONSTRUCTION AND SUPPLIES CONTINUATION OF CONCRETING ZON... See more AT PIGGATAN, ALCALA, CAGAYAN Rejected 2025-08-19 13:32:55 Returned to Applicant No attached Certificate of Tes... See more
731 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF MINANGA TEJA... See more ABBEG, ALCALA, CAGAYAN Rejected 2025-08-19 13:52:38 Returned to Applicant No attached Certificate of Tes... See more
732 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF DAMMANG ALOG... See more AFUSING DAGA, ALCALA, CAGAYAN Rejected 2025-08-19 13:59:23 Returned to Applicant No attached Certificate of Tes... See more
733 DOLE_RO2_2025-08-26_336_OSAP A&J DESIGNS AND CONSTRUCTION REPAIR/REHABILITATION OF PLGU ... See more NUEVA VIZCAYA STATE UNIVERSITY- BAMBANG CAMPUS Approved 2025-08-19 15:17:47 Ready for Release Processed in 5 working days.
734 DOLE_RO2_2025-08-26_337_9RBZ GCPK CONSTRUCTION AND SUPPLY REAPAIR AND REHABILITATIUON OF... See more PARDO ELEMENTARY SCHOOL, TUGUEGARAO CITY Approved 2025-08-19 15:42:05 Ready for Release Processed in 5 working days.
735 DOLE_RO2_2025-08-26_338_GJCZ GCPK CONSTRUCTION AND SUPPLY REAPAIR AND REHABILITATIUON OF... See more PALLUA ELEMENTARY SCHOOL, TUGUEGARAO CITY Approved 2025-08-19 16:03:09 Ready for Release Processed in 5 working days.
736 DOLE_RO2_2025-08-26_339_R2OW RDJD CONSTRUCTION CONSTRUCTION AND INSTALLATION ... See more INABAN, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-08-19 16:17:08 Ready for Release Processed in 5 working days.
737 DOLE_RO2_2025-08-26_340_1J0E RDJD CONSTRUCTION ONSTRUCTION AND INSTALLATION O... See more OYAO, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-08-19 16:19:50 Ready for Release Processed in 5 working days.
738 4 KIDS BUILDERS AND CONSTRUCTION SUPPLY CONCRETING OF FARM TO MARKET R... See more DUPAX DEL SUR, NUEVA VIZCAYA Rejected 2025-08-19 16:29:44 Returned to Applicant DUPLICATE
739 M & F ENTERPRISE OPENING AND IMPROVEMENT OF DU... See more BAYOMBONG, NUEVA VIZCAYA Rejected 2025-08-19 16:34:58 Returned to Applicant a. The designated First Aider ... See more
740 DOLE_RO2_2025-08-26_341_LQJS Kyle MKZ Construction IMPROVEMENT OF FMR (BESSANG-NA... See more DIDIPIO, KASIBU, NUEVA, VIZCAYA Approved 2025-08-20 07:41:10 Ready for Release Processed in 5 working days.
741 SAN JACINTO CONSTRUCTION SERVICES AND GENERAL MERCHANDISING Renovation of Ground floor com... See more Municipal Government Center, Brgy. II, Enrile Cagayan Rejected 2025-08-20 09:36:38 Returned to Applicant PLEASE REFER TO CSHP TEMPLATE:... See more
742 DOLE_RO2_2025-08-29_361_TWYV LAB GENERAL ENGINEERING REPAIR/REHABILITION OF IMNAJBU... See more BATANES Approved 2025-08-20 09:36:53 Ready for Release Processed in 8 working days.
743 DOLE_RO2_2025-08-29_362_M2JC LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF RAELE... See more BATANES Approved 2025-08-20 09:42:16 Ready for Release Processed in 8 working days.
744 Terrainshaper Construction & Enterprise Construction of 45M 3-Legged S... See more BRGY.CABUNBATA, ISABELLA CITY, BASILAN Rejected 2025-08-20 10:25:04 Returned to Applicant Please reapply. Location of th... See more
745 DOLE_RO2_2025-08-26_342_29GH 7CHIN BUILDERS AND CONSTRUCTION SUPPLY PH020191-CME-45m, 24sqm, 320kp... See more SAGUDAY QUIRINO Approved 2025-08-20 10:28:46 Ready for Release Processed in 4 working days.
746 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 1 AFUSI... See more AFUSING DAGA, ALCALA, CAG Rejected 2025-08-20 13:52:52 Returned to Applicant The Testing Certificate of the... See more
747 A.P BOISER CONSTRUCTION AND SUPPLY Proposed CME-45m, 24sqm, 320kp... See more PH020194 BRGY. AGUIAGUICAN, GATTARAN, CAGAYAN Rejected 2025-08-20 14:07:58 Returned to Applicant PLEASE REFER TO CSHP TEMPLATE:... See more
748 A.P BOISER CONSTRUCTION AND SUPPLY Proposed CME-45m, 24sqm, 320kp... See more PH020220 ZONE 5, BRGY. PADDAYA, APPARI, CAGAYAN Rejected 2025-08-20 14:14:00 Returned to Applicant PLEASE REFER TO CSHP TEMPLATE:... See more
749 A.P BOISER CONSTRUCTION AND SUPPLY Proposed CME-45m, 24sqm, 320kp... See more PH020220 ZONE 5, BRGY. PADDAYA, APPARI, CAGAYAN Rejected 2025-08-20 14:14:29 Returned to Applicant PLEASE REFER TO CSHP TEMPLATE:... See more
750 JC PALOMO CONSTRUCTION & CONSTRUCTION SUPPLY CONSTRUCTION OF PROPOSED TWO S... See more GUCAB,ECHAGUE,ISABELA Rejected 2025-08-20 14:40:32 Returned to Applicant NO ATTACHED DOCUMENTARY REQUIR... See more
751 DOLE_RO2_2025-08-26_343_6MAI LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF DUMAW... See more ISABELA Approved 2025-08-20 15:21:17 Ready for Release Processed in 4 working days.
752 DOLE_RO2_2025-08-26_344_3MQD LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF STO D... See more ISABELA Approved 2025-08-20 15:26:31 Ready for Release Processed in 4 working days.
753 A.P BOISER CONSTRUCTION AND SUPPLY Proposed CME-45m, 24sqm, 320kp... See more PH020220 ZONE 5, BRGY. PADDAYA, APPARI, CAGAYAN Rejected 2025-08-20 15:52:32 Returned to Applicant PLEASE REFER TO CSHP TEMPLATE:... See more
754 DOLE_RO2_2025-08-26_345_E5FA LAB GENERAL ENGINEERING REPAIR/REHABILITATION OF LINOM... See more ISABELA Approved 2025-08-20 15:53:46 Ready for Release Processed in 4 working days.
755 R AN CONSTRUCTION AND CONSTRUCTION SUPPLY LGU-DIADI BAC 2025-10 CONCRETI... See more SITIO NAGTIM-OG BRGY. BUGNAY, DIADI, NUEVA VIZCAYA Rejected 2025-08-20 16:11:54 Returned to Applicant NO ATTACHMENTS
756 R AN CONSTRUCTION AND CONSTRUCTION SUPPLY LGU-DIADI BAC 2025-10 CONCRETI... See more SITIO NAGTIM-OG BRGY. BUGNAY, DIADI, NUEVA VIZCAYA Rejected 2025-08-20 16:57:16 Returned to Applicant *10 WORKERS - NEEDS 2 SAFETY O... See more
757 DOLE_RO2_2025-08-26_346_0EU4 SHASHA'S CONSTRUCTION AND SUPPLIES CONTINUATION OF CONCRETING ZON... See more PIGGATAN, ALCALA, CAGAYAN Approved 2025-08-21 08:12:13 Ready for Release Processed in 4 working days.
758 DOLE_RO2_2025-08-26_347_UCPX SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF MINANGA TEJA... See more ABBEG, ALCALA, CAGAYAN Approved 2025-08-21 08:19:57 Ready for Release Processed in 4 working days.
759 JIJOMER CONSTRUCTION Repair / Rehab. of Asaklat BHS Nagtipunan, Quirino Rejected 2025-08-21 08:22:24 Returned to Applicant Findings: 1. Application Fo... See more
760 IA CASTAÑEDA CONSTRUCTION AND SUPPLY IMPROVEMENT OF BARANGAY MULTI-... See more LA TORRE NORTH, BAYOMBONG, NUEVA VIZCAYA Rejected 2025-08-21 08:25:38 Returned to Applicant The designated First Aider and... See more
761 DOLE_RO2_2025-08-26_348_4MV5 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF DAMMANG ALOG... See more AFUSING DAGA, ALCALA, CAGAYAN Approved 2025-08-21 08:25:59 Ready for Release Processed in 4 working days.
762 CTC Group Inc former Alphateq Inc Globe Roll-out Project PH020189-Brgy. Pinaripad Sur, Aglipay, Quirino Rejected 2025-08-21 09:02:39 Returned to Applicant a. The submitted CSHP form is ... See more
763 JIJOMER CONSTRUCTION Repair / Rehab. of San Dionisi... See more Nagtipunan, Quirino Rejected 2025-08-21 09:05:55 Returned to Applicant Findings: Repair / Rehab. of S... See more
764 DOLE_RO2_2025-08-29_363_GP8G KNB CONSTRUCTION REPAIR/REHABILITATION OF ITBUD... See more UYUGAN BATANES Approved 2025-08-21 10:23:01 Ready for Release Processed in 7 working days.
765 KNB CONSTRUCTION REPAIR/REHABILITATION OF MAHAT... See more MAHATAO BATANES Rejected 2025-08-21 10:37:30 Returned to Applicant SO2 and FA are the same with o... See more
766 KNB CONSTRUCTION REPAIR/REHABILITATION OF PANAT... See more MAHATAO BATANES Rejected 2025-08-21 10:43:08 Returned to Applicant SO2 and FA are the same with t... See more
767 DOLE_RO2_2025-08-26_349_S0X4 Dandex contruction Concreting of farm to market r... See more Utan, allacapan, cagayan Approved 2025-08-21 15:26:46 Ready for Release Processed in 3 working days.
768 Dandex contruction Concreting of farm to market r... See more Capanickian norte, allacapan, cagayan Rejected 2025-08-21 16:10:41 Returned to Applicant The designated First Aider has... See more
769 DOLE_RO2_2025-08-26_350_205E A&J DESIGNS AND CONSTRUCTION REHABILITATION OF NHA IP DORMI... See more NUEVA VIZCAYA STATE UNIVERSITY- BAMBANG CAMPUS Approved 2025-08-22 08:17:21 Ready for Release Processed in 3 working days.
770 JPLC TRADING 2025-24-HO-COB-01; SUPPLY, DEL... See more NIA HEAD OFFICE, CAUAYAN, ISABELA Rejected 2025-08-22 08:40:04 Returned to Applicant CSHP TEMPLATE NOT DULY FILLED ... See more
771 JS AND ASSOCIATES CONSTRUCTION AND DEVELOPMENT, INC. PH020192 BRGY VILLA QUIRINO, BAGABAG, NUEVA VIZCAYA Rejected 2025-08-22 10:51:43 Returned to Applicant UNSIGNED PCAB
772 Buskowitz Solar Inc. INSTALLATION OF 99 kWp SOLAR P... See more DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA Rejected 2025-08-22 11:55:03 Returned to Applicant 1. No application form 2. PCA... See more
773 Buskowitz Solar Inc. INSTALLATION OF 99 kWp SOLAR P... See more DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA Rejected 2025-08-22 12:21:14 Returned to Applicant 1. PCAB is unsigned 2. No Red... See more
774 Buskowitz Solar Inc. INSTALLATION OF 99 kWp SOLAR P... See more DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA Rejected 2025-08-22 12:25:19 Returned to Applicant 1. Unsigned PCAB 2. No First ... See more
775 Buskowitz Solar Inc. INSTALLATION OF 99 kWp SOLAR P... See more DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA Rejected 2025-08-22 12:30:09 Returned to Applicant 1. Unsigned PCAB 2. No First ... See more
776 DOLE_RO2_2025-08-26_351_6Z7Z A.P BOISER CONSTRUCTION AND SUPPLY Proposed CME-45m, 24sqm, 320kp... See more PH020194 BRGY. AGUIAGUICAN, GATTARAN, CAGAYAN Approved 2025-08-22 13:01:43 Ready for Release Processed in 2 working days.
777 DOLE_RO2_2025-08-26_352_TXOB A.P BOISER CONSTRUCTION AND SUPPLY Proposed CME-45m, 24sqm, 320kp... See more PH020220 ZONE 5, BRGY. PADDAYA, APPARI, CAGAYAN Approved 2025-08-22 13:05:14 Ready for Release Processed in 2 working days.
778 DOLE_RO2_2025-08-26_353_3B7M BELANCE BUILDERS & TRADING CONSTRUCTION OF TWO STOREY SC... See more BARANGAY PAQUET, KASIBU, NUEVA VIZCAYA Approved 2025-08-22 15:12:27 Ready for Release Processed in 2 working days.
779 DOLE_RO2_2025-08-27_354_W1SP ATLANTIC CONSTRUCTION resealing of runway cracks and... See more tuguegarao city, cagayan Approved 2025-08-22 15:27:52 Ready for Release Processed in 3 working days.
780 WERR CORPORATION INTERNATIONAL CONSTRUCTION OF WELCOME ARCH Maddarulug Norte, Enrile, Cagayan Rejected 2025-08-22 17:06:32 Returned to Applicant PLEASE REFER TO CSHP TEMPLATE:... See more
781 DOLE_RO2_2025-08-27_355_VJS7 DANDEX CONSTRUCTION Allacapan, cagayanconcreting o... See more Capanickian Norte, Allacapan, Cagayan Approved 2025-08-22 17:15:26 Ready for Release Processed in 3 working days.
782 DOLE_RO2_2025-08-27_356_LXXA MIZRACH'S CONSTRUCTION SERVICES CONCRETING/REHABILITATION OF F... See more Gen. Aguinaldo, Ramon, Isabela Approved 2025-08-26 08:11:04 Ready for Release Processed in 2 working days.
783 JMD-68 Builders Construction of Multi-Purpose ... See more Salvacion, Saguday, Quirino Rejected 2025-08-26 09:30:26 Returned to Applicant Findings: 1. Please Follow t... See more
784 GOLDEN TECH CONSTRUCTION CORPORATION NCB-INFRA-ISA123-25-RPCIS-DINA... See more DINAPIGUE,ISABELA Rejected 2025-08-26 09:49:10 Returned to Applicant CSHP TEMPLATE NOT DULY FILLED ... See more
785 DOLE_RO2_2025-08-27_357_9O35 JHUERS CONSTRUCTION PB-CW-2025-026 CONSTRUCTION / ... See more SAN PEDRO, MADDELA, QUIRINO Approved 2025-08-26 10:14:05 Ready for Release Processed in 2 working days.
786 DOLE_RO2_2025-08-27_358_DI7M MACST CONSTRUCTION AND SUPPLY CONS. OF WELCOME ARCH AT BUA, ... See more BUA,TADJI, DIDIPIO, KASIBU, NUEVA VIZCAYA Approved 2025-08-26 10:24:20 Ready for Release Processed in 2 working days.
787 DOLE_RO2_2025-08-27_359_DJJG RDJD CONSTRUCTION CONCRETING OF TOMINEZ-MAGPALE ... See more MALASIN, DUPAX DEL NORTE, NUEVA VIZCAYA Approved 2025-08-26 12:31:17 Ready for Release Processed in 1 working days.
788 BMJ BUILDERS PROVISION OF LABOR AND MATERIA... See more NO. 18 DALAN NA PAGAYAYA CORNER MATUNUNG, REGIONAL GOVERNMENT CENTER, CARIG SUR, TUGUEGARAO CITY, CAGAYAN Rejected 2025-08-26 18:01:44 Returned to Applicant a. The submitted Construction ... See more
789 7CHIN BUILDERS AND CONSTRUCTION SUPPLY CME-45m, 24sqm, 320kph, 150D k... See more GATTARAN CAGAYAN Rejected 2025-08-27 07:41:15 Returned to Applicant NC2 FOR ELECTRICIAN HAS ALREAD... See more
790 JPLC TRADING 2025-24-HO-COB-01; SUPPLY, DEL... See more NIA HEAD OFFICE, CAUAYAN, ISABELA Rejected 2025-08-27 09:01:20 Returned to Applicant Finished project
791 DOLE_RO2_2025-08-29_364_3VRM WERR CORPORATION INTERNATIONAL CONSTRUCTION OF WELCOME ARCH Maddarulug Norte, Enrile, Cagayan Approved 2025-08-27 10:02:15 Ready for Release Processed in 3 working days.
792 TECKON CONSTRUCTION REHABILITATION OF LBS BUILDING... See more SOLANA, CAGAYAN Rejected 2025-08-27 10:11:35 Returned to Applicant LETTER OF INTENT: PLEASE ADDRE... See more
793 RDJD CONSTRUCTION CONCRETING OF TOMINEZ-MAGPALE ... See more MALASIN, DUPAX DEL NORTE, NUEVA VIZCAYA Rejected 2025-08-27 10:45:14 Returned to Applicant safety officer and first aider... See more
794 DOLE_RO2_2025-08-29_365_AZZ2 IA CASTAÑEDA CONSTRUCTION AND SUPPLY IMPROVEMENT OF BARANGAY MULTI-... See more LA TORRE NORTH, BAYOMBONG, NUEVA VIZCAYA Approved 2025-08-27 11:51:18 Ready for Release Processed in 3 working days.
795 JIRAGA BUILDERS PROPOSED IMPROVEMENT OF MULTI-... See more Municipal Center, Barangay 2, Enrile, Cagayan Rejected 2025-08-27 12:30:42 Returned to Applicant NOT PROPERLY FILLED OUT CSHP T... See more
796 DOLE_RO2_2025-09-03_367_VN8C UPLAND CONSTRUCTION CONSTRUCTION OF CANAL LINING W... See more BARANGAY DON DOMINGO MADDELA, BAYOMBONG, NUEVA VIZCAYA Approved 2025-08-27 16:22:03 Ready for Release Processed in 5 working days.
797 CTC Group Inc former Alphateq Inc Globe Roll-out Project PH020189-Brgy. Pinaripad Sur, Aglipay, Quirino Rejected 2025-08-28 07:06:54 Returned to Applicant a. The submitted Construction ... See more
798 JC PALOMO CONSTRUCTION AND CONSTRUCTION SUPPLY Construction of Proposed Two-S... See more Gucab, Echague, Isabela Rejected 2025-08-28 08:31:09 Returned to Applicant tagged as a finished project.
799 DOLE_RO2_2025-08-29_366_ORPJ GOLDEN TECH CONSTRUCTION CORPORATION NCB-INFRA-ISA123-25-RPCIS-DINA... See more DINAPIGUE,ISABELA Approved 2025-08-28 09:37:11 Ready for Release Processed in 2 working days.
800 DOLE_RO2_2025-08-29_360_AJBF JPLC TRADING 2025-24-HO-COB-01; SUPPLY, DEL... See more NIA HEAD OFFICE, CAUAYAN, ISABELA Approved 2025-08-28 09:39:22 Ready for Release Processed in 1 working days.
801 AMBAGUIO BUILDERS INSTALLATION OF PROVINCIAL NUR... See more MAGSAYSAY, BAYOMBONG, NUEVA VIZCAYA Rejected 2025-08-28 11:50:47 Returned to Applicant DUPLICATE
802 DOLE_RO2_2025-09-03_368_JCKL AMBAGUIO BUILDERS INSTALLATION OF PROVINCIAL NUR... See more MAGSAYSAY, BAYOMBONG, NUEVA VIZCAYA Approved 2025-08-28 11:51:17 Ready for Release Processed in 4 working days.
803 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 1 PARED... See more PARED, ALCALA, CAGAYAN Rejected 2025-08-28 12:07:03 Returned to Applicant DOUBLE ENTRY
804 BMJ BUILDERS PROVISION OF LABOR AND MATERIA... See more REGIONAL GOVERNMENT CENTER CARIG SUR, TUGUEGARAO CITY, CAGAYAN Rejected 2025-08-28 13:55:18 Returned to Applicant 1. NO LETTER OF INTENT ATTACHE... See more
805 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF FARM TO MARKET R... See more CUNIG, GATTARAN, CAGAYAN Rejected 2025-08-28 14:05:24 Returned to Applicant No NCII cert of Transit Mixer ... See more
806 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 1 AFUSI... See more AT AFUSING DAGA, ALCALA, CAGAYAN Rejected 2025-08-28 14:56:36 Returned to Applicant DOUBLE ENTRY
807 MIZRACH'S CONSTRUCTION SERVICES CONSTRUCTION OF STONE MASONRY ... See more Disimungal, Nagtipunan, Quirino Rejected 2025-08-28 16:37:46 Returned to Applicant completed project
808 DOLE_RO2_2025-09-03_369_844N 7CHIN BUILDERS AND CONSTRUCTION SUPPLY CME-45m, 24sqm, 320kph, 150D k... See more GATTARAN CAGAYAN Approved 2025-08-29 10:41:24 Ready for Release Processed in 3 working days.
809 DOLE_RO2_2025-09-03_370_XG8W CREST92 Construction & Development Corporation Construction of Tuguegarao Cit... See more Atulayan Sur, Tuguegarao City, Cagayan Approved 2025-08-29 12:35:58 Ready for Release Processed in 3 working days.
810 TECKON CONSTRUCTION REHABILITATION OF SLAUGHTER HO... See more SOLANA, CAGAYAN Rejected 2025-08-29 12:51:02 Returned to Applicant REFER TO CSHP TEMPLATE UNDER 7... See more
811 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF FARM TO MARKET R... See more CUNIG, GATTARAN, CAGAYAN Rejected 2025-08-31 12:12:54 Returned to Applicant DOUBLE ENTRY
812 SHASHA'S CONSTRUCTION AND SUPPLIES COMPLETION OF THREE CLASSROOM ... See more ALBERTO ANOTIO PRIMARY SCHOOL GATTARAN, CAGAYAN Rejected 2025-08-31 12:22:48 Returned to Applicant PROVIDE NC2 FOR SCAFFOLDING AN... See more
813 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF ROAD AT TAGUMAY,... See more TAGUMAY, GATTARAN, CAGAYAN Rejected 2025-08-31 12:23:32 Returned to Applicant NO NCII certificate of Transit... See more
814 DOLE_RO2_2025-09-03_371_ZHYN MACST CONSTRUCTION AND SUPPLY REPAIR/REHAB OF OSCA BUILDING POBLACION, KASIBU,NUEVA VIZCAYA Approved 2025-09-01 10:18:13 Ready for Release Processed in 2 working days.
815 DOLE_RO2_2025-09-03_372_JCV7 MACST CONSTRUCTION AND SUPPLY COMPLETION OF STAGE AT BARANGA... See more ALLOY,KASIBU,NUEVA VIZCAYA Approved 2025-09-01 10:23:15 Ready for Release Processed in 2 working days.
816 DOLE_RO2_2025-09-03_373_OI7F MACST CONSTRUCTION AND SUPPLY CONSTRUCTION OF MULTIPURPOSE P... See more LUPA, KASIBU,NUEVA VIZCAYA Approved 2025-09-01 10:26:25 Ready for Release Processed in 2 working days.
817 MEGA EAST POWER CONSTRUCTION CORPORATION NATIONAL GRID CORPORATION OF T... See more BUSILAC PUROK 4 BAYOMBONG NUEVA VISCAYA Rejected 2025-09-01 10:31:03 Returned to Applicant Kindly include all pages of th... See more
818 DOLE_RO2_2025-09-03_374_N2OX Buskowitz Solar Inc. INSTALLATION OF 99 kWp SOLAR P... See more DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA Approved 2025-09-01 13:41:29 Ready for Release Processed in 2 working days.
819 DOLE_RO2_2025-09-03_375_MUXG Buskowitz Solar Inc. INSTALLATION OF 99KWP SOLAR PV... See more DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA Approved 2025-09-01 13:49:31 Ready for Release Processed in 2 working days.
820 DOLE_RO2_2025-09-03_376_M2ID Buskowitz Solar Inc. INSTALLATION OF 99KWP SOLAR PV... See more DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA Approved 2025-09-01 13:52:28 Ready for Release Processed in 2 working days.
821 DOLE_RO2_2025-09-03_377_AQZR JIJOMER CONSTRUCTION Repair / Rehab. of Asaklat BHS Nagtipunan, Quirino Approved 2025-09-01 14:56:08 Ready for Release Processed in 2 working days.
822 SAN JACINTO CONSTRUCTION SERVICES AND GENERAL MERCHANDISING Renovation of Ground floor com... See more Municipal Government Center, Brgy. II, Enrile Cagayan Rejected 2025-09-01 14:56:36 Returned to Applicant No signature of owner in the a... See more
823 DOLE_RO2_2025-09-03_378_0CW6 JIJOMER CONSTRUCTION Repair / Rehab. of San Dionisi... See more Nagtipunan, Quirino Approved 2025-09-01 15:28:24 Ready for Release Processed in 2 working days.
824 IDESCON INC. SUPREME COURT/ HALL OF JUSTICE... See more BAMBANG MUNICIPAL HALL, BRGY. BUAG, BAMBANG, NUEVA VIZCAYA Rejected 2025-09-02 10:38:03 Returned to Applicant Require additional SO. Totalit... See more
825 DOLE_RO2_2025-09-03_379_IMHK SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 1 PARED... See more ZONE 1 PARED FMR AT ALCALA, CAGAYAN Approved 2025-09-02 10:58:44 Ready for Release Processed in 1 working days.
826 JIRAGA BUILDERS PROPOSED IMPROVEMENT OF MULTI-... See more Municipal Center, Barangay 2, Enrile, Cagayan Rejected 2025-09-02 13:49:52 Returned to Applicant INCOMPLETE ATTACHEMENT
827 DOLE_RO2_2025-09-03_380_EF3T ACES 3 CONSTRUCTION PB-CW-2025-066-IMPROVEMENT/CON... See more DON FAUSTINO PAGADUAN,DIFFUN QUIRINO Approved 2025-09-02 15:31:16 Ready for Release Processed in 1 working days.
828 DOLE_RO2_2025-09-03_381_ZWDD ACES 3 CONSTRUCTION PB-CW-2025-065-IMPROVEMENT/CON... See more CAMPAMENTO,DIFFUNQUIRINO Approved 2025-09-02 15:40:01 Ready for Release Processed in 1 working days.
829 DOLE_RO2_2025-09-08_383_C1EO M & F ENTERPRISE OPENING AND IMPROVEMENT OF DU... See more BAYOMBONG, NUEVA VIZCAYA Approved 2025-09-02 17:07:43 Ready for Release Processed in 4 working days.
830 DOLE_RO2_2025-09-08_384_3KVB BELANCE BUILDERS & TRADING IMPROVEMENT OF FMR UPPER DINE... See more BRGY. DINE, KASIBU, NUEVA VIZCAYA Approved 2025-09-02 17:12:05 Ready for Release Processed in 4 working days.
831 DOLE_RO2_2025-09-08_385_KMO1 BENSON BUILDERS IMPROVEMENT OF FARM TO MARKET ... See more BRGY. CORDON, KASIBU, NUEVA VIZCAYA Approved 2025-09-02 17:16:55 Ready for Release Processed in 4 working days.
832 DOLE_RO2_2025-09-08_386_EYKV BENSON BUILDERS IMPROVEMENT OF FARM TO MARKET ... See more BRGY. CORDON, KASIBU, NUEVA VIZCAYA Approved 2025-09-02 17:21:07 Ready for Release Processed in 4 working days.
833 DOLE_RO2_2025-09-08_387_FA45 BENSON BUILDERS CONSTRUCTION OF TWO STOREY SCH... See more BRGY. BINOGAWAN, KASIBU, NUEVA VIZCAYA Approved 2025-09-02 17:25:31 Ready for Release Processed in 4 working days.
834 DOLE_RO2_2025-09-03_382_GXTI IDESCON INC. PROPOSED REPAIR AND REHABILITA... See more BAMBANG MUNICIPAL HALL, BRGY. BUAG, BAMBANG, NUEVA VIZCAYA Approved 2025-09-03 08:26:22 Ready for Release Processed in 1 working days.
835 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF ZONE 1 PARED... See more ZONE 1 PARED FMR AT ALCALA, CAGAYAN Rejected 2025-09-03 09:33:16 Returned to Applicant Designated First Aider for thi... See more
836 JIRAGA BUILDERS PROPOSED IMPROVEMENT OF MULTI-... See more Municipal Center, Barangay 2, Enrile, Cagayan Rejected 2025-09-03 13:20:37 Returned to Applicant EXPIRED CERTIFICATE/I.D. OF FI... See more
837 JAN PAOLA CONSTRUCTION INC. construction of luna hemodialy... See more Centro 2, Luna, Isabela Rejected 2025-09-03 17:27:09 Returned to Applicant CSHP APPLICATION NOT DULLY FIL... See more
838 DOLE_RO2_2025-09-08_388_RXLQ BELANCE BUILDERS & TRADING IMPROVEMENT OF FARM TO MARKET ... See more BRGY. CATAWARAN, KASIBU, NUEVA VIZCAYA Approved 2025-09-03 17:36:55 Ready for Release Processed in 3 working days.
839 DOLE_RO2_2025-09-08_389_S8AD OUA CONSTRUCTION CONTINUATION OF REHABILITATION... See more BARANGAY. SAN ISIDRO, LUNA, ISABELA Approved 2025-09-04 09:38:00 Ready for Release Processed in 3 working days.
840 DOLE_RO2_2025-09-08_390_N7UD OUA CONSTRUCTION CONSTRUCTION OF 2 BASKETBALL C... See more BARANGAY LUYAO, LUNA, ISABELA Approved 2025-09-04 09:42:02 Ready for Release Processed in 3 working days.
841 SHASHA'S CONSTRUCTION AND SUPPLIES COMPLETION OF THREE CLASSROOM ... See more ALBERTO ANOTIO PRIMARY SCHOOL GATTARAN, CAGAYAN Rejected 2025-09-04 12:15:06 Returned to Applicant Designated First Aider-Randolp... See more
842 KOMICHOV GENERAL CONSTRUCTION IMPROVEMENT OF VARIOUS FARM TO... See more VILLAVERDE, NUEVA VIZCAYA Rejected 2025-09-04 13:01:28 Returned to Applicant Please include ID on FIRST AID... See more
843 Dragon twelve builders and construction supply ITB 8 lot 10 completion of bar... See more Brgy San Mateo tumauini isabela Rejected 2025-09-04 14:13:05 Returned to Applicant 1. PCAB attached is Expired 2.... See more
844 Dragon twelve builders and construction supply ITB 8 Lot 2 repair of 10 cl cd... See more Catabayungan cabagan isabela Rejected 2025-09-04 14:22:47 Returned to Applicant 1. Expired PCAB 2. Safety offi... See more
845 Dragon twelve builders and construction supply ITB 8 LOT 1 repair of five (5)... See more San Antonio Santa Maria isabela Rejected 2025-09-04 14:25:30 Returned to Applicant 1. Expired PCAB 2. Safety offi... See more
846 Dragon twelve builders and construction supply ITB 8 LOT 3 CONSTRUCTION OF 1 ... See more SITIO CADDANGAN LIMBAUAN SAN PABLO ISABELA Rejected 2025-09-04 14:47:26 Returned to Applicant Upon evaluation of the submitt... See more
847 Dragon twelve builders and construction supply ITB 8 LOT 4 CONSTRUCTION OF 1 ... See more San Isidro East sta Maria isabela Rejected 2025-09-04 14:50:55 Returned to Applicant Upon evaluation of the submitt... See more
848 Dragon twelve builders and construction supply ITB 8 LOT 5 CONSTRUCTION OF 1 ... See more DALENA San Pablo isabela Rejected 2025-09-04 14:59:18 Returned to Applicant Upon evaluation of the submitt... See more
849 Dragon twelve builders and construction supply IBT 8 LOT 6 CONSTRUCTION OF MU... See more RAGAN SUR NATIONAL HIGH SCHOOL DELFIN ALBANO ISABELA Rejected 2025-09-04 15:03:32 Returned to Applicant Upon evaluation of the submitt... See more
850 JAN PAOLA CONSTRUCTION INC. IMPROVEMENT OF MULTI-PURPOSE B... See more Centro 2, Luna, Isabela Rejected 2025-09-04 15:32:34 Returned to Applicant a. The attached testing certif... See more
851 Dragon twelve builders and construction supply ITB 8 LOT 6 CONSTRUCTION OF MU... See more RAGAN SUR DELFIN ALBANO ISABELA Rejected 2025-09-04 16:11:26 Returned to Applicant Upon evaluation of the submitt... See more
852 W.S FAGCANGAN CONSTRUCTION MANAGEMENT SERVICES REPAIR OF AIR SIDE SECURITY/ P... See more TUGUEGARAO CITY Rejected 2025-09-05 08:11:03 Returned to Applicant a. The applicant listed in the... See more
853 5 MJ'S CONSTRUCTION COMPLETION OF 2CL BUILDING( TA... See more TAMBAN, ALCALA, CAGAYAN Rejected 2025-09-05 09:20:41 Returned to Applicant a. The submitted Construction ... See more
854 DOLE_RO2_2025-09-10_396_86DD SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF ROAD AT TAGUMAY,... See more TAGUMAY, GATTARAN, CAGAYAN Approved 2025-09-05 10:50:13 Ready for Release Processed in 3 working days.
855 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF ROAD AT TAGUMAY,... See more TAGUMAY, GATTARAN, CAGAYAN Rejected 2025-09-05 10:50:22 Returned to Applicant DOUBLE ENTRY
856 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF ROAD AT TAGUMAY,... See more TAGUMAY, GATTARAN, CAGAYAN Rejected 2025-09-05 10:50:31 Returned to Applicant DOUBLE ENTRY
857 SAN JACINTO CONSTRUCTION SERVICES AND GENERAL MERCHANDISING Renovation of Ground floor com... See more Municipal Government Center, Brgy. II, Enrile Cagayan Rejected 2025-09-05 11:09:57 Returned to Applicant REFER TO CSHP TEMPLATE: NOT ST... See more
858 DOLE_RO2_2025-09-10_397_KP42 MACST CONSTRUCTION AND SUPPLY IMPROVEMENT OF FARM TO MARKET ... See more BINOGAWAN,KASIBU,NUEVA VIZCAYA Approved 2025-09-05 12:11:44 Ready for Release Processed in 3 working days.
859 RCS Solar and Electrical Installation Services 10kw Hybrid Solar Power System Ipil St. Rosario, Santiago City Rejected 2025-09-05 13:43:06 Returned to Applicant Cshp application and template ... See more
860 DOLE_RO2_2025-09-10_398_6IKQ MACST CONSTRUCTION AND SUPPLY IMPROVEMENT OF FARM TO MARKET ... See more CAMAMASI,KASIBU,NUEVA VIZCAYA Approved 2025-09-05 16:01:59 Ready for Release Processed in 3 working days.
861 DOLE_RO2_2025-09-08_391_QRBU JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-78-25 CONSTRUC... See more CLAVERIA, CAGAYAN Approved 2025-09-08 09:27:58 Ready for Release Processed in 1 working days.
862 DOLE_RO2_2025-09-08_392_J02W JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-80-25 CONSTRUC... See more CLAVERIA, CAGAYAN Approved 2025-09-08 09:30:59 Ready for Release Processed in 1 working days.
863 DOLE_RO2_2025-09-08_393_KVUB JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-83-25 CONSTRUC... See more CLAVERIA, CAGAYAN Approved 2025-09-08 09:33:40 Ready for Release Processed in 1 working days.
864 DOLE_RO2_2025-09-08_394_7EBB JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-84-25 CONSTRUC... See more CLAVERIA, CAGAYAN Approved 2025-09-08 09:36:36 Ready for Release Processed in 1 working days.
865 DOLE_RO2_2025-09-08_395_AEHN JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-108-24 IMPROVE... See more APARRI, CAGAYAN Approved 2025-09-08 09:39:10 Ready for Release Processed in 1 working days.
866 RBGONZALES OPC 791.10 kWp/700 kW AC ROOF-TOP ... See more SM CITY CAUAYAN, MAHARLIKA HW. BRGY DISTRICT 2, CAUAYAN CITY Rejected 2025-09-08 11:11:18 Returned to Applicant DOUBLE ENTRY
867 RBGONZALES OPC 791.10 kWp/700 kW AC ROOF-TOP ... See more SM CITY CAUAYAN, MAHARLIKA HW. BRGY DISTRICT 2, CAUAYAN CITY Rejected 2025-09-08 11:27:36 Returned to Applicant DOUBLE ENTRY
868 RBGONZALES OPC 791.10 kWp/700 kW AC ROOF-TOP ... See more SM CITY CAUAYAN, MAHARLIKA HW. BRGY DISTRICT 2, CAUAYAN CITY Rejected 2025-09-08 11:30:53 Returned to Applicant CSHP TEMPLATE NOT DULY FILLED ... See more
869 NETSOLAR INC. Insular Life 2/F Insular Life Building, Maharlika Highway, Villasis, Santiago City, Isabela, Philippines Rejected 2025-09-08 13:13:30 Returned to Applicant CSHP TEMPLATE NOT DULY FILLED ... See more
870 NETSOLAR INC. Insular Life 2/F Insular Life Building, Maharlika Highway, Villasis, Santiago City, Isabela, Philippines Rejected 2025-09-08 13:17:07 Returned to Applicant DOUBLE ENTRY
871 Lancesoft Infra Solution Inc E02919-B05 / NS-NTG22-G20 BRGY BARESBES QUEZON NUEVA VIZCAYA Rejected 2025-09-08 16:56:19 Returned to Applicant 1. The CSHP Application and Pr... See more
872 DEKM CONSTRUCTION REPAIR OF AIR SIDE SECURITY/ P... See more TUGUEGARAO CITY Rejected 2025-09-09 08:09:04 Returned to Applicant 1. No Philippine Contractors A... See more
873 GIGAWORKZ TECHNOLOGIES INC. DESIGN, SUPPLY, INSTALLATION, ... See more SMFI Echague Isabela Rejected 2025-09-09 08:54:06 Returned to Applicant state the number of calendar d... See more
874 MILESTONE 888 CONSTRUCTION INC. Construction of Bridge going t... See more San Miguel, Baggao, Cagayan Rejected 2025-09-09 09:39:40 Returned to Applicant 1. FILLED OUT PROPERLY THE CSH... See more
875 DOLE_RO2_2025-09-15_400_C6H6 KNB CONSTRUCTION REPAIR/REHABILITATION OF PANAT... See more MAHATAO, BATANES Approved 2025-09-09 10:38:36 Ready for Release Processed in 4 working days.
876 KNB CONSTRUCTION REPAIR/REHABILITATION OF MAHAT... See more MAHATAO, BATANES Rejected 2025-09-09 10:43:50 Returned to Applicant Same First Aider and Safety of... See more
877 DOLE_RO2_2025-09-10_399_2Q0N CTC Group Inc former Alphateq Inc Globe Roll-out Project PH020189-Brgy. Pinaripad Sur, Aglipay, Quirino Approved 2025-09-09 14:51:52 Ready for Release Processed in 1 working days.
878 DOLE_RO2_2025-09-15_401_F3JU SAN JACINTO CONSTRUCTION SERVICES AND GENERAL MERCHANDISING Renovation of Ground floor com... See more Municipal Government Center, Brgy. II, Enrile Cagayan Approved 2025-09-09 16:23:26 Ready for Release Processed in 4 working days.
879 MACST CONSTRUCTION AND SUPPLY CONSTRUCTION OF 2 CLASSROOM W/... See more DIDIPIO,KASIBU,NUEVA VIZCAYA Rejected 2025-09-09 17:12:04 Returned to Applicant NO ATTACHMENTS
880 SOUTHLAND CONSTRUCTION AND SUPPLIES CONSTRUCTION OF BOX CULVERT (N... See more KASIBU, NUEVA VIZCAYA Rejected 2025-09-10 09:21:43 Returned to Applicant COMPLETED PROJECT
881 DOLE_RO2_2025-09-15_402_IEAX JKAVER CONSTRUCTION AND ENGINEERING SERVICES FTAP-GLOBE ROLLOUT PROJECT: PH... See more BRGY. BONE SOUTH, ARITAO, NUEVA VIZCAYA Approved 2025-09-10 09:54:38 Ready for Release Processed in 3 working days.
882 KNB CONSTRUCTION REPAIR/REHABILITATION OF MAHAT... See more MAHATAO, BATANES Rejected 2025-09-10 10:58:56 Returned to Applicant No Certificate of First Aider.
883 JAN PAOLA CONSTRUCTION INC. construction of luna hemodialy... See more LALOG 1, Luna, Isabela Rejected 2025-09-10 12:52:33 Returned to Applicant The Designated Safety Officer ... See more
884 yumadag builders JOLLIBEE - BONIFACIO GONZAGA TUGUEGARAO CITY Rejected 2025-09-10 13:27:38 Returned to Applicant USE COMPREHENSIVE FORMS AND TE... See more
885 DOLE_RO2_2025-09-15_403_D7QL DIAMOND J BUILDERS ESTABLISHMENT OF UNIVERSITY RA... See more NUEVA VIZCAYA STATE UNIVERSITY, BAYOMBONG, NUEVA VIZCAYA Approved 2025-09-10 15:07:36 Ready for Release Processed in 3 working days.
886 DOLE_RO2_2025-09-15_404_PNUM DEKM CONSTRUCTION REPAIR OF AIR SIDE SECURITY/ P... See more TUGUEGARAO CITY Approved 2025-09-10 17:26:50 Ready for Release Processed in 3 working days.
887 NORTH WIDE JAAR CONST CORP REPAIR OF SCHOOL FACILITIES IN... See more TUGUEGARAO CITY Rejected 2025-09-11 09:48:04 Returned to Applicant NO SIGNATURE OF PROJECT OWNER,... See more
888 DOLE_RO2_2025-09-15_405_4IUD DANDEX CONSTRUCTION concreting of access road to s... See more Burot, Allacapan, Cagayan Approved 2025-09-11 12:21:30 Ready for Release Processed in 2 working days.
889 DOLE_RO2_2025-09-15_407_NYQ0 DEKM CONSTRUCTION finishing of the municipal gym... See more centro east, allacapan, cagayan Approved 2025-09-11 12:29:06 Ready for Release Processed in 3 working days.
890 CJTPASCUAL CONSTRUCTION Concreting of Access Road Lead... See more Brgy. Minanga Norte, Lasam, Cagayan Rejected 2025-09-11 13:36:28 Returned to Applicant Upon evaluation of the submitt... See more
891 DECA CONSTRUCTION Rehabilitation of Farm to Mark... See more Nicolas Agatep, Lasam, Cagayan Rejected 2025-09-11 14:04:38 Returned to Applicant DOUBLE ENTRY
892 NEW AMSON CONSTRUCTION PROCUREMENT FOR THE CONSTRUCTI... See more ECHAGUE, ISABELA Rejected 2025-09-11 15:28:38 Returned to Applicant CSHP TEMPLATE NOT DULY FILLED ... See more
893 JAN PAOLA CONSTRUCTION INC. IMPROVEMENT OF MULTI-PURPOSE B... See more Centro 2, Luna, Isabela Rejected 2025-09-11 17:23:50 Returned to Applicant Replace the name of first aide... See more
894 BMJ BUILDERS Provision of Labor and Materia... See more Regional Government Center, Carig Sur, Tuguegarao City, Cagayan Rejected 2025-09-11 17:37:12 Returned to Applicant NO ATTACEHD LETTER OF INTENT, ... See more
895 POWER 4 ALL INC. Green Lighting of Provincial C... See more Capitol Compound, Bayombong Nueva Vizcaya Rejected 2025-09-11 20:37:52 Returned to Applicant 1. Please use the DOLE prescri... See more
896 KNB CONSTRUCTION REPAIR/REHABILITATION OF MAHAT... See more MAHATAO, BATANES Rejected 2025-09-12 11:02:29 Returned to Applicant Expired PCAB License
897 DOLE_RO2_2025-09-15_406_8DON J.A.N CONSTRUCTION MEO-DF-2025-025 CONCRETING OF N.I.A ROAD, BRGY. STA. ROSA, BAYOMBONG, NUEVA VIZCAYA Approved 2025-09-12 11:04:09 Ready for Release Processed in 1 working days.
898 DOLE_RO2_2025-09-17_410_71Z8 NEW AMSON CONSTRUCTION PROCUREMENT FOR THE CONSTRUCTI... See more ECHAGUE, ISABELA Approved 2025-09-12 11:18:08 Ready for Release Processed in 4 working days.
899 RTC CONSTRUCTION AND SUPPLY CONSTRUCTION OF PERIMETER FENC... See more LALLO, CAGAYAN Rejected 2025-09-12 12:27:12 Returned to Applicant NO LETTER OF INTENT ATTACHED, ... See more
900 DOLE_RO2_2025-09-15_408_ADF8 DECA CONSTRUCTION Rehabilitation of Farm to Mark... See more Nicolas Agatep, Lasam, Cagayan Approved 2025-09-12 13:20:32 Ready for Release Processed in 2 working days.
901 Arm forces and police savings and loans association inc AFPSLAI CAGAYAN Caggay Tuguegarao City Rejected 2025-09-12 14:03:47 Returned to Applicant Expired PCAB. No testing certi... See more
902 NORTH WIDE JAAR CONST CORP REPAIR OF SCHOOL FACILITIES IN... See more TUGUEGARAO CITY Rejected 2025-09-12 14:35:21 Returned to Applicant LETTER OF INTENT ADDRESS TO DO... See more
903 RTC CONSTRUCTION AND SUPPLY CONSTRUCTION OF PERIMETER FENC... See more LALLO, CAGAYAN Rejected 2025-09-12 15:26:04 Returned to Applicant DOUBLE ENTRY
904 DOLE_RO2_2025-09-23_417_RSZP SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF FARM TO MARKET R... See more LAPOGAN, GATTARAN, CAGAYAN Approved 2025-09-12 15:59:48 Ready for Release Processed in 7 working days.
905 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF FARM TO MARKET R... See more NADDUNGAN, GATTARAN, CAGAYAN Rejected 2025-09-12 16:03:14 Returned to Applicant SAFETY OFFICER AND FIRST AIDER... See more
906 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF ROAD AT PALAGAO... See more PALAGAO SUR, GATTARAN, CAGAYAN Rejected 2025-09-12 16:06:47 Returned to Applicant SAFETY OFFICER AND FIRST AIDER... See more
907 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF ROAD AT ZONE IV... See more ZONE IV BARACCAOIT, GATTARAN, CAGAYAN Rejected 2025-09-12 16:09:25 Returned to Applicant SAFETY OFFICER AND FIRST AIDER... See more
908 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF ROAD AT SITIO PI... See more SITIO PINUTULAN, CAPISSAYAN NORTE, GATTARAN, CAGAYAN Rejected 2025-09-12 16:11:22 Returned to Applicant SAFETY OFFICER AND FIRST AIDER... See more
909 DOLE_RO2_2025-09-17_411_RNB3 JAN PAOLA CONSTRUCTION INC. construction of luna hemodialy... See more LALOG 1, Luna, Isabela Approved 2025-09-12 17:24:10 Ready for Release Processed in 3 working days.
910 SHASHA'S CONSTRUCTION AND SUPPLIES IMPROVEMENT OF BURAYOK FALLS ... See more BASAO (GRILLING AREA) GATTARAN, CAGAYAN Rejected 2025-09-13 08:27:14 Returned to Applicant SAFETY OFFICER AND FIRST AIDER... See more
911 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF FARM TO MARKET R... See more MABUNO, GATTARAN, CAGAYAN Rejected 2025-09-13 08:27:36 Returned to Applicant SAFETY OFFICER AND FIRST AIDER... See more
912 SHASHA'S CONSTRUCTION AND SUPPLIES CONSTRUCTION OF ONE BARREL BOX... See more CAPIDDIGAN, GATTARAN, CAGAYAN Rejected 2025-09-13 08:29:44 Returned to Applicant SAFETY OFFICER AND FIRST AIDER... See more
913 DOLE_RO2_2025-09-17_412_E9OB D'LIMITLESS CIVIL ENGINEERING CONSTRUCTION PROPOSED CONSTRUCTION OF ONE S... See more MAHARLIKA HIGHWAY, MINANTE 1, CAUAYAN CITY Approved 2025-09-15 08:17:06 Ready for Release Processed in 3 working days.
914 SCR CONSTRUCTION AND ENTERPRISES DID-899-00154 CONSTRUCTION OF ... See more DIBUL, SAGUDAY, QUIRINO Rejected 2025-09-15 13:25:32 Returned to Applicant 1. CSHP Template Findings: P... See more
915 Wealthmore Construction and Supply Corporation CW301/B: Design and Build of ... See more Carig Norte, Tuguegarao City, Cagayan Rejected 2025-09-15 15:03:47 Returned to Applicant INCOMPLETE ATTACHEMENT
916 Duwa Construction Supply, Delivery and Installat... See more Gonzaga, Cagayan Sta. Ana, Cagayan Amulung, Cagayan Penablanca, Cagayan Camalaniugan, Cagayan Gattaran, Cagayan Buguey, Cagayan Lasam, Cagayan Baggao, Cagayan Rejected 2025-09-15 15:05:03 Returned to Applicant NOT USE UPDATED FORMS
917 JC PALOMO CONSTRUCTION AND CONSTRUCTION SUPPLY Construction of Proposed Two-S... See more Gucab, Echague, Isabela Rejected 2025-09-16 07:49:50 Returned to Applicant Finished project
918 DOLE_RO2_2025-09-23_418_2HJN CJTPASCUAL CONSTRUCTION Concreting of Access Road Lead... See more Minanga Norte, Lasam, Cagayan Approved 2025-09-16 08:15:56 Ready for Release Processed in 6 working days.
919 MILESTONE 888 CONSTRUCTION INC. Construction of Bridge going t... See more San Miguel, Baggao, Cagayan Rejected 2025-09-16 08:16:51 Returned to Applicant LETTER OF INTENT MUST BE ADDRE... See more
920 DOLE_RO2_2025-09-23_415_BP3B EGB CONSTRUCTION CORPORATION (Formerly: EGB CONSTRUCTION) CONSTRUCTION OF DORMITORY AND ... See more CAPITOL COMPOUND, ALIBAGU, CITY OF ILAGAN, ISABELA Approved 2025-09-16 08:54:52 Ready for Release Processed in 5 working days.
921 DOLE_RO2_2025-09-16_409_T9P3 MDU ENTERPRISES AND CONSTRUCTION 2025-D3-CAPITAL OUTLAY-1C: REH... See more SAN MANUEL, ISABELA Approved 2025-09-16 13:14:08 Ready for Release Processed in 1 working days.
922 3JMS CONSTRUCTION Construction of Slope Protecti... See more Zone 1 & 2, Canagatan, Baggao, Cagayan Rejected 2025-09-16 16:10:33 Returned to Applicant LETTER OF INTENT MUST BE ADDRE... See more
923 NETSOLAR INC. Insular Life 2/F Insular Life Building, Maharlika Highway, Villasis, Santiago City, Isabela, Philippines Rejected 2025-09-16 16:29:31 Returned to Applicant Expired PCAB
924 DOLE_RO2_2025-09-18_413_TTV8 RCPS CONSTRUCTION & GENERAL TRADING 2025-D4-COB-CAUAYAN CITY-2-POW... See more NIA MARIIS DIVISION IV, MINANTE 1, CAUAYAN CITY, ISABELA Approved 2025-09-16 17:37:11 Ready for Release Processed in 2 working days.
925 DOLE_RO2_2025-09-18_414_6Z5F RCPS CONSTRUCTION & GENERAL TRADING 2025-D4-OMNISPIS-PS#1-POW 10, ... See more ANGADANAN, ISABELA Approved 2025-09-16 17:44:19 Ready for Release Processed in 2 working days.
926 Infra Towers Philippines E02909-B06-NS-TER24-B224 Brgy. Dipantan, Nagtipunan, Quirino Rejected 2025-09-17 09:04:51 Returned to Applicant 1. Letter address to our Regio... See more
927 DOLE_RO2_2025-09-23_419_F7I3 SHASHA'S CONSTRUCTION AND SUPPLIES COMPLETION OF THREE CLASSROOM ... See more ALBERTO ANOTIO PRIMARY SCHOOL GATTARAN, CAGAYAN Approved 2025-09-17 11:15:49 Ready for Release Processed in 5 working days.
928 DOLE_RO2_2025-09-23_420_U5OZ SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF FARM TO MARKET R... See more CUNIG, GATTARAN, CAGAYAN Approved 2025-09-17 11:16:34 Ready for Release Processed in 5 working days.
929 RCS Solar and Electrical Installation Services 10kw Hybrid Solar Power System Ipil St. Rosario, Santiago City Rejected 2025-09-17 12:08:09 Returned to Applicant No pcab license, application f... See more
930 RCS Solar and Electrical Installation Services 10kw Hybrid Solar Power System Vizcalang St. Calao East, Santiago City Rejected 2025-09-17 12:11:52 Returned to Applicant CSHP application and CSHP temp... See more
931 DOLE_RO2_2025-09-23_416_OTMI R AN CONSTRUCTION AND CONSTRUCTION SUPPLY LGU-DIADI BAC 2025-10 CONCRETI... See more SITIO NAGTIM-OG BRGY. BUGNAY, DIADI, NUEVA VIZCAYA Approved 2025-09-17 12:27:50 Ready for Release Processed in 4 working days.
932 NORTH WIDE JAAR CONST CORP REPAIR OF SCHOOL FACILITIES IN... See more TUGUEGARAO CITY Rejected 2025-09-17 13:21:51 Returned to Applicant did not match calendar year in... See more
933 JOLLIBEE BRANCH Proposed Building of Jollibee ... See more CENTRO 4, TUGUEGARAO CITY Rejected 2025-09-17 13:30:14 Returned to Applicant NO SIGNATURE OVER PRINTED NAME... See more
934 DOLE_RO2_2025-09-23_424_GLJO NORTH WIDE JAAR CONST CORP REPAIR OF SCHOOL FACILITIES IN... See more TUGUEGARAO CITY Approved 2025-09-17 18:14:23 Ready for Release Processed in 4 working days.
935 JAN PAOLA CONSTRUCTION INC. IMPROVEMENT OF MULTI-PURPOSE B... See more Centro 2, Luna, Isabela Rejected 2025-09-18 08:30:00 Returned to Applicant Finished project
936 JAN PAOLA CONSTRUCTION INC. IMPROVEMENT OF MULTI-PURPOSE B... See more Centro 2, Luna, Isabela Rejected 2025-09-18 08:33:42 Returned to Applicant Finished project
937 JAN PAOLA CONSTRUCTION INC. CONSTRUCTION OF DRAINAGE CANAL... See more LUYAO, LUNA, ISABELA Rejected 2025-09-18 08:42:25 Returned to Applicant FINISHED PROJECT
938 DOLE_RO2_2025-09-23_425_PZIT JAN PAOLA CONSTRUCTION INC. COMPLETION OF MULTI-PURPOSE BU... See more UNION, KALINGA, LUNA, ISABELA Approved 2025-09-18 08:47:04 Ready for Release Processed in 4 working days.
939 JAN PAOLA CONSTRUCTION INC. CONSTRUCTION OF LOCAL ROAD IN ... See more SAN MIGUEL, LUNA, ISABELA Rejected 2025-09-18 08:54:02 Returned to Applicant No attached certificate of Saf... See more
940 DKB CONSTRUCTION CONSTRUCTION OF BOX CULVERT (C... See more ASINGA-VIA, BAGGAO, CAGAYAN Rejected 2025-09-18 09:39:29 Returned to Applicant SAFETY OFFICER WITH EXISTING P... See more
941 JS AND ASSOCIATES CONSTRUCTION AND DEVELOPMENT, INC. PH020192 BRGY VILLA QUIRINO, BAGABAG, NUEVA VIZCAYA Rejected 2025-09-18 10:17:04 Returned to Applicant NO TEMPLATE ATTACHED
942 JC PALOMO CONSTRUCTION AND CONSTRUCTION SUPPLY Construction of Proposed Two-S... See more Gucab, Echague, Isabela Rejected 2025-09-18 17:34:19 Returned to Applicant Finished project
943 SHASHA'S CONSTRUCTION AND SUPPLIES COMPLETION OF THREE CLASSROOM... See more AT ALBERTO ANTONIO PRIMARY SCHOOL GATTARAN, CAGAYAN Rejected 2025-09-19 10:05:20 Returned to Applicant DOUBLE ENTRY
944 JC PALOMO CONSTRUCTION AND CONSTRUCTION SUPPLY Construction of Proposed Two-S... See more Gucab, Echague, Isabela Rejected 2025-09-19 10:14:21 Returned to Applicant Finished project
945 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF FARM TO MARKET R... See more AT CUNIG, GATTARAN, CAGAYAN Rejected 2025-09-19 11:36:11 Returned to Applicant DOUBLE ENTRY
946 DOLE_RO2_2025-09-23_426_Y382 SCR CONSTRUCTION AND ENTERPRISES DID-899-00154 CONSTRUCTION OF ... See more DIBUL, SAGUDAY, QUIRINO Approved 2025-09-19 15:38:32 Ready for Release Processed in 3 working days.
947 J.R. MALOLOYON DESIGN AND CONSTRUCTION CONSTRUCTION OF MULTI-CROP DRY... See more VILLA LUNA, CAUAYAN CITY, ISABELA Rejected 2025-09-19 16:35:01 Returned to Applicant For 10 and above workers, plea... See more
948 DOLE_RO2_2025-09-23_427_AHCY MACST CONSTRUCTION AND SUPPLY CONSTRUCTION OF 2 CLASSROOM W/... See more DIDIPIO,KASIBU,NUEVA VIZCAYA Approved 2025-09-20 10:58:29 Ready for Release Processed in 2 working days.
949 DOLE_RO2_2025-09-23_428_EV8H Infra Towers Philippines E02909-B06-NS-TER24-B224 Brgy. Dipantan, Nagtipunan, Quirino Approved 2025-09-23 08:16:49 Ready for Release Processed in 1 working days.
950 Wealthmore Construction and Supply Corporation CW301/B: Design and Build of ... See more Carig Norte, Tuguegarao City, Cagayan Rejected 2025-09-23 09:03:29 Returned to Applicant NO CSHP APPLICATION ATTACHED, ... See more
951 DOLE_RO2_2025-09-23_429_R26Y BENSON BUILDERS IMPROVEMENT OF FARM TO MARKET... See more KASIBU, NUEVA VIZCAYA Approved 2025-09-23 09:34:53 Ready for Release Processed in 1 working days.
952 DOLE_RO2_2025-09-23_430_7TFN M & F ENTERPRISE CONCRETING OF BARANGAY ROADS A... See more BAYOMBONG, NUEVA VIZCAYA Approved 2025-09-23 09:39:24 Ready for Release Processed in 1 working days.
953 DOLE_RO2_2025-09-23_421_FEPS JC SOLIDARITY CONSTRUCTION 2025-MARIIS-DIII-EGPIP-04 PACK... See more ROXAS, ISABELA Approved 2025-09-23 10:20:05 Ready for Release Processed in 1 working days.
954 DOLE_RO2_2025-09-23_422_DKAO ASC CONSTRUCTION AND CONCRETE PRODUCTS 2025-MARIIS-DIII-EGPIP-05 PACK... See more ROXAS, ISABELA Approved 2025-09-23 10:28:29 Ready for Release Processed in 1 working days.
955 DOLE_RO2_2025-09-23_423_23FS JC SOLIDARITY CONSTRUCTION 2025-D3-EGPIP-QUIRINO-C CONSTR... See more QUIRINO, ISABELA Approved 2025-09-23 10:30:48 Ready for Release Processed in 1 working days.
956 Infra Towers Philippines PTCGG0018_OWO-2023-001  Brgy. Penge-Ruyu, Tuguegarao City Cagayan Rejected 2025-09-23 15:14:34 Returned to Applicant NO CERTIFICATE OF EMPLOYMENT O... See more
957 DOLE_RO2_2025-09-30_437_A0LX Infra Towers Philippines PTCGG0018_OWO-2023-001  Brgy. Penge-Ruyu, Tuguegarao City Cagayan Approved 2025-09-23 15:40:58 Ready for Release Processed in 5 working days.
958 Infra Towers Philippines E02940-B06_NS-TER24-G515 Brgy. Nabbuan, Santiago City Isabela Rejected 2025-09-23 16:38:39 Returned to Applicant DOUBLE ENTRY
959 RTC CONSTRUCTION ANDSUPPLY REPAIR/ REHABILITATION OF GID ... See more CARIG, TUGUEGARAO CITY Rejected 2025-09-23 17:02:22 Returned to Applicant LETTER OF INTENT MUST BE ADRES... See more
960 RBGONZALES OPC 791.10 kWp/700 kW AC ROOF-TOP ... See more SM CITY CAUAYAN, MAHARLIKA HW. BRGY DISTRICT 2, CAUAYAN CITY Rejected 2025-09-23 17:13:46 Returned to Applicant No signature of AMO at upper r... See more
961 DOLE_RO2_2025-09-29_435_F1JQ JAN PAOLA CONSTRUCTION INC. CONSTRUCTION OF LOCAL ROAD IN ... See more SAN MIGUEL, LUNA, ISABELA Approved 2025-09-24 08:57:30 Ready for Release Processed in 4 working days.
962 DOLE_RO2_2025-09-25_431_YRB2 WINLEI CONSTRUCTION AND SUPPLY REHABILITATION OF THE MATERIAL... See more Brgy. Magsaysay, Bayombong, Nueva Vizcaya Approved 2025-09-24 09:35:37 Ready for Release Processed in 2 working days.
963 RTC CONSTRUCTION AND SUPPLY CONSTRUCTION OF PERIMETER FENC... See more LALLO, CAGAYAN Rejected 2025-09-24 11:27:52 Returned to Applicant CHE TESTING NOT RELATED TO RTC... See more
964 DOLE_RO2_2025-09-25_432_BN85 JS AND ASSOCIATES CONSTRUCTION AND DEVELOPMENT, INC. PH020192 BRGY VILLA QUIRINO, BAGABAG, NUEVA VIZCAYA Approved 2025-09-24 11:53:46 Ready for Release Processed in 2 working days.
965 Infra Towers Philippines E02940-B06_NS-TER24-G515 Brgy. Nabbuan, Santiago City Isabela Rejected 2025-09-24 13:44:55 Returned to Applicant DOUBLE ENTRY
966 STEC PHILS INC Smart Water Management Project... See more Barangay Minanga, Aparri and surrounding service areas Rejected 2025-09-24 13:47:09 Returned to Applicant NOT USE UPDATED CSHP FORMS AND... See more
967 DOLE_RO2_2025-09-30_439_PKNX Infra Towers Philippines E02940-B06_NS-TER24-G515 Brgy. Nabbuan, Santiago City Isabela Approved 2025-09-24 13:57:25 Ready for Release Processed in 4 working days.
968 Infra Towers Philippines Infra Towers Philippines Brgy. Diego Silang, Diffun, Quirino Rejected 2025-09-24 14:00:08 Returned to Applicant Re apply for CSHP application.... See more
969 Infra Towers Philippines E02931-B06_NS-TER24-B185 Brgy. Diego Silang, Diffun, Quirino Rejected 2025-09-24 14:01:37 Returned to Applicant PLease re apply and click on Q... See more
970 3JMS CONSTRUCTION Construction of Slope Protecti... See more Zone 1 & 2, Canagatan, Baggao, Cagayan Rejected 2025-09-24 14:22:59 Returned to Applicant CHE TESTING EXPIRED
971 DOLE_RO2_2025-09-30_440_UQR4 3JMS CONSTRUCTION Construction of Slope Protecti... See more Dalin, Baggao, Cagayan Approved 2025-09-24 14:51:55 Ready for Release Processed in 4 working days.
972 Lancesoft Infra Solution Inc E02878 B06 / NS-TER24 B113 BARANGAY LUBLUB POBLACION ALFONSO CASTANEDA NUEVA VIZCAYA Rejected 2025-09-24 15:06:53 Returned to Applicant pcab inconsistent with applica... See more
973 5MJ'S CONSTRUCTION COMPLETION OF 2CL BUILDING( TA... See more TAMBAN, ALCALA, CAGAYAN Rejected 2025-09-24 15:07:01 Returned to Applicant finished project
974 STEC PHILS INC Smart Water Management Project... See more Barangay Minanga, Aparri and surrounding service areas Rejected 2025-09-24 15:24:06 Returned to Applicant DID NOT USE UPDATED CSHP TEMPL... See more
975 BMJ BUILDERS Provision of Labor and Materia... See more Regional Government Center, Carig Sur, Tuguegarao City, Cagayan Rejected 2025-09-24 16:53:35 Returned to Applicant CSHP APPLICATION NOT PROPERLY ... See more
976 Wealthmore Construction and Supply Corporation-WERR Corporation International/JV CW301/B: Design and Build of ... See more Carig Norte, Tuguegarao City, Cagayan Rejected 2025-09-25 08:14:56 Returned to Applicant LETTER OF INTENT MUST BE ADDRE... See more
977 DOLE_RO2_2025-09-30_456_FKRF yumadag builders Proposed Building of Jollibee ... See more Centro 4, Tuguegarao City, Cagayan Approved 2025-09-25 08:29:33 Ready for Release Processed in 4 working days.
978 RCS Solar and Electrical Installation Services 10kw Hybrid Solar Power System Vizcalang St. Calao East, Santiago City Rejected 2025-09-25 10:36:37 Returned to Applicant NO PCAB
979 RCS Solar and Electrical Installation Services 10kw Hybrid Solar Power System Ipil St. Rosario, Santiago City Rejected 2025-09-25 10:40:05 Returned to Applicant NO PCAB
980 RCS Solar and Electrical Installation Services 10kw Hybrid Solar Power System Purok 1, Buenavista, Santiago City Rejected 2025-09-25 10:41:08 Returned to Applicant No PCAB
981 DEKM CONSTRUCTION IMPROVEMENT/UPGRADING OF MUNIC... See more BARANGAY II, ENRILE, CAGAYAN Rejected 2025-09-25 13:02:38 Returned to Applicant No NC II-certified operator fo... See more
982 DOLE_RO2_2025-09-25_433_EOYL BMJ BUILDERS Provision of Labor and Materia... See more Regional Government Center, Carig Sur, Tuguegarao City, Cagayan Approved 2025-09-25 14:25:25 Ready for Release Processed in 1 working days.
983 DOLE_RO2_2025-09-25_434_ULW1 J.A.N CONSTRUCTION MEO-DF-2025-019 - CONCRETING O... See more BRGY. DISTRICT IV, BAYOMBONG, NUEVA VIZCAYA. Approved 2025-09-25 15:12:18 Ready for Release Processed in 1 working days.
984 Duwa Construction Supply, Delivery and Installat... See more Gonzaga, Cagayan Sta. Ana, Cagayan Amulung, Cagayan Penablanca, Cagayan Camalaniugan, Cagayan Gattaran, Cagayan Buguey, Cagayan Lasam, Cagayan Baggao, Cagayan Rejected 2025-09-25 15:24:03 Returned to Applicant COMPLETED/ FINISHED PROJECT
985 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF AFUSING DAGA... See more AFUSING DAGA, ALCALA, CAG Rejected 2025-09-25 15:30:12 Returned to Applicant - UNSIGNED APPLICATION FORM
986 DOLE_RO2_2025-09-30_457_QR5J DEKM CONSTRUCTION CONSTRUCTION OF BOX CULVERT AT... See more E. SALVADOR STREET, SAN JOSE, BAGGAO, CAGAYAN Approved 2025-09-26 08:18:39 Ready for Release Processed in 3 working days.
987 DOLE_RO2_2025-09-30_441_H27R SMT CONSTRUCTION 2025-06- Lot 6 - Repair/Improv... See more Capitol Compound, Alibagu, City of Ilagan, Isabela Approved 2025-09-26 10:55:55 Ready for Release Processed in 2 working days.
988 DOLE_RO2_2025-09-29_436_HU3L SMT CONSTRUCTION 2025-06- Lot 7 - Repair/Improv... See more Capitol Compound, Alibagu, City of Ilagan, Isabela Approved 2025-09-26 11:07:20 Ready for Release Processed in 1 working days.
989 DOLE_RO2_2025-09-30_442_A9CI SMT CONSTRUCTION 2025-06- Lot 8 - Repair/Improv... See more Capitol Compound, Alibagu, City of Ilagan, Isabela Approved 2025-09-26 11:20:26 Ready for Release Processed in 2 working days.
990 SMT CONSTRUCTION 2025-06- Lot 6 - Repair/Improv... See more Capitol Compound, Alibagu, City of Ilagan, Isabela Rejected 2025-09-26 11:24:01 Returned to Applicant ISABELA FIELD OFFICE PROJECT
991 SMT CONSTRUCTION 2025-06- Lot 7 - Repair/Improv... See more Capitol Compound, Alibagu, City of Ilagan, Isabela Rejected 2025-09-26 11:26:50 Returned to Applicant ISABELA FIELD OFFICE PROJECT
992 SMT CONSTRUCTION 2025-06- Lot 8 - Repair/Improv... See more Capitol Compound, Alibagu, City of Ilagan, Isabela Rejected 2025-09-26 11:29:41 Returned to Applicant ISABELA FIELD OFFICE PROJECT
993 DOLE_RO2_2025-09-30_443_5PKI SMT CONSTRUCTION 2025-06- Lot 9 - Repair/Improv... See more Capitol Compound, Alibagu, City of Ilagan, Isabela Approved 2025-09-26 11:42:28 Ready for Release Processed in 2 working days.
994 SMT CONSTRUCTION 2025-06- Lot 9 - Repair/Improv... See more Capitol Compound, Alibagu, City of Ilagan, Isabela Rejected 2025-09-26 11:44:38 Returned to Applicant ISABELA FIELD OFFICE PROJECT
995 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF AFUSING DAG... See more AFUSING DAGA, ALCALA, CAG Rejected 2025-09-26 12:17:59 Returned to Applicant DOUBLE ENTRY
996 DOLE_RO2_2025-09-30_448_ACV1 SCR CONSTRUCTION AND ENTERPRISES CONSTRUCTION OF TWO STOREY MUL... See more PUROK 04, TRES REYES, SAGUDAY, QUIRINO Approved 2025-09-26 13:46:39 Ready for Release Processed in 2 working days.
997 MILESTONE 888 CONSTRUCTION INC. Concreting of Road Zone 5, San Miguel, Baggao, Cagayan Rejected 2025-09-26 14:17:39 Returned to Applicant REFER TO CSHP TEMPLATE: 6.2.SP... See more
998 MILESTONE 888 CONSTRUCTION INC. Construction of Bridge going t... See more San Miguel, Baggao, Cagayan Rejected 2025-09-26 14:21:30 Returned to Applicant REFER TO CSHP TEMPLATE: 6.2.SP... See more
999 JAN PAOLA CONSTRUCTION INC. CONSTRUCTION OF DRAINAGE CANAL... See more LUYAO, LUNA, ISABELA Rejected 2025-09-26 17:07:45 Returned to Applicant COMPLETED/ FINISHED PROJECT
1000 JAN PAOLA CONSTRUCTION INC. IMPROVEMENT OF MULTI-PURPOSE B... See more Centro 2, Luna, Isabela Rejected 2025-09-26 17:13:08 Returned to Applicant COMPLETED/ FINISHED PROJECT
1001 DOLE_RO2_2025-09-30_458_R0V4 3JMS CONSTRUCTION Construction of Slope Protecti... See more Zone 1 & 2, Canagatan, Baggao, Cagayan Approved 2025-09-26 17:51:04 Ready for Release Processed in 2 working days.
1002 DOLE_RO2_2025-09-30_459_YWBP SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF FARM TO MARKET R... See more MABUNO, GATTARAN, CAGAYAN Approved 2025-09-27 19:49:56 Ready for Release Processed in 1 working days.
1003 DOLE_RO2_2025-09-30_462_WYXY SHASHA'S CONSTRUCTION AND SUPPLIES CONSTRUCTION OF ONE BARREL BOX... See more CAPIDDIGAN, GATTARAN, CAG Approved 2025-09-27 19:54:30 Ready for Release Processed in 1 working days.
1004 DOLE_RO2_2025-09-30_463_T3FE SHASHA'S CONSTRUCTION AND SUPPLIES IMPROVEMENT OF BURAYOK FALLS A... See more BASAO (GRILLING AREA) GATTARAN, CAGAYAN Approved 2025-09-27 19:58:54 Ready for Release Processed in 1 working days.
1005 DOLE_RO2_2025-10-01_464_ZNT5 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF FARM TO MARKET R... See more NADDUNGAN, GATTARAN, CAGAYAN Approved 2025-09-28 09:55:42 Ready for Release Processed in 2 working days.
1006 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF FARM TO MARKET R... See more NADDUNGAN, GATTARAN, CAGAYAN Rejected 2025-09-28 10:06:05 Returned to Applicant DOUBLE ENTRY
1007 DOLE_RO2_2025-10-01_465_X8WD SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF RAD AT SITIO PIN... See more SITIO PINUTULAN, CAPISSAYAN NORTE, GATTARAN, CAGAYAN Approved 2025-09-28 10:17:42 Ready for Release Processed in 2 working days.
1008 DOLE_RO2_2025-10-01_466_60BR SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF ROAD AT ZONE IV... See more ZONE IV BARACCAOIT, GATTARAN, CAGAYAN Approved 2025-09-28 10:43:43 Ready for Release Processed in 2 working days.
1009 DOLE_RO2_2025-10-01_467_2OP7 SHASHA'S CONSTRUCTION AND SUPPLIES CONCRETING OF ROAD AT PALAGAO ... See more PALAGAO SUR, GATTARAN, CAGAYAN Approved 2025-09-28 11:04:48 Ready for Release Processed in 2 working days.
1010 DOLE_RO2_2025-09-30_450_4TJI POWER 4 ALL INC. Green Lighting of Provincial C... See more Capitol Compound, Bayombong Nueva Vizcaya Approved 2025-09-28 13:08:34 Ready for Release Processed in 1 working days.
1011 Duwa Construction Construction of 780 meters CHB... See more Mocag, Baggao, Cagayan Rejected 2025-09-29 09:19:18 Returned to Applicant AS TO CSHP TEMPLATE: 7.1: RESP... See more
1012 DOLE_RO2_2025-09-30_444_KV3Y ASC CONSTRUCTION AND CONCRETE PRODUCTS 2025-MARIIS-DIV-EGPIP-12; Esta... See more ISABELA Approved 2025-09-29 09:39:23 Ready for Release Processed in 1 working days.
1013 DOLE_RO2_2025-09-30_445_BINS ASC CONSTRUCTION AND CONCRETE PRODUCTS 2025-MARIIS-D1-EGPIP-13 ESTABL... See more ISABELA Approved 2025-09-29 09:43:45 Ready for Release Processed in 1 working days.
1014 DOLE_RO2_2025-09-30_446_8JLZ ASC CONSTRUCTION AND CONCRETE PRODUCTS 2025-MARIIS-DII-EGPIP-9 ESTABL... See more ANGADANAN, ALICIA, SAN MATEO, ISABELA Approved 2025-09-29 09:47:08 Ready for Release Processed in 1 working days.
1015 DOLE_RO2_2025-09-30_447_E6NO ASC CONSTRUCTION AND CONCRETE PRODUCTS 2025-MARIIS-DI-EGPIP-2 ESTABLI... See more ANGADANAN, ECHAGUE, RAMON, CORDON, ISABELA Approved 2025-09-29 09:54:32 Ready for Release Processed in 1 working days.
1016 DOLE_RO2_2025-09-30_451_0BLU JC SOLIDARITY CONSTRUCTION 2025-MARIIS-DIII-EGPIP-3 ESTAB... See more ISABELA Approved 2025-09-29 09:59:49 Ready for Release Processed in 1 working days.
1017 DOLE_RO2_2025-09-30_449_8BBF ASC CONSTRUCTION AND CONCRETE PRODUCTS 2025-MARIIS-DII-EGPIP-8 ESTABL... See more ANGADANAN, CABATUAN, SAN ISIDRO, SAN MATEO, ISABELA Approved 2025-09-29 10:15:58 Ready for Release Processed in 1 working days.
1018 DOLE_RO2_2025-09-30_452_Z0A7 ASC CONSTRUCTION AND CONCRETE PRODUCTS CONTRACT NO. 2025-MARIIS-DIV-E... See more CAUAYAN CITY, CABATUAN, SAN MATEO, ISABELA Approved 2025-09-29 10:20:36 Ready for Release Processed in 1 working days.
1019 DOLE_RO2_2025-09-30_453_NB4M ASC CONSTRUCTION AND CONCRETE PRODUCTS CONTRACT NO. 2025-MARIIS-DIV-E... See more CAUAYAN CITY, LUNA, SAN MATEO, ALICIA, ISABELA Approved 2025-09-29 10:25:01 Ready for Release Processed in 1 working days.
1020 DOLE_RO2_2025-09-30_454_IZNO ASC CONSTRUCTION AND CONCRETE PRODUCTS NIA MARIIS ECHAGUE, SAN ISIDRO, SANTIAGO, ISABELA Approved 2025-09-29 10:28:06 Ready for Release Processed in 1 working days.
1021 DOLE_RO2_2025-09-30_455_XJK2 ASC CONSTRUCTION AND CONCRETE PRODUCTS 2025-MARIIS-DII-EGPIP-10 ESTAB... See more ISABELA Approved 2025-09-29 10:31:08 Ready for Release Processed in 1 working days.
1022 DOLE_RO2_2025-09-30_438_O266 ASC CONSTRUCTION AND CONCRETE PRODUCTS CONTRACT NO. 2025-MARIIS-DIII-... See more AURORA, GAMU, QUIRINO, ROXAS, ISABELA Approved 2025-09-29 10:35:05 Ready for Release Processed in 1 working days.
1023 HABS CONSTRUCTION SERVICES Repair/Rehabilitation of GID W... See more Tumauini Isabela Rejected 2025-09-29 11:21:42 Returned to Applicant Incomplete document. (Letter o... See more
1024 J.R. MALOLOYON DESIGN & CONSTRUCTION CAPITAL OUTLAY CY 2025-CAUAYAN... See more MINANTE I, CAUAYAN CITY, ISABELA Rejected 2025-09-29 11:25:34 Returned to Applicant Under DO 252, Series of 2025, ... See more
1025 HABS CONSTRUCTION SERVICES REPAIR/REHABILITATION OF GID W... See more TUMAUINI, ISABELA Rejected 2025-09-29 11:41:34 Returned to Applicant Incomplete documents. ( one pa... See more
1026 Wealthmore Construction and Supply Corporation-WERR Corporation International/JV CW301/B: Design and Build of ... See more Carig Norte, Tuguegarao City, Cagayan Rejected 2025-09-29 14:03:56 Returned to Applicant DOUBLE ENTRY
1027 Infra Towers Philippines PTCGG0018_OWO-2023-001 Brgy. Penge-Ruyu, Tuguegarao City Cagayan Rejected 2025-09-29 15:45:35 Returned to Applicant CHANGE DATE OF LETTER OF INTEN... See more
1028 RC CONSTRUCTION CONSTRUCTION OF MASONRY DRAINA... See more CUSIPAG ST. EXTENSION, CAGGAY, TUGUEGARAO CITY Rejected 2025-09-29 16:39:51 Returned to Applicant AS TO CSHP TEMPLATE UNDER SECT... See more
1029 DOLE_RO2_2025-09-30_460_4AQG JC SOLIDARITY CONSTRUCTION INFRA-NCB-CBIMO-87-25 REHABILI... See more SANCHEZ MIRA, CAGAYAN Approved 2025-09-29 16:43:46 Ready for Release Processed in 1 working days.
1030 J.R. MALOLOYON DESIGN & CONSTRUCTION CAPITAL OUTLAY CY 2025-CAUAYAN... See more Minante I, Cauayan City, Isabela Rejected 2025-09-30 09:44:06 Returned to Applicant Application form not duly fill... See more
1031 DOLE_RO2_2025-10-02_473_TGOJ VB GINES CONSTRUCTION CONSTRUCTION OF WATER TANKS AN... See more Bayombong, Nueva Vizcaya Approved 2025-09-30 13:27:44 Ready for Release Processed in 3 working days.
1032 RTC CONSTRUCTION REPAIR/ REHABILITATION OF GID ... See more CARIG, CAGAYAN Rejected 2025-09-30 13:55:53 Returned to Applicant NOT PRPOERLY FILLED OUT, CUT P... See more
1033 DOLE_RO2_2025-10-02_474_UYZG TAMRHEY CONSTRUCTION CONSTRUCTION OF NUTRITION BUIL... See more BARANGAY BALZAIN, DUPAX DEL SUR, NUEVA VIZCAYA Approved 2025-09-30 13:59:40 Ready for Release Processed in 2 working days.
1034 DOLE_RO2_2025-09-30_461_TG3Z RC CONSTRUCTION CONSTRUCTION OF MASONRY DRAINA... See more CUSIPAG ST. EXTENSION, CAGGAY, TUGUEGARAO CITY Approved 2025-09-30 14:36:51 Ready for Release Processed in 1 working days.
1035 VB GINES CONSTRUCTION UPGRADING OF N.V. BENGUET JCT.... See more KAYAPA, NUEVA VIZCAYA Rejected 2025-09-30 14:39:46 Returned to Applicant Finish project
1036 RBGONZALES ENGINEERING SERVICES 791.10 kWp/700 kW AC ROOF-TOP ... See more SM CITY CAUAYAN, MAHARLIKA HW. BRGY DISTRICT 2, CAUAYAN CITY Rejected 2025-09-30 15:10:44 Returned to Applicant Cshp template not duly filled ... See more
1037 WERR CORPORATION INTERNATIONAL DESIGN AND BUILD FOR THE REHAB... See more Enrile, Cagayan Rejected 2025-09-30 15:33:31 Returned to Applicant INCOMPLETE ATTACHEMENT
1038 Wealthmore Construction and Supply Corporation-WERR Corporation International/JV CW301/B: Design and Build of ... See more Carig Norte, Tuguegarao City, Cagayan Rejected 2025-09-30 16:58:23 Returned to Applicant NO NCII FOR SCAFFOLDING AND CH... See more
1039 DOLE_RO2_2025-10-02_475_Q128 AMAD CONSTRUCTION SERVICES AND SUPPLY REHABILITATION OF MASONRY DRAI... See more TUGUEGARAO CITY Approved 2025-10-01 13:17:02 Ready for Release Processed in 2 working days.
1040 DOLE_RO2_2025-10-02_476_AO3H Duwa Construction Construction of 780 meters CHB... See more Mocag, Baggao, Cagayan Approved 2025-10-01 14:01:26 Ready for Release Processed in 1 working days.
1041 DOLE_RO2_2025-10-02_477_J90F RTC CONSTRUCTION REPAIR/ REHABILITATION OF GID ... See more CARIG, CAGAYAN Approved 2025-10-01 14:02:46 Ready for Release Processed in 1 working days.
1042 RTC CONSTRUCTION AND SUPPLY CONSTRUCTION OF PERIMETER FENC... See more LALLO, CAGAYAN Rejected 2025-10-01 14:14:01 Returned to Applicant FIRST AIDER WITH EXISTING PROJ... See more
1043 DOLE_RO2_2025-10-02_478_UPHC JJAP CONSTRUCTION CONSTRUCTION OF MASONRY DRAINA... See more ALLAM STREET, DADDA, TUGUEGARAO CITY Approved 2025-10-01 15:14:44 Ready for Release Processed in 1 working days.
1044 DOLE_RO2_2025-10-02_479_6PTM JJAP CONSTRUCTION CONCRETING OF ROAD ALONG WHITE... See more TANZA, TUGUEGARAO CITY Approved 2025-10-01 15:31:23 Ready for Release Processed in 1 working days.
1045 DOLE_RO2_2025-10-02_480_N70J JJAP CONSTRUCTION CONSTRUCTION OF MASONRY DRAINA... See more TANZA, TUGUEGARAO CITY Approved 2025-10-01 15:47:26 Ready for Release Processed in 1 working days.
1046 DOLE_RO2_2025-10-02_468_SU0H PNC CONSTRUCTION CONCRETING OF FARM-TO-MARKET R... See more BARACCAOIT, GATTARAN, CAGAYAN Approved 2025-10-02 07:36:18 Ready for Release Processed in 1 working days.
1047 DOLE_RO2_2025-10-02_469_5MX1 PNC CONSTRUCTION CONCRETING OF ROAD SITIO PADUNGSOL, BARANGAY BASAOM GATTARAN, CAGAYAN Approved 2025-10-02 07:43:54 Ready for Release Processed in 1 working days.
1048 DOLE_RO2_2025-10-02_470_NV5F PNC CONSTRUCTION CONCRETING OF SAN CARLOS - T. ... See more GATTARAN, CAGAYAN Approved 2025-10-02 07:47:03 Ready for Release Processed in 1 working days.
1049 DOLE_RO2_2025-10-02_471_K7SJ PNC CONSTRUCTION CONCRETING OF FARM TO MARKET R... See more SAN VICENTE, GATTARAN, CAGAYAN Approved 2025-10-02 07:49:09 Ready for Release Processed in 1 working days.
1050 DOLE_RO2_2025-10-02_472_CWYB PNC CONSTRUCTION CONCRETING OF ROAD WITH SLOPE ... See more TALIGAN, GATTARAN, CAGAYAN Approved 2025-10-02 07:51:24 Ready for Release Processed in 1 working days.
1051 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF AFUSING DAGA... See more AFUSING DAGA, ALCALA, CAG Rejected 2025-10-02 09:23:22 Returned to Applicant DOUBLE ENTRY
1052 DEKM CONSTRUCTION IMPROVEMENT/UPGRADING OF MUNIC... See more BARANGAY II, ENRILE, CAGAYAN Rejected 2025-10-02 11:36:10 Returned to Applicant DOUBLE ENTRY
1053 SHASHA'S CONSTRUCTION AND SUPPLIES REHABILITATION OF AFUSING DAGA... See more AFUSING DAGA, ALCALA, CAG Ongoing 2025-10-02 15:12:36 regional evaluator N/A
1054 DEKM CONSTRUCTION IMPROVEMENT/UPGRADING OF MUNIC... See more BARANGAY II, ENRILE, CAGAYAN Ongoing 2025-10-02 15:25:03 regional evaluator N/A