| # | CSHP Approved ID | Company/ Establishment Name | Project Name | Project Location | Status | Date Submitted | Application Current Location | Remarks |
|---|---|---|---|---|---|---|---|---|
| 1 | DOLE_RO2_2025-06-03_2_HT43 | 11-16 CONSTRUCTION | NCB-RO2-ISA02-25 REPLACEMENT O... See more | SAN PABLO, ISABELA | Approved | 2025-06-01 20:02:13 | completed | Processed in 1 days. |
| 2 | DOLE_RO2_2025-06-04_3_M7MI | FERDSTAR BUILDERS, INC. / 11-16 CONSTRUCTION (JV) | NCB-RO2-ISA05-25 CONSTRUCTION ... See more | ECHAGUE, ANGADANAN AND SAN GUILLERMO, ISABELA | Approved | 2025-06-01 20:06:23 | Ready for Release | Processed in 2 working days. |
| 3 | DOLE_RO2_2025-06-04_4_1E0L | FERDSTAR BUILDERS, INC. / 11-16 CONSTRUCTION (JV) | NCB-RO2-ISA06-25 CONSTRUCTION ... See more | DINAPIGUE, JONES AND SAN AGUSTIN, ISABELA | Approved | 2025-06-01 20:10:50 | Ready for Release | Processed in 2 working days. |
| 4 | DOLE_RO2_2025-06-04_5_LM8O | 11-16 CONSTRUCTION | NCB-RO2-ISA01-25 CONSTRUCTION ... See more | SAN AGUSTIN, ISABELA | Approved | 2025-06-01 20:17:46 | Ready for Release | Processed in 2 working days. |
| 5 | DOLE_RO2_2025-06-04_6_M3V1 | FERDSTAR BUILDERS, INC. / BOLTRON BUILDERS CORP. (JV) | NCB-RO2-ISA04-25 CONSTRUCTION ... See more | CABAGAN, SAN PABLO AND SANTA MARIA, ISABELA | Approved | 2025-06-01 20:25:39 | Ready for Release | Processed in 2 working days. |
| 6 | DOLE_RO2_2025-06-03_1_W100 | PRIME BUILT CONSTRUCTION & SUPPLY | INFRA-NCB-NVIMO-15-25,PACKAGE ... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-06-01 23:38:37 | completed | Processed in 1 days. |
| 7 | PRIME BUILT CONSTRUCTION & SUPPLY | INFRA-NCB-NVIMO-15-25,PACKAGE ... See more | BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-06-02 00:04:13 | Returned to Applicant | CSHP Program not properly fill... See more | |
| 8 | A-Czar18 Construction | PB-CW-2025-015 - Improvement/C... See more | Guinalbin, Aglipay, Quirino | Rejected | 2025-06-02 23:39:18 | Returned to Applicant | NO FILE UPLOAD AND NEED 1 SO A... See more | |
| 9 | D-ZION DESIGN AND CONSTRUCTION | Construction of Bugkalot High ... See more | New Gumiad, Dupax Del Norte, Nueva Vizcaya | Rejected | 2025-06-03 00:06:58 | Returned to Applicant | NO FILE UPLOAD AND NEED 1 SO A... See more | |
| 10 | J.A.M. Industrial Sales | Installation of SFO Tank | 327 Prenza Highway, Cauayan City, Isabela | Rejected | 2025-06-03 02:00:27 | Returned to Applicant | No signature of owner at PCAB ... See more | |
| 11 | A-Czar18 Construction | PB-CW-2025-015 - Improvement/C... See more | Guinalbin, Aglipay, Quirino | Rejected | 2025-06-03 22:07:48 | Returned to Applicant | No testing certificate attache... See more | |
| 12 | DOLE_RO2_2025-06-09_7_9UDK | A-Czar18 Construction | PB-CW-2025-015 - Improvement/C... See more | Guinalbin, Aglipay, Quirino | Approved | 2025-06-04 00:58:19 | Ready for Release | Processed in 4 working days. |
| 13 | JMD-68 BUILDERS | PB-CW-2025-047 - CONSTRUCTION ... See more | SAN RAMON, AGLIPAY, QUIRINO | Rejected | 2025-06-04 18:52:53 | Returned to Applicant | Need 2 safety Officers and 2 f... See more | |
| 14 | DOLE_RO2_2025-06-10_10_RLKU | ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, INC. | 2025-D3-RESTO-RNIS-BURGOS-PACK... See more | BURGOS, ISABELA | Approved | 2025-06-04 18:53:12 | Ready for Release | Processed in 4 working days. |
| 15 | DOLE_RO2_2025-06-10_11_WUYS | ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, INC. | 2025-D3-RNIS-GAMU-PACKAGE 7: F... See more | GAMU, ISABELA | Approved | 2025-06-04 18:58:18 | Ready for Release | Processed in 4 working days. |
| 16 | DOLE_RO2_2025-06-09_8_6RJW | JMD-68 Builders | PB-2025-029 - CONSTRUCTION/COM... See more | BALLIGUI, MADDELA, QUIRINO | Approved | 2025-06-04 19:07:48 | Ready for Release | Processed in 3 working days. |
| 17 | DOLE_RO2_2025-06-09_9_K7RH | JMD-68 Builders | PB-2025-034 - CONSTRUCTION/COM... See more | BANNAWAG, DIFFUN, QUIRINO | Approved | 2025-06-04 19:12:07 | Ready for Release | Processed in 3 working days. |
| 18 | SL Development Construction Corp | REMAINING WORKS FOR THE TUGUEG... See more | Tuguegarao City, Cagayan Province | Rejected | 2025-06-04 19:50:58 | Returned to Applicant | NO NC2 FOR ELECTRICIAN | |
| 19 | CREST92 Construction & Development Corporation | Concreting of Road along Zone ... See more | Gosi Norte, Tuguegarao City, Cagayan | Rejected | 2025-06-04 20:07:54 | Returned to Applicant | must be 2 FA and 2 SO | |
| 20 | DOUBLE-D CONSTRUCTION | MARK L. SIRINGAN | Rejected | 2025-06-04 20:31:57 | Returned to Applicant | INCOMPLETE ATTACHED DOCUMENTS | ||
| 21 | ARSD CONSTRUCTION CORPORATION | Proposed SPUP 5 Storey Dormito... See more | SPUP Mabini St. Tuguegarao City | Rejected | 2025-06-04 20:42:21 | Returned to Applicant | INCOMPLETE ATTACHED DOCUMENTS | |
| 22 | ARSD CONSTRUCTION CORPORATION | Proposed SPUP 4 Storey Parking... See more | SPUP Mabini St. Tuguegarao City | Rejected | 2025-06-04 20:46:19 | Returned to Applicant | INCOMPLETE ATTACHED DOCUMENTS | |
| 23 | DOUBLE-D CONSTRUCTION | CONSTRUCTION OF 3 CLASSROOMS, ... See more | LINAO ELEMENTARY SCHOOL, TUGUEGARAO CITY | Rejected | 2025-06-04 20:56:12 | Returned to Applicant | NO NC2 FOR SCAFFOLDING, ELECT... See more | |
| 24 | Habiling Construction | Improvement of CBE Building fo... See more | Bayombong, Nueva Vizcaya | Rejected | 2025-06-04 21:22:02 | Returned to Applicant | Template not duly filled up: ... See more | |
| 25 | Habiling Construction | 066-2024 Improvements of FMR S... See more | Didipio,Kasibu,Nueva Vizcaya | Rejected | 2025-06-04 21:58:33 | Returned to Applicant | 1. Template not duly filled up... See more | |
| 26 | DOLE_RO2_2025-06-10_12_LA3V | Dkb construction | Concreting of road at mabini, ... See more | Mabini, baggao, cagayan | Approved | 2025-06-04 21:59:42 | Ready for Release | Processed in 4 working days. |
| 27 | SHANLEY CONSTRUCTION | NCB-INFRA-1SA109-25-CARP-DARIS... See more | San Agustin, Isabela | Rejected | 2025-06-05 01:30:59 | Returned to Applicant | must be 2 FA and 2 SO | |
| 28 | DKB CONSTRUCTION | CONCRETING OF ROAD AT MABINI, ... See more | MABINI, BAGGAO, CAGAYAN | Rejected | 2025-06-05 01:48:58 | Returned to Applicant | DOUBLE ENTRY | |
| 29 | MEGAEAST POWER CONSTRUCTION CORPORATION | NATIONAL GRID CORPORATION OF T... See more | LARION ALTO PINA BLANCA TUGUEGARAO | Rejected | 2025-06-05 19:03:07 | Returned to Applicant | 1. NO NOA,NTP, CONTRACT AGREEM... See more | |
| 30 | RAMIKE CONSTRUCTION | INFRA-NCB-CBIMO-01-25 CONSTRUC... See more | sanchez mira, cagayan | Rejected | 2025-06-06 17:13:37 | Returned to Applicant | MUST BE 2 SO AND 2 FA | |
| 31 | 3JMS CONSTRUCTION | PROPOSED TWO STOREY APARTMENT | UGAC SUR, TUGUEGARAO CITY | Rejected | 2025-06-06 22:37:54 | Returned to Applicant | NO NC2 FOR WELDER, SCAFFOLDING... See more | |
| 32 | CAMIA CONSTRUCTION DEVELOPMENT CORPORATION | REHABILITATION OF BUGALLON PRO... See more | Ramon, Isabela | Rejected | 2025-06-08 22:55:20 | Returned to Applicant | NO CHE TESTING CERT./ CHE OPER... See more | |
| 33 | CAMIA CONSTRUCTION DEVELOPMENT CORPORATION | REHABILITATION OF BUGALLON PRO... See more | Ramon, Isabela | Rejected | 2025-06-08 22:55:27 | Returned to Applicant | DOUBLE ENTRY | |
| 34 | CLG SHALOM BUILDERS INC. | SBC CAUAYAN BR. | GROUND FLR., NATIONAL HIGHWAY, DISTRICT 1, CAUAYAN, ISABELA | Rejected | 2025-06-09 00:40:56 | Returned to Applicant | DOUBLE-ENTRY | |
| 35 | SL Development Construction Corp | REMAINING WORKS FOR THE TUGUEG... See more | Tuguegarao City, Cagayan Province | Rejected | 2025-06-09 01:25:00 | Returned to Applicant | CSHP TEMPLATE NOT PROPERLY FIL... See more | |
| 36 | CLG SHALOM BUILDERS INC. | SBC CAUAYAN BR. | GROUND FLOOR, NATIONAL HIGHWAY, DISTRICT 1, CAUAYAN ISABELA | Rejected | 2025-06-09 01:33:56 | Returned to Applicant | nc2 scaffolding and First Aide... See more | |
| 37 | DOLE_RO2_2025-06-10_16_B4OL | DEKM CONSTRUCTION | CONTRACT NO. INFRA-NCB-CBIMO 4... See more | CUNIG, GATTARAN, CAGAYAN | Approved | 2025-06-09 02:21:23 | Ready for Release | Processed in 2 working days. |
| 38 | BY ADMIN/ VICTORIA CZARINNA L. ACOSTA | PROPOSED NEW RENOVATION OF MAN... See more | G/F SM CITY, BRGY. DISTRICT 2, CAUAYAN CITY, ISABELA | Rejected | 2025-06-09 17:51:59 | Returned to Applicant | NO NEED TO UPLOAD ONLINE IF BY... See more | |
| 39 | BY ADMIN/ PAUL I. MANGANTULAO | PROPOSED TWO STOREY APARTMENT ... See more | DONA FONIE ST., BRGY. SAN FERMIN, CAUAYAN CITY, ISABELA | Rejected | 2025-06-09 18:00:05 | Returned to Applicant | NO NEED TO SUBLMIT ONLINE | |
| 40 | ARSD CONSTRUCTION CORPORATION | Proposed SPUP 4 Storey Parking... See more | SPUP Mabini St. Tuguegarao City | Rejected | 2025-06-09 18:05:45 | Returned to Applicant | PLS REQ. BACKHOE, MIXER AND DU... See more | |
| 41 | GELOAR CONSTRUCTION SERVICES | CONCRETING CABATUAN TO RIVERSI... See more | MABASA, DUPAX DEL NORTE, NUEVA VIZCAYA | Rejected | 2025-06-09 18:12:23 | Returned to Applicant | must be 2 fa and 2 so | |
| 42 | GELOAR CONSTRUCTION SERVICES | CONCRETING OF CEMENTERY FTMR, ... See more | New Gumiad, Dupax Del Norte, Nueva Vizcaya | Rejected | 2025-06-09 18:19:06 | Returned to Applicant | MUST BE 2 FA AND 2 SO | |
| 43 | GELOAR CONSTRUCTION SERVICES | CONCRETING OF LAMO-INEANGAN RO... See more | LAMO, DUPAX DEL SUR, NUEVA VIZCAYA | Rejected | 2025-06-09 18:24:10 | Returned to Applicant | MUST 2 FA AND 2 SO | |
| 44 | DOLE_RO2_2025-06-10_13_948X | GELOAR CONSTRUCTION SERVICES | CONSTRUCTION OF PROTECTION WAL... See more | MUNGUIA, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-06-09 18:26:49 | Ready for Release | Processed in 1 working days. |
| 45 | BENSON BUILDERS | INFRA-NCB-NVIMO-16-25, PACKAGE... See more | SOLANO, NUEVA VIZCAYA | Rejected | 2025-06-09 18:31:36 | Returned to Applicant | MUST BE 2 FA AND 2 SO | |
| 46 | DOLE_RO2_2025-06-10_14_70KR | CAB CONSTRUCTION AND SUPPLY | INFRA-NCB-NVIMO-16-25,PACKAGE ... See more | SOLANO, NUEVA VIZCAYA | Approved | 2025-06-09 18:36:38 | Ready for Release | Processed in 1 working days. |
| 47 | Proposed Commercial and Warehouse Building | Proposed Commercial and Wareho... See more | Caggay, Tuguegarao City | Rejected | 2025-06-09 18:38:37 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 48 | GCT CONSTRUCTION | INFRA-NCB-NVIMO-11-25, CONSTRU... See more | ARITAO, NUEVA VIZCAYA | Rejected | 2025-06-09 18:42:19 | Returned to Applicant | must be 2 so and 2 fa | |
| 49 | MAYHALIGUE CONSTRUCTION AND SUPPLY, INC. | INFRA-NCB-NVIMO-16-25, PACKAGE... See more | SOLANO, NUEVA VIZCAYA | Rejected | 2025-06-09 18:45:19 | Returned to Applicant | MUST BE 2 FA AND 2 SO | |
| 50 | HBT BUILDERS | Construction of Parai MP Hall ... See more | LGU-DUPAX DEL NORTE, NUEVA VIZCAYA | Rejected | 2025-06-09 18:51:51 | Returned to Applicant | Recommended for Disapproval - ... See more | |
| 51 | ARSD CONSTRUCTION CORPORATION | Proposed SPUP 5 Storey Dormito... See more | SPUP Mabini St. Tuguegarao City | Rejected | 2025-06-09 18:57:31 | Returned to Applicant | NO PCAB LICENSE, RULE 1020 | |
| 52 | DOLE_RO2_2025-06-10_17_8VXX | JMD-68 BUILDERS | PB-CW-2025-047 - Construction ... See more | San Ramon, Aglipay, Quirino | Approved | 2025-06-09 19:09:48 | Ready for Release | Processed in 1 working days. |
| 53 | DOLE_RO2_2025-06-10_15_4CNM | ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, INC. | 2025-D3-RESTO-NIS-PACKAGE 1: R... See more | AURORA, ISABELA | Approved | 2025-06-09 19:24:46 | Ready for Release | Processed in 1 working days. |
| 54 | DOLE_RO2_2025-06-11_21_C5GL | PRIME BUILT CONSTRUCTION & SUPPLY | INFRA-NCB-NVIMO-15-25, Package... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-06-09 19:58:23 | Ready for Release | Processed in 2 working days. |
| 55 | DOLE_RO2_2025-06-10_18_OO83 | RDJD CONSTRUCTION | CONCRETING OF NARURON ROAD(BIT... See more | BITNONG, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-06-09 20:20:42 | Ready for Release | Processed in 1 working days. |
| 56 | DIAMOND J BUILDERS | LUSOD INIP, NCB-INFRA-QIMO-13-... See more | MADDELA, QUIRINO | Rejected | 2025-06-09 20:39:19 | Returned to Applicant | Based on DO. 252 series 2025 :... See more | |
| 57 | J.A.N CONSTRUCTION | BALLIGUI CIS, NCB-INFRA-QIMO-1... See more | MADDELA, QUIRINO | Rejected | 2025-06-09 20:46:51 | Returned to Applicant | Based on DO. 252 series 2025 ... See more | |
| 58 | DOLE_RO2_2025-06-10_19_A8EQ | JPLC TRADING | 2024-D3-CAPITAL OUTLAY -10: FU... See more | ISABELA | Approved | 2025-06-09 23:13:04 | Ready for Release | Processed in 1 working days. |
| 59 | DOLE_RO2_2025-06-10_20_KJ04 | JPLC TRADING | 2024-D3-CAPITAL OUTLAY -1K: RE... See more | ISABELA | Approved | 2025-06-09 23:18:04 | Ready for Release | Processed in 1 working days. |
| 60 | DOLE_RO2_2025-06-11_22_851J | Bera construction | Concreting of farm to.market r... See more | Bagunot, baggao, cagayan | Approved | 2025-06-10 01:24:56 | Ready for Release | Processed in 2 working days. |
| 61 | DOLE_RO2_2025-06-11_23_SJC4 | Bera construction | Concreting of farm to market r... See more | Agaman proper, baggao , cagayan | Approved | 2025-06-10 01:34:23 | Ready for Release | Processed in 2 working days. |
| 62 | Proposed Commercial and Warehouse Building | Proposed Commercial and Wareho... See more | Caggay, Tuguegarao City | Rejected | 2025-06-10 03:15:26 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 63 | DOLE_RO2_2025-06-16_28_3POW | RC CONSTRUCTION | PB-INF-2025-02 CONSTRUCTION OF... See more | TUGUEGARAO CITY | Approved | 2025-06-10 22:12:59 | Ready for Release | Processed in 4 working days. |
| 64 | DOLE_RO2_2025-06-13_24_3CNA | DIAMOND J BUILDERS | LUSOD INIP, NCB-INFRA-QIMO-13-... See more | MADDELA, QUIRINO | Approved | 2025-06-11 01:04:20 | Ready for Release | Processed in 3 working days. |
| 65 | DOLE_RO2_2025-06-13_25_B29F | J.A.N CONSTRUCTION | BALLIGUI CIS, NCB-INFRA-QIMO-1... See more | MADDELA, QUIRINO | Approved | 2025-06-11 01:08:52 | Ready for Release | Processed in 3 working days. |
| 66 | DOLE_RO2_2025-06-13_26_J0V7 | D-ZION DESIGN AND CONSTRUCTION | Construction of Bugkalot High ... See more | New Gumiad, Dupax Del Norte, Nueva Vizcaya | Approved | 2025-06-11 03:02:53 | Ready for Release | Processed in 3 working days. |
| 67 | YZK BUILDERS | Brgy. Ambatali, Ramon, Isabela | Rejected | 2025-06-11 16:59:00 | Returned to Applicant | LOI IS ONLY ATTACHED | ||
| 68 | YZK BUILDERS | Design and Build of 20,000 bag... See more | Brgy. Ambatali, Ramon, Isabela | Rejected | 2025-06-11 17:01:22 | Returned to Applicant | LOI IS ONLY ATTACHED | |
| 69 | YZK BUILDERS | Construction of Guard House at... See more | Tumauini Isabela | Rejected | 2025-06-11 17:16:52 | Returned to Applicant | LOI OF INTENT IS ONLY ATTACHED | |
| 70 | ALIGWA CONSTRUCTION SERVICES | Improvement of Irrigation Cana... See more | Didipio, Kasibu, Nueva Vizcaya | Rejected | 2025-06-11 17:42:18 | Returned to Applicant | incomplete attachments | |
| 71 | ALIGWA CONSTRUCTION SERVICES | Improvement of Irrigation Cana... See more | Didipio, Kasibu, Nueva Vizcaya | Rejected | 2025-06-11 18:07:55 | Returned to Applicant | incomplete attachments and ple... See more | |
| 72 | YZK BUILDERS | Construction of Guard House at... See more | Tumauini Isabela | Rejected | 2025-06-11 19:05:43 | Returned to Applicant | MUST BE 2 FA AND 2 SO | |
| 73 | YZK BUILDERS | Construction of Central Nurser... See more | Tumauini Isabela | Rejected | 2025-06-11 20:33:32 | Returned to Applicant | MUST BE 2 FA AND 2 SO | |
| 74 | YZK BUILDERS | Construction of Guard House at... See more | Tumauini Isabela | Rejected | 2025-06-11 20:34:40 | Returned to Applicant | Under DO 252, Series of 2025, ... See more | |
| 75 | MASTER Z CONSTRUCTION SERVICES | CONSTRUCTION OF CHB CANAL LINI... See more | BINTAWAN SUR, VILLAVERDE, NUEVA VIZCAYA | Rejected | 2025-06-12 00:15:19 | Returned to Applicant | NC2 TRANSIT MIXER | |
| 76 | MASTER Z CONSTRUCTION SERVICES | CONSTRUCTION OF CHB CANAL LINI... See more | BINTAWAN SUR, VILLAVERDE, NUEVA VIZCAYA | Rejected | 2025-06-12 00:38:09 | Returned to Applicant | nc2 transit mixer | |
| 77 | D'Limitless Civil Engineering Construction | Proposed Construction of Two (... See more | Brgy. Ambalatungan, Santiago City Isabela | Rejected | 2025-06-12 01:35:38 | Returned to Applicant | SAFETY OFFICER AND FIRST AIDER... See more | |
| 78 | D'Limitless Civil Engineering Construction | Proposed Construction of Two (... See more | Brgy. Ambalatungan, Santiago City Isabela | Rejected | 2025-06-12 01:39:52 | Returned to Applicant | ONLY OSH PERSONNEL AND NCII SK... See more | |
| 79 | MASTER Z CONSTRUCTION SERVICES | CONSTRUCTION OF RIVER WALL PHA... See more | BINTAWAN SUR, VILLAVERDE, NUEVA VIZCAYA | Rejected | 2025-06-12 01:45:02 | Returned to Applicant | same Safety Officer and First ... See more | |
| 80 | MASTER Z CONSTRUCTION SERVICES | CONCRETING OF UNAON-STA LUCIA ... See more | UNAON-STA. LUCIA, BAGABAG, NUEVA VIZCAYA | Rejected | 2025-06-12 02:49:14 | Returned to Applicant | same Safety Officer and First ... See more | |
| 81 | JOCELYN M. TAGUINOD | PROPOSED CONSTRUCTION OF TWO S... See more | #87 CAMPOS STREET, CARITAN CENTRO TUGUEGARAO CITY, CAGAYAN | Rejected | 2025-06-12 19:33:38 | Returned to Applicant | simplified | |
| 82 | Sifu J Builders Corporation | WIDENING FARM TO MARKET ROAD P... See more | Purok 3, Brgy. Tukod, Kasibu, Nueva Vizcaya | Rejected | 2025-06-12 20:19:05 | Returned to Applicant | no signature of project owner,... See more | |
| 83 | DOLE_RO2_2025-06-13_27_BO9Q | AMBAGUIO BUILDERS | INFRA-NCB-NVIMO-15-25, PACKAGE... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-06-12 20:50:11 | Ready for Release | Processed in 1 working days. |
| 84 | DOLE_RO2_2025-06-16_29_QL2S | OML CONSTRUCTION | Construction of 2 Classrooms a... See more | Libag, Tuguegarao City | Approved | 2025-06-12 21:49:44 | Ready for Release | Processed in 2 working days. |
| 85 | SL Development Construction Corp | REMAINING WORKS FOR THE TUGUEG... See more | Tuguegarao City, Cagayan Province | Rejected | 2025-06-12 22:47:48 | Returned to Applicant | NO SIGNATURE OF PROJECT OWNER,... See more | |
| 86 | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-45m, 24sqm, 320kph, 150D k... See more | Benito Soliven, Isabela | Rejected | 2025-06-13 00:41:42 | Returned to Applicant | LETTER OF INTENT IS ONLY ATTAC... See more | |
| 87 | MASTER Z CONSTRUCTION SERVICES | REHABILITATION/CONSTRUCTION OF... See more | BINTAWAN SUR & BINTAWAN NORTE, VILLAVERDE, NUEVA VIZCAYA | Rejected | 2025-06-15 18:13:14 | Returned to Applicant | same Safety Officer and First ... See more | |
| 88 | MASTER Z CONSTRUCTION SERVICES | UPGRADING/IMPROVEMENT OF PUROK... See more | PUROK 1, SAN PABLO, DIADI, NUEVA VIZCAYA | Rejected | 2025-06-15 18:16:58 | Returned to Applicant | nc2 transit mixer | |
| 89 | DOLE_RO2_2025-06-26_72_54X7 | SHANLEY CONSTRUCTION | NCB-INFRA-1SA109-25-CARP-DARIS... See more | San Agustin, Isabela | Approved | 2025-06-15 20:46:12 | Ready for Release | BLURRED CERTIFICATE OF NCII SK... See more |
| 90 | ARSD CONSTRUCTION CORPORATION | PROPOSED SPUP 4 STOREY PARKING... See more | SPUP, MABINI ST., TUGUEGARAO CITY | Rejected | 2025-06-15 20:59:41 | Returned to Applicant | PLS REQ. BACKHOE, SIGNATURE OF... See more | |
| 91 | ARSD CONSTRUCTION CORPORATION | PROPOSED SPUP 5 STOREY DORMI... See more | SPUP, MABINI ST., TUGUEGARAO CITY | Rejected | 2025-06-15 21:04:26 | Returned to Applicant | NO SIGNATURE OF CONTRACTOR (CS... See more | |
| 92 | DOLE_RO2_2025-06-18_31_GA0P | CAB CONSTRUCTION AND SUPPLY | INFRA-NCB-NVIMO-16-25, PACKAGE... See more | SOLANO, NUEVA VIZCAYA | Approved | 2025-06-16 00:08:13 | Ready for Release | Processed in 3 working days. |
| 93 | DOLE_RO2_2025-06-16_30_159N | ACES 3 CONSTRUCTION | NCB-INFRA-QIMO-01-25,P4-Repair... See more | Aglipay, Quirino | Approved | 2025-06-16 00:08:49 | Ready for Release | Processed in 1 working days. |
| 94 | DOLE_RO2_2025-06-18_32_HRQV | CAB CONSTRUCTION AND SUPPLY | INFRA-NCB-NVIMO-15-25, PACKAGE... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-06-16 00:12:29 | Ready for Release | Processed in 3 working days. |
| 95 | DOLE_RO2_2025-06-18_33_MEPE | GEOLAR CONSTRUCTION SERVICES | CONCRETING CABATUAN TO RIVERSI... See more | BRGY. MABASA, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-06-16 00:16:06 | Ready for Release | Processed in 3 working days. |
| 96 | DOLE_RO2_2025-06-18_34_30CE | GEOLAR CONSTRUCTION SERVICES | CONCRETING OF LAMO-INEANGAN RO... See more | BARANGAY LAMO, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-06-16 00:19:17 | Ready for Release | Processed in 3 working days. |
| 97 | DOLE_RO2_2025-06-18_35_8V47 | GEOLAR CONSTRUCTION SERVICES | CONCRETING OF CEMENTERY FTMR, ... See more | BRGY. NEW GUMIAD, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-06-16 00:22:31 | Ready for Release | Processed in 3 working days. |
| 98 | DOLE_RO2_2025-06-18_36_P8RT | GCT CONSTRUCTION | INFRA-NCB-NVIMO-11-25, CONSTRU... See more | ARITAO, NUEVA VIZCAYA | Approved | 2025-06-16 00:30:21 | Ready for Release | Processed in 3 working days. |
| 99 | DOLE_RO2_2025-06-18_37_GD78 | MAYHALIGUE CONSTRUCTION AND SUPPLY, INC. | INFRA-NCB-NVIMO-16-25, PACKAGE... See more | SOLANO, NUEVA VIZCAYA | Approved | 2025-06-16 00:34:40 | Ready for Release | Processed in 3 working days. |
| 100 | DOLE_RO2_2025-06-18_38_NG9X | BENSON BUILDERS | INFRA- NCB-NVIMO-16-25, PACKAG... See more | SOLANO, NUEVA VIZCAYA | Approved | 2025-06-16 00:40:29 | Ready for Release | Processed in 3 working days. |
| 101 | DOLE_RO2_2025-06-20_43_L04P | SILVERSKY CONSTRUCTION | UPGRADING OF 1.90KM BINUANGAN-... See more | BINUANGAN, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-06-16 00:46:08 | Ready for Release | Processed in 5 working days. |
| 102 | TATUM CONSTRUCTION | CONCRETING OF I.650KM YABBI FT... See more | BRGY. YABBI, DUPAX DEL NORTE, NUEVA VIZCAYA | Rejected | 2025-06-16 00:51:44 | Returned to Applicant | EXPIRED PCAB | |
| 103 | D'Limitless Civil Engineering Construction | Proposed Construction of Two (... See more | Brgy. Ambalatungan, Santiago City Isabela | Rejected | 2025-06-16 03:08:58 | Returned to Applicant | OSH PERSONNEL( SAFETY OFFICER ... See more | |
| 104 | Robert Frederick/ Marietta Bastable | Proposed 3-storey Residential ... See more | Grand Victoria Heights Subd. Libag Norte Tuguegarao City | Rejected | 2025-06-16 18:06:27 | Returned to Applicant | SIMPLIFIED | |
| 105 | Radiance Solar Solutions Inc. | 65MW San Pablo Solar Power Pro... See more | Brgy. Annanuman San Pablo Isabela | Rejected | 2025-06-16 18:57:09 | Returned to Applicant | MUST BE 2 FA AND 2 SO (COSH NO... See more | |
| 106 | DOLE_RO2_2025-06-18_39_VMK8 | JIT BUILDERS | Improvement/Construction of Fa... See more | Mangandingay, Cabarroguis, Quirino. | Approved | 2025-06-16 19:27:33 | Ready for Release | Processed in 2 working days. |
| 107 | DOLE_RO2_2025-06-18_40_JOYU | JIT BUILDERS | Improvement/Concreting of Farm... See more | San Antonio, Aglipay, Quirino. | Approved | 2025-06-16 20:23:11 | Ready for Release | Processed in 2 working days. |
| 108 | DOLE_RO2_2025-06-18_41_2U7Z | JIT BUILDERS | Improvement/Concreting of Farm... See more | Ramos, Aglipay, Quirino. | Approved | 2025-06-16 21:00:01 | Ready for Release | Processed in 2 working days. |
| 109 | DOLE_RO2_2025-06-20_44_GSNU | MAYHALIGUE CONSTRUCTION AND SUPPLY, INC. | INFRA-NCB-NVIMO-17-25, PACKAGE... See more | VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-06-16 21:13:49 | Ready for Release | Processed in 4 working days. |
| 110 | DOLE_RO2_2025-06-20_45_Z7DW | E.M. BAYATAN CONSTRUCTION | INFRA- NCB-NVIMO-17-25, CONSTR... See more | VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-06-16 21:19:13 | Ready for Release | Processed in 4 working days. |
| 111 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:26:35 | Returned to Applicant | DOUBLE ENTRY | |
| 112 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:27:04 | Returned to Applicant | DOUBLE ENTRY | |
| 113 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:27:53 | Returned to Applicant | DOUBLE ENTRY | |
| 114 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:28:47 | Returned to Applicant | DOUBLE ENTRY | |
| 115 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:29:24 | Returned to Applicant | DOUBLE ENTRY | |
| 116 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:29:53 | Returned to Applicant | DOUBLE ENTRY | |
| 117 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:30:58 | Returned to Applicant | DOUBLE ENTRY | |
| 118 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:31:59 | Returned to Applicant | DOUBLE ENTRY | |
| 119 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:32:54 | Returned to Applicant | DOUBLE ENTRY | |
| 120 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:46:33 | Returned to Applicant | DOUBLE ENTRY | |
| 121 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:47:11 | Returned to Applicant | DOUBLE ENTRY | |
| 122 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:48:18 | Returned to Applicant | DOUBLE ENTRY | |
| 123 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:48:45 | Returned to Applicant | DOUBLE ENTRY | |
| 124 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:49:11 | Returned to Applicant | DOUBLE ENTRY | |
| 125 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:49:34 | Returned to Applicant | DOUBLE ENTRY | |
| 126 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:50:05 | Returned to Applicant | DOUBLE ENTRY | |
| 127 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:50:35 | Returned to Applicant | DOUBLE ENTRY | |
| 128 | J.A UBONGEN CONSTRUCTION | lot70 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:51:01 | Returned to Applicant | DOUBLE ENTRY | |
| 129 | J.A UBONGEN CONSTRUCTION | lot72 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:53:25 | Returned to Applicant | DOUBLE ENTRY | |
| 130 | J.A UBONGEN CONSTRUCTION | lot72 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:53:56 | Returned to Applicant | DOUBLE ENTRY | |
| 131 | J.A UBONGEN CONSTRUCTION | lot72 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:54:48 | Returned to Applicant | DOUBLE ENTRY | |
| 132 | J.A UBONGEN CONSTRUCTION | lot72 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:55:11 | Returned to Applicant | DOUBLE ENTRY | |
| 133 | J.A UBONGEN CONSTRUCTION | lot72 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:55:33 | Returned to Applicant | DOUBLE ENTRY | |
| 134 | J.A UBONGEN CONSTRUCTION | lot72 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:55:59 | Returned to Applicant | DOUBLE ENTRY | |
| 135 | J.A UBONGEN CONSTRUCTION | lot72 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:56:22 | Returned to Applicant | DOUBLE ENTRY | |
| 136 | J.A UBONGEN CONSTRUCTION | lot72 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:56:47 | Returned to Applicant | DOUBLE ENTRY | |
| 137 | J.A UBONGEN CONSTRUCTION | lot72 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-16 21:57:12 | Returned to Applicant | DOUBLE ENTRY | |
| 138 | Mr. and Mrs. Roel Andrew/ Iris-Jane Ravelo | PROPOSED 3-STOREY RESIDENTIAL ... See more | Lt.13 Blk 8 Grand Victoria Heights Subd. Libag Norte tuguegarao City | Rejected | 2025-06-16 22:57:50 | Returned to Applicant | simplified | |
| 139 | MASTER Z CONSTRUCTION SERVICES | CONCRETING OF UNAON-STA LUCIA ... See more | UNAON-STA. LUCIA, BAGABAG, NUEVA VIZCAYA | Rejected | 2025-06-17 00:53:06 | Returned to Applicant | PLS REQ. ROAD ROLLER & GRA... See more | |
| 140 | DOLE_RO2_2025-06-20_46_B625 | MASTER Z CONSTRUCTION SERVICES | CONSTRUCTION OF CHB CANAL LINI... See more | BINTAWAN SUR, VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-06-17 01:31:35 | Ready for Release | Processed in 4 working days. |
| 141 | DOLE_RO2_2025-06-20_47_DCIE | MASTER Z CONSTRUCTION SERVICES | UPGRADING/IMPROVEMENT OF PUROK... See more | PUROK 1, SAN PABLO, DIADI, NUEVA VIZCAYA | Approved | 2025-06-17 01:40:01 | Ready for Release | Processed in 4 working days. |
| 142 | DOLE_RO2_2025-06-18_42_KLEL | CLG SHALOM BUILDERS INC. | SBC CAUYAN ISABELA BRANCH | GROUND FLOOR, 2-STOREY BUILDING (BESIDES VICENTE MANLAPAZ BUILDING) NATIONAL HIGHWAY, DISTRICT 1, CAUAYAN, ISABELA | Approved | 2025-06-17 02:06:51 | Ready for Release | Processed in 2 working days. |
| 143 | Proposed Commercial and Warehouse Building | Proposed Commercial and Wareho... See more | Caggay, Tuguegarao City, Cagayan | Rejected | 2025-06-17 16:55:33 | Returned to Applicant | INCOMPLETE DOCCUMENT ATTACHED | |
| 144 | QCD CONSTRUCTION AND SUPPLY | INFRA-NCB-NVIMO-16-25, PACKAGE... See more | SAN LUIS, SOLANO, NUEVA VIZCAYA | Rejected | 2025-06-17 17:57:40 | Returned to Applicant | EXPIRED PCAB | |
| 145 | DOLE_RO2_2025-06-20_48_R8RI | N-J CONSTRUCTION | IMPROVEMENT OF CORE SHELTER SI... See more | BARANGAY TADJI, KASIBU, NUEVA VIZCAYA | Approved | 2025-06-17 18:05:54 | Ready for Release | Processed in 3 working days. |
| 146 | DOLE_RO2_2025-06-20_49_NSHA | WINLEI CONSTRUCTION AND SUPPLY | REHABILITATION/IMPROVEMENT OF ... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-06-17 18:10:38 | Ready for Release | Processed in 3 working days. |
| 147 | DOLE_RO2_2025-06-20_50_P257 | WINLEI CONSTRUCTION AND SUPPLY | INSTALLATION OF DIRECTIONAL SI... See more | CAPITOL COMPOUND, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-06-17 18:15:05 | Ready for Release | Processed in 3 working days. |
| 148 | DOLE_RO2_2025-06-24_54_0FQN | MAK-CT Construction OPC | Construction of Canal Lining (... See more | Lasam, Cagayan | Approved | 2025-06-17 18:59:20 | Ready for Release | Processed in 5 working days. |
| 149 | ARVEA’S CONSTRUCTION | NCB-R02-TRMP02-25 CONSTRUCTION... See more | TUMAUINI, ISABELA | Rejected | 2025-06-17 19:04:21 | Returned to Applicant | Under DO 252, Series of 2025, ... See more | |
| 150 | DOLE_RO2_2025-06-20_51_WMQ6 | YZK BUILDERS | Design and Build of 20,000 bag... See more | Brgy. Ambatali, Ramon, Isabela | Approved | 2025-06-17 23:09:00 | Ready for Release | Processed in 3 working days. |
| 151 | Municipality of Ramon, Isabela | UPGRADING OF LOCAL ACCESS ROAD... See more | Burgos, Ramon, Isabela | Rejected | 2025-06-17 23:11:29 | Returned to Applicant | incomplete documents | |
| 152 | DOLE_RO2_2025-06-20_52_AUSF | ARVEA’S CONSTRUCTION | NCB-R02-TRMP02-25 CONSTRUCTION... See more | TUMAUINI, ISABELA | Approved | 2025-06-18 16:45:34 | Ready for Release | Processed in 2 working days. |
| 153 | Municipality of Ramon, Isabela | UPGRADING OF LOCAL ACCESS ROAD... See more | Burgos, Ramon, Isabela | Rejected | 2025-06-18 18:49:36 | Returned to Applicant | Under DO 252, Series of 2025, ... See more | |
| 154 | DOLE_RO2_2025-06-20_53_FHBJ | BUILDTEK CONSTRUCTION | Repair/Rehabilitation of Dibul... See more | Barangay, Dibulo, Dinapigue, Isabela | Approved | 2025-06-18 18:58:21 | Ready for Release | Processed in 2 working days. |
| 155 | WILLIE'S CONSTRUCTION | CONSTRUCTION OF 4'' CHB CANAL ... See more | ARITAO, NUEVA VIZCAYA | Rejected | 2025-06-18 22:45:07 | Returned to Applicant | CSHP TEMPLATE NO PROPERLY FILL... See more | |
| 156 | Radiance Solar Solutions Inc. | 65MW San Pablo Solar Power Pro... See more | Brgy. Annanuman San Pablo Isabela | Rejected | 2025-06-18 23:41:14 | Returned to Applicant | Incomplete | |
| 157 | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED TELEC... See more | PUROK 1 BRGY STA LUCIA, BAGABAG, NUEVA VIZCAYA | Rejected | 2025-06-19 02:14:38 | Returned to Applicant | NO SIGNATURE IN PCAB. NO CERT ... See more | |
| 158 | DOLE_RO2_2025-06-24_55_VPPG | RAMIKE CONSTRUCTION | NFRA-NCB-CBIMO-01-25 CONSTRUCT... See more | SANCHEZ MIRA, CAGAYAN | Approved | 2025-06-19 17:23:01 | Ready for Release | Processed in 3 working days. |
| 159 | J.A UBONGEN CONSTRUCTION | Lot70 Repair/Rehabilitation of... See more | Barangay Bucal sur Dinapigue Isabela | Rejected | 2025-06-19 18:10:22 | Returned to Applicant | No NCII Scaffolding | |
| 160 | J.A UBONGEN CONSTRUCTION | Lot72 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-06-19 18:18:57 | Returned to Applicant | EXPIRED PCAB. Cert of Ramos is... See more | |
| 161 | Harmonic System Incorporated | Limbauan Solar Power Plant | Limbauan, San Pablo, Isabela | Rejected | 2025-06-19 20:21:49 | Returned to Applicant | As per DO 252 s 2025 effective... See more | |
| 162 | DOLE_RO2_2025-06-24_56_LT02 | BENSON BUILDERS | INFRA-NCB-NVIMO-10-25, REHABIL... See more | STA. FE, NUEVA VIZCAYA | Approved | 2025-06-19 21:42:10 | Ready for Release | Processed in 3 working days. |
| 163 | DOLE_RO2_2025-06-24_57_WYTQ | BENSON BUILDERS | IMPROVEMENT OF ANTUTOT-ALLOY R... See more | BRGY. ALLOY, KASIBU, NUEVA VIZCAYA | Approved | 2025-06-19 21:45:51 | Ready for Release | Processed in 3 working days. |
| 164 | DOLE_RO2_2025-06-24_58_684X | BENSON BUILDERS | INFRA-NCB-NVIMO-03-25, CONSTRU... See more | BAMBANG, NUEVA VIZCAYA | Approved | 2025-06-19 21:50:39 | Ready for Release | Processed in 3 working days. |
| 165 | DOLE_RO2_2025-06-24_59_8FTQ | JKCEZ | CONCRETING OF PUROK APUNAN ROA... See more | BRGY. MACABENGA, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-06-19 21:55:44 | Ready for Release | Processed in 3 working days. |
| 166 | DOLE_RO2_2025-06-24_60_DUK7 | JKCEZ CONSTRUCTION | CONCRETING OF SADDLE ROAD | BRGY. MACABENGA, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-06-19 22:04:31 | Ready for Release | Processed in 3 working days. |
| 167 | C.D.J. BUILDERS AND CONSTRUCTION SUPPLIES | INFRA-NCB-NVIMO-17-25, PACKAGE... See more | VILLAVERDE, NUEVA VIZCAYA | Rejected | 2025-06-19 22:12:18 | Returned to Applicant | ABOUT TO EXPIRE PCAB (JUNE 25,... See more | |
| 168 | DOLE_RO2_2025-06-24_61_NM7E | 4 KIDS BUILDERS AND CONSTRUCTION SUPPLY | INFRA-NCB-NVIMO-06-25, CONSTRU... See more | DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-06-19 22:18:33 | Ready for Release | Processed in 3 working days. |
| 169 | J. A UBONGEN CONSTRUCTION | Lot54 Repair/Rrhabilitation of... See more | San Agustin Isabela | Rejected | 2025-06-19 22:24:59 | Returned to Applicant | EXPIRED PCAB | |
| 170 | DOLE_RO2_2025-06-24_62_XYUF | CAB CONSTRUCTION AND SUPPLY | IMPROVEMENT OF GONGGONGOB ROAD... See more | VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-06-19 22:27:38 | Ready for Release | Processed in 3 working days. |
| 171 | ARSD CONSTRUCTION CORPORATION | Proposed SPUP 4 Storey Parking... See more | SPUP Mabini St. Tuguegarao City | Rejected | 2025-06-19 23:13:32 | Returned to Applicant | Incomplete | |
| 172 | ARSD CONSTRUCTION CORPORATION | Proposed SPUP 5 Storey Dormito... See more | SPUP Mabini St. Tuguegarao City | Rejected | 2025-06-19 23:17:41 | Returned to Applicant | Incomplete | |
| 173 | DOLE_RO2_2025-06-25_66_BPXG | J. A UBONGEN CONSTRUCTION | Repair/Rehabilitation of San I... See more | San Isidro Isabela | Approved | 2025-06-19 23:19:17 | Ready for Release | Processed in 4 working days. |
| 174 | DOLE_RO2_2025-06-24_63_VM9Q | QCD CONSTRUCTION AND SUPPLY | INFRA-NCB-NVIMO-16-25, PACKAGE... See more | SAN LUIS, SOLANO, NUEVA VIZCAYA | Approved | 2025-06-19 23:46:47 | Ready for Release | Processed in 3 working days. |
| 175 | J. A UBONGEN CONSTRUCTION | Lot55 Repair/Rehabilitation of... See more | Jones Isabela | Rejected | 2025-06-22 17:35:46 | Returned to Applicant | EXPIRED PCAB | |
| 176 | J. A UBONGEN CONSTRUCTION | Lot58 Repair/Rehabilitation of... See more | Barangay Linamanan Jones Isabela | Rejected | 2025-06-22 17:44:14 | Returned to Applicant | EXPIRED PCAB | |
| 177 | J.A UBONGEN CONSTRUCTION | Lot58 Repair/Rehabilitation of... See more | Barangay Linamanan Jones Isabela | Rejected | 2025-06-22 17:53:54 | Returned to Applicant | double entry application #177 | |
| 178 | WILLIE'S CONSTRUCTION | CONSTRUCTION OF 4'' CHB CANAL ... See more | ARITAO, NUEVA VIZCAYA | Rejected | 2025-06-22 19:55:04 | Returned to Applicant | NO TESTING CERTIFICATE OF DUMP... See more | |
| 179 | JURIS CONSTRUCTION & BUILDERS | Improvement/Concreting of Farm... See more | Victoria, Aglipay, Quirino | Rejected | 2025-06-22 22:51:59 | Returned to Applicant | Finished Project- (Letter of ... See more | |
| 180 | DOLE_RO2_2025-06-25_67_BZFN | CAMIA CONSTRUCTION DEVELOPMENT CORPORATION | REHABILITATION OF BUGALLON PRO... See more | Ramon, Isabela | Approved | 2025-06-22 23:04:47 | Ready for Release | Processed in 2 working days. |
| 181 | JURIS CONSTRUCTION & BUILDERS | PB-CW-2025-012- IMPROVEMENT/CO... See more | Cardenas, Saguday, Quirino | Rejected | 2025-06-23 00:21:27 | Returned to Applicant | Finished Project ( June 23, 20... See more | |
| 182 | MASTER Z CONSTRUCTION SERVICES | CONSTRUCTION OF RIVER WALL PHA... See more | BINTAWAN SUR, VILLAVERDE, NUEVA VIZCAYA | Rejected | 2025-06-23 00:36:23 | Returned to Applicant | FIRST AIDER IS NOT VALID (MUST... See more | |
| 183 | RJR'S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | STA MARGARITA,BAGGAO,CAGAYAN | Rejected | 2025-06-23 17:10:51 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 184 | DOLE_RO2_2025-06-25_68_JT08 | AMBAGUIO BUILDERS | INSTALLATION OF CAPITOL COMPOU... See more | CAPITOL COMPOUND, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-06-23 18:16:17 | Ready for Release | Processed in 2 working days. |
| 185 | RJR,S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | STA.MARGARITA,BAGGAO,CAGAYAN | Rejected | 2025-06-23 18:17:26 | Returned to Applicant | UNSIGNED PCAB AND EXPIRED EQUI... See more | |
| 186 | RJR'S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | IBULO,BAGGAO,CAGAYAN | Rejected | 2025-06-23 18:42:58 | Returned to Applicant | double entry (jurisdiction of ... See more | |
| 187 | DOLE_RO2_2025-06-24_64_OZ4D | AJN24 CONSTRUCTION | NCB-INFRA-QIMO-01-02, P6, ADRI... See more | AGLIPAY, QUIRINO | Approved | 2025-06-23 18:56:50 | Ready for Release | Processed in 1 working days. |
| 188 | RJR'S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | CARUPIAN, BAGGAO,CAGAYAN | Rejected | 2025-06-23 19:03:39 | Returned to Applicant | UNSIGNED PCAB AND EXPIRED EQUI... See more | |
| 189 | DOLE_RO2_2025-06-25_69_F4TT | TATUM CONSTRUCTION | CONCRETING OF I.650KM YABBI FT... See more | DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-06-23 19:04:02 | Ready for Release | Processed in 2 working days. |
| 190 | AJN24 CONSTRUCTION | NCB-INFRA-QIMO-01-25, P7, ADRI... See more | AGLIPAY, QUIRINO | Rejected | 2025-06-23 19:19:21 | Returned to Applicant | Same Safety Officer and First... See more | |
| 191 | DOLE_RO2_2025-06-24_65_5LSU | AJN24 CONSTRUCTION | NCB-INFRA-QIMO-01-25, P7, ADRI... See more | AGLIPAY, QUIRINO | Approved | 2025-06-23 20:52:07 | Ready for Release | Processed in 1 working days. |
| 192 | J.A.M. Industrial Sales | Installation of SFO Tank | 327 Prenza Highway, Cauayan City, Isabela | Rejected | 2025-06-23 22:36:11 | Returned to Applicant | As per new DO 252 s 2025. For ... See more | |
| 193 | RJR'S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | IBULO,BAGGAO,CAGAYAN | Rejected | 2025-06-23 22:44:04 | Returned to Applicant | pls req. first aider id | |
| 194 | DOLE_RO2_2025-06-25_70_GY9R | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF CABULUAN SWI... See more | CABULUAN, ALCALA, CAGAYAN | Approved | 2025-06-23 23:18:59 | Ready for Release | Processed in 2 working days. |
| 195 | Municipality of Ramon, Isabela | UPGRADING OF LOCAL ACCESS ROAD... See more | Burgos, Ramon, Isabela | Rejected | 2025-06-23 23:27:03 | Returned to Applicant | Rochelle S. Redolozo (FA) must... See more | |
| 196 | DOLE_RO2_2025-06-25_71_FXWB | SHASHA'S CONSTRUCTION AND SUPPLIES | CONSTRUCTION OF SLF FACILITY (... See more | DALAOIG, ALCALA, CAGAYAN | Approved | 2025-06-23 23:51:13 | Ready for Release | Processed in 2 working days. |
| 197 | E.L. CHAN CONSTRUCTION AND DEVELOPMENT | RELOCATION of Metrobank-Maharl... See more | R4 Tower. Quezon St. Cauayan City, Isabela | Rejected | 2025-06-24 00:02:07 | Returned to Applicant | No NCII Scaffolding, NCII weld... See more | |
| 198 | RD BEDAÑA CONSTRUCTION AND SUPPLIES | STREET LIGHTING PROJECT ALONG ... See more | DADAP, LUNA, ISABELA | Rejected | 2025-06-24 00:49:24 | Returned to Applicant | One person is not allowed to s... See more | |
| 199 | TOP VISION DESIGN AND CONSTRUCTION SERVICES | REPAIR OF 6 CLASSROOMS AT ATUL... See more | ATULAYAN, TUGUEGARAO CITY | Rejected | 2025-06-24 00:50:27 | Returned to Applicant | NO ATTACHED CERTIFICATE FOR SC... See more | |
| 200 | DOLE_RO2_2025-07-01_74_U4XE | REKEAM CONSTRUCTION & SUPPLY | INSTALLATION OF SOLAR LIGHTS T... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-06-24 04:59:44 | Ready for Release | Processed in 6 working days. |
| 201 | D' BROTHERS INTERNATIONAL TRADING CORPORATION | INFRA-NCB-NVIMO-26-25, CONSTRU... See more | KAYAPA, NUEVA VIZCAYA | Rejected | 2025-06-24 05:08:17 | Returned to Applicant | Form not filled out properly. | |
| 202 | DOLE_RO2_2025-07-01_75_KPN7 | BENSON BUILDERS | CONSTRUCTION OF ROAD NETWORKS ... See more | BRGY. ANTUTOT, KASIBU, NUEVA VIZCAYA | Approved | 2025-06-24 05:13:39 | Ready for Release | Processed in 6 working days. |
| 203 | DOLE_RO2_2025-07-01_76_R2ZK | CAB CONSTRUCTION AND SUPPLY | CONCRETING OF BACLAS TO BILEN... See more | BRGY. SALINGSINGAN, AMBAGUIO, NUEVA VIZCAYA | Approved | 2025-06-24 05:20:10 | Ready for Release | Processed in 6 working days. |
| 204 | DOLE_RO2_2025-07-01_77_O8GB | BELANCE BUILDERS & TRADING | CONSTRUCTION OF MECHANICAL DR... See more | BRGY. CAPISAAN, KASIBU, NUEVA VIZCAYA | Approved | 2025-06-24 05:27:53 | Ready for Release | Processed in 6 working days. |
| 205 | AMBAGUIO BUILDERS | CONCRETING OF AWA TO MANGGA FA... See more | BRGY. POBLACION, AMBAGUIO, NUEVA VIZCAYA | Rejected | 2025-06-24 05:33:13 | Returned to Applicant | FA WITH EXISTING PROJECT TO SI... See more | |
| 206 | DOLE_RO2_2025-07-01_78_0N0S | D.A. CADELINA CONSTRUCTION | INFRA-NCB-NVIMO-17-25, PACKAGE... See more | VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-06-24 05:38:37 | Ready for Release | Processed in 6 working days. |
| 207 | DOLE_RO2_2025-07-01_79_V7IA | FIRST- OPTION BUILDERS' AND CONSTRUCTION SUPPLIES | IMPROVEMENT OF VILLA AURORA TO... See more | DIADI, NUEVA VIZCAYA | Approved | 2025-06-24 05:43:49 | Ready for Release | Processed in 6 working days. |
| 208 | DOLE_RO2_2025-07-01_80_YA2O | C.D.J. BUILDERS AND CONSTRUCTION SUPPLIES | INFRA-NCB-NVIMO-17-25, PACKAGE... See more | VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-06-24 05:47:28 | Ready for Release | Processed in 6 working days. |
| 209 | BY ADMIN/MR. & MRS. CESAR GATUS AND BELINDA B. GATUS | PROPOSED 7-UNIT TWO STOREY RES... See more | SAN FERMIN CAUAYAN CITY ISABELA | Rejected | 2025-06-24 18:14:11 | Returned to Applicant | BY ADMIN | |
| 210 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF STA.... See more | STA. ANA, CAGAYAN | Rejected | 2025-06-25 00:27:59 | Returned to Applicant | unsigned PCAB License, No NC2 ... See more | |
| 211 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF STA.... See more | STA. ANA, CAGAYAN | Rejected | 2025-06-25 00:29:29 | Returned to Applicant | unsigned PCAB License, No NC2 ... See more | |
| 212 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF MATI... See more | CAMALANIUGAN, CAGAYAN | Rejected | 2025-06-25 00:30:53 | Returned to Applicant | unsigned PCAB License, No NC2 ... See more | |
| 213 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF CAMA... See more | CAMALANIUGAN, CAGAYAN | Rejected | 2025-06-25 00:33:37 | Returned to Applicant | unsigned PCAB License, NO NC2 ... See more | |
| 214 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF CAMA... See more | CAMALANIUGAN, CAGAYAN | Rejected | 2025-06-25 00:39:07 | Returned to Applicant | PROJECT TOTAL COST IN THE APPL... See more | |
| 215 | DOLE_RO2_2025-07-01_81_GEBW | YZK BUILDERS | Construction of Central Nurser... See more | Tumauini Isabela | Approved | 2025-06-25 00:43:50 | Ready for Release | Processed in 5 working days. |
| 216 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF CENT... See more | CLAVERIA, CAGAYAN | Rejected | 2025-06-25 00:48:16 | Returned to Applicant | PROJECT COST IN THE CSHP APPLI... See more | |
| 217 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF STA.... See more | STA. ANA, CAGAYAN | Rejected | 2025-06-25 00:55:39 | Returned to Applicant | PROJECT COST IN THE CSHP APPLI... See more | |
| 218 | DOLE_RO2_2025-07-01_82_DSCP | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF STA.... See more | STA. ANA, CAGAYAN | Approved | 2025-06-25 00:56:29 | Ready for Release | Processed in 5 working days. |
| 219 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF MATI... See more | CAMALANIUGAN, CAGAYAN | Rejected | 2025-06-25 00:58:11 | Returned to Applicant | PROJECT COST IN THE CSHP APPLI... See more | |
| 220 | SAGADANIAN BUILDERS | CW-C-UCRIS-01-2025/UCRIS, MALL... See more | MALLIG, ISABELA | Rejected | 2025-06-25 01:35:21 | Returned to Applicant | 1.As per new DO 252 s 2025. Fo... See more | |
| 221 | DOLE_RO2_2025-07-01_83_SM31 | Radiance Solar Solutions Inc. | 65MW San Pablo Solar Power Pro... See more | Brgy. Annanuman San Pablo Isabela | Approved | 2025-06-25 01:57:53 | Ready for Release | Processed in 5 working days. |
| 222 | Radiance Solar Solutions Inc. | 65MW San Pablo Solar Power Pro... See more | Brgy. Annanuman San Pablo Isabela | Rejected | 2025-06-25 02:09:45 | Returned to Applicant | DUPLICATE | |
| 223 | D' BROTHERS INTERNATIONAL TRADING CORPORATION | INFRA-NCB-NVIMO-26-25, CONSTRU... See more | KAYAPA, NUEVA VIZCAYA | Rejected | 2025-06-25 04:52:16 | Returned to Applicant | DUPLICATE | |
| 224 | DOLE_RO2_2025-07-01_84_L6YH | JOVIC CONSTRUCTION & SUPPLY | RETROFITTING OF CAPPIT (PADUYA... See more | KASIBU, NUEVA VIZCAYA | Approved | 2025-06-25 04:56:28 | Ready for Release | Processed in 5 working days. |
| 225 | DOLE_RO2_2025-07-01_85_6H1I | E.H. MILIO CONSTRUCTION | IMPROVEMENT OF BATEC LOGPOND R... See more | KASIBU, NUEVA VIZCAYA | Approved | 2025-06-25 05:00:50 | Ready for Release | Processed in 5 working days. |
| 226 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF MATI... See more | CAMALANIUGAN, CAGAYAN | Rejected | 2025-06-25 17:32:07 | Returned to Applicant | PROJECT COST IN THE CSHP APPLI... See more | |
| 227 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF MATI... See more | CAMALANIUGAN, CAGAYAN | Rejected | 2025-06-25 17:36:28 | Returned to Applicant | UNSIGNED PCAB LICENSE, NO NC2 ... See more | |
| 228 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF CENT... See more | CLAVERIA, CAGAYAN | Rejected | 2025-06-25 17:37:36 | Returned to Applicant | UNSIGNED PCAB LICENSE, NO NC2 ... See more | |
| 229 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF NORT... See more | ABULUG, CAGAYAN | Rejected | 2025-06-25 17:41:24 | Returned to Applicant | UNSIGNED PCAB LICENSE, NO NC2 ... See more | |
| 230 | PAULINE CECILLE DIMSON / PROPOSED THREE STOREY STUDIO APARTMENT WITH RESIDENTIAL BUILDING | PROPOSED THREE STOREY STUDIO A... See more | SCORPIO ST. EXTENSION CONCUELO HEIGHTS, LEONARDA TUG. CITY | Rejected | 2025-06-25 18:22:07 | Returned to Applicant | SIMPLIFIED, WRONG RORM | |
| 231 | E.L. CHAN CONSTRUCTION AND DEVELOPMENT | RELOCATION of Metrobank-Maharl... See more | R4 Tower. Quezon St. Cauayan City, Isabela | Rejected | 2025-06-25 18:25:08 | Returned to Applicant | 1. CSHP template 6.1 not fille... See more | |
| 232 | DOLE_RO2_2025-07-01_86_CUMA | Radiance Solar Solutions Inc. | 65MW San Pablo Solar Power Pro... See more | Brgy. Annanuman San Pablo Isabela | Approved | 2025-06-25 18:58:07 | Ready for Release | Processed in 4 working days. |
| 233 | E.L. CHAN CONSTRUCTION AND DEVELOPMENT | RELOCATION of Metrobank-Maharl... See more | R4 Tower. Quezon St. Cauayan City, Isabela | Rejected | 2025-06-25 19:03:30 | Returned to Applicant | double entry | |
| 234 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF NORT... See more | ABULUG, CAGAYAN | Rejected | 2025-06-25 19:35:41 | Returned to Applicant | PROJECT COST IN THE CSHP APPLI... See more | |
| 235 | DOLE_RO2_2025-07-01_87_4FBS | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF PINI... See more | ABULUG, CAGAYAN | Approved | 2025-06-25 19:36:39 | Ready for Release | Processed in 4 working days. |
| 236 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF ABUL... See more | ABULUG, CAGAYAN | Rejected | 2025-06-25 19:37:44 | Returned to Applicant | UNSIGNED PCAB LICENSE | |
| 237 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF ABUL... See more | ABULUG, CAGAYAN | Rejected | 2025-06-25 19:38:49 | Returned to Applicant | UNSIGNED PCAB LICENSE | |
| 238 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF LAL-... See more | LAL-LO, CAGAYAN | Rejected | 2025-06-25 19:40:47 | Returned to Applicant | UNSIGNED PCAB LICENSE | |
| 239 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF ALLA... See more | ALLACAPAN, CAGAYAN | Rejected | 2025-06-25 19:41:56 | Returned to Applicant | UNSIGNED PCAB | |
| 240 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF LASA... See more | LASAM, CAGAYAN | Rejected | 2025-06-25 20:13:36 | Returned to Applicant | PROJECT NAME AND LOCATION NOT ... See more | |
| 241 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF SAN ... See more | SAN MATEO, ISABELA | Rejected | 2025-06-25 20:14:36 | Returned to Applicant | no signature of owner at upper... See more | |
| 242 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF LAPA... See more | CABATUAN, ISABELA | Rejected | 2025-06-25 20:15:40 | Returned to Applicant | No signature at the upper righ... See more | |
| 243 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF ROXA... See more | ROXAS, ISABELA | Rejected | 2025-06-25 20:16:38 | Returned to Applicant | no signature of the owner at P... See more | |
| 244 | AJN24 CONSTRUCTION | PB-CW-2025-007 - IMPROVEMENT ... See more | STO. TOMAS, MADDELA, QUIRINO | Rejected | 2025-06-25 22:14:25 | Returned to Applicant | 1. Application Form (please in... See more | |
| 245 | AJN24 CONSTRUCTION | PB-CW-2025-008 - IMPROVEMENT ... See more | VILLA AGULLANA, MADDELA, QUIRINO | Rejected | 2025-06-25 22:19:37 | Returned to Applicant | 1. NO Application Form Attache... See more | |
| 246 | ARSD CONSTRUCTION CORPORATION | Proposed SPUP 4 Storey Parking... See more | SPUP Mabini St. Tuguegarao City | Rejected | 2025-06-25 23:05:09 | Returned to Applicant | Under DO 252, Series of 2025, ... See more | |
| 247 | ARSD CONSTRUCTION CORPORATION | Proposed SPUP 5 Storey Dormito... See more | SPUP Mabini St. Tuguegarao City | Rejected | 2025-06-25 23:08:39 | Returned to Applicant | unsigned contractor (template) | |
| 248 | AJN24 CONSTRUCTION | PB-CW-2025-007 - IMPROVEMENT ... See more | STO. TOMAS, MADDELA, QUIRINO | Rejected | 2025-06-25 23:15:55 | Returned to Applicant | FINISH PROJECT | |
| 249 | DOLE_RO2_2025-06-27_73_PV0N | AJN24 CONSTRUCTION | PB-CW-2025-008 - IMPROVEMENT ... See more | VILLA AGULLANA, MADDELA, QUIRINO | Approved | 2025-06-26 01:02:13 | Ready for Release | Processed in 2 working days. |
| 250 | DOLE_RO2_2025-07-02_98_0M7V | YZK BUILDERS | Construction of Guard House at... See more | Tumauini Isabela | Approved | 2025-06-26 00:09:19 | Ready for Release | Processed in 5 working days. |
| 251 | WILLIE'S CONSTRUCTION | CONSTRUCTION OF 4'' CHB CANAL ... See more | ARITAO, NUEVA VIZCAYA | Rejected | 2025-06-26 00:46:13 | Returned to Applicant | FA WITH EXISTING PROJECT TO BE... See more | |
| 252 | MC Geometric Proportions, Inc. | Package 25-14: City Sports Com... See more | Baluarte, Santiago City | Rejected | 2025-06-26 18:53:47 | Returned to Applicant | Tagged as finished project | |
| 253 | DOLE_RO2_2025-07-01_88_UEQG | A.P BOISER CONSTRUCTION AND SUPPLY | Narrow Base Tower (NBT) Height... See more | PH020051-Brgy. Bilibigao, Claveria, Cagayan | Approved | 2025-06-26 19:14:50 | Ready for Release | Processed in 3 working days. |
| 254 | CAPITAL CONSTRUCTION | Contract No. 2024-DII-RNIS-SAN... See more | SAN MATEO, ISABELA | Rejected | 2025-06-26 19:38:31 | Returned to Applicant | only pcab document is attached | |
| 255 | JKA-Ver Construction and Engineering Services | FTAP-GLOBE ROLLOUT PROJECT | PUROK 4, BRGY. BACKILING, APPARI CAGAYAN | Rejected | 2025-06-26 21:35:06 | Returned to Applicant | INCOMPLETE ATTACHEDMENT | |
| 256 | DOLE_RO2_2025-07-01_89_SYPL | DRAGON HATCHED CONSTRUCTION | CONSTRUCTION OF NEW ILAGAN CIT... See more | BRGY. ALIBAGU, CITY OF ILAGAN , ISABELA | Approved | 2025-06-26 23:25:24 | Ready for Release | Processed in 3 working days. |
| 257 | DOLE_RO2_2025-07-01_90_FQL2 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF STA.... See more | STA. ANA, CAGAYAN | Approved | 2025-06-26 23:35:54 | Ready for Release | Processed in 3 working days. |
| 258 | DOLE_RO2_2025-07-02_99_FWQA | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF STA.... See more | STA. ANA, CAGAYAN | Approved | 2025-06-26 23:36:41 | Ready for Release | Processed in 4 working days. |
| 259 | DOLE_RO2_2025-07-01_91_QKN9 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF MATI... See more | CAMALANIUGAN, CAGAYAN | Approved | 2025-06-26 23:38:29 | Ready for Release | Processed in 3 working days. |
| 260 | DOLE_RO2_2025-07-01_92_8L59 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF CAMA... See more | CAMALANIUGAN, CAGAYAN | Approved | 2025-06-26 23:42:19 | Ready for Release | Processed in 3 working days. |
| 261 | DOLE_RO2_2025-07-01_93_JMTC | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF CENT... See more | CLAVERIA, CAGAYAN | Approved | 2025-06-26 23:43:03 | Ready for Release | Processed in 3 working days. |
| 262 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF NORT... See more | ABULUG, CAGAYAN | Rejected | 2025-06-26 23:44:07 | Returned to Applicant | PROJECT COST IN THE CSHP APPLI... See more | |
| 263 | DOLE_RO2_2025-07-02_100_R1OA | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF PINI... See more | ABULUG, CAGAYAN | Approved | 2025-06-26 23:45:40 | Ready for Release | Processed in 4 working days. |
| 264 | DOLE_RO2_2025-07-01_94_0V4N | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF ABUL... See more | ABULUG, CAGAYAN | Approved | 2025-06-26 23:46:19 | Ready for Release | Processed in 3 working days. |
| 265 | DOLE_RO2_2025-07-01_95_ZSN4 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF ABUL... See more | ABULUG, CAGAYAN | Approved | 2025-06-26 23:50:02 | Ready for Release | Processed in 3 working days. |
| 266 | DOLE_RO2_2025-07-02_101_JBW9 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF LAL-... See more | LAL-LO, CAGAYAN | Approved | 2025-06-26 23:50:53 | Ready for Release | Processed in 4 working days. |
| 267 | DOLE_RO2_2025-07-02_102_IEF3 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF ALLA... See more | ALLACAPAN, CAGAYAN | Approved | 2025-06-26 23:53:54 | Ready for Release | Processed in 4 working days. |
| 268 | DOLE_RO2_2025-07-01_96_KP0U | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF LASA... See more | LASAM, CAGAYAN | Approved | 2025-06-26 23:55:05 | Ready for Release | Processed in 3 working days. |
| 269 | MC Geometric Proportions, Inc. | Package 25-14: City Sports Com... See more | Baluarte, Santiago City | Rejected | 2025-06-29 18:10:13 | Returned to Applicant | double entry ID NO. 409 | |
| 270 | RJR’S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | STA. CARUPIAN,BAGGAO,CAGAYAN | Rejected | 2025-06-29 19:29:27 | Returned to Applicant | EXPIRED CHE TESTING EQUIPMENT | |
| 271 | RDJD CONSTRUCTION | CONCRETING OF NARURON ROAD(BIT... See more | BITNONG, DUPAX DEL SUR, NUEVA VIZCYA | Rejected | 2025-06-29 20:10:46 | Returned to Applicant | DUPLICATE | |
| 272 | RTC CONSTRUCTION | CONSTRUCTION OF PERIMETER FENC... See more | LALLO, CAGAYAN | Rejected | 2025-06-29 20:27:04 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 273 | RTC CONSTRUCTION | CONSTRUCTION OF PERIMETER FENC... See more | LALLO, CAGAYAN | Rejected | 2025-06-29 20:50:30 | Returned to Applicant | 1. UNSIGNED FIRST PAGE OF TEMP... See more | |
| 274 | JHUERS CONSTRUCTION | LGU-DIADI BAC 2025-05-CONSTRUC... See more | ESCOTING, DIADI, NUEVA VIZCAYA | Rejected | 2025-06-29 21:15:37 | Returned to Applicant | CHE EXPIRED, CSHP TEMPLATE NOT... See more | |
| 275 | RTC CONSTRUCTION | CONSTRUCTION OF PERIMETER FENC... See more | LALLO, CAGAYAN | Rejected | 2025-06-29 21:18:45 | Returned to Applicant | DUPLICATE | |
| 276 | DOLE_RO2_2025-07-01_97_LINH | SAGADANIAN BUILDERS | CW-C-UCRIS-01-2025/UCRIS, MALL... See more | MALLIG, ISABELA | Approved | 2025-06-29 22:34:25 | Ready for Release | Processed in 1 working days. |
| 277 | DOUBLE-D CONSTRUCTION | CONSTRUCTION OF 3 CLASSROOMS, ... See more | LINAO ELEMENTARY SCHOOL, TUGUEGARAO CITY | Rejected | 2025-06-30 01:03:15 | Returned to Applicant | NO ATTACHED NC2 OPERATOR FOR M... See more | |
| 278 | JHUERS CONSTRUCTION | 8000-000-3-1-10-007-006-009-CO... See more | BARANGAY STA. MARIA, DUPAX DEL SUR, NUEVA VIZCAYA | Rejected | 2025-06-30 01:20:36 | Returned to Applicant | CHE EXPIRED, CSHP TEMPLATE NOT... See more | |
| 279 | JHUERS CONSTRUCTION | 8000-000-3-1-10-007-006-009-CO... See more | BARANGAY STA. MARIA, DUPAX DEL SUR, NUEVA VIZCAYA | Rejected | 2025-06-30 01:20:45 | Returned to Applicant | DUPLICATE | |
| 280 | DOLE_RO2_2025-07-02_103_79R3 | ROMSON CONSTRUCTION & SUPPLIES | CONSTRUCTION OF MULTIPURPOSE H... See more | DINE, KASIBU, NUEVA VIZCAYA | Approved | 2025-06-30 01:59:25 | Ready for Release | Processed in 3 working days. |
| 281 | JHUERS CONSTRUCTION | PB-CW-2025-051 COMPLETION / UP... See more | GREGORIO PIMENTEL, DIFFUN, QUIRINO | Rejected | 2025-06-30 17:45:23 | Returned to Applicant | Double Entry | |
| 282 | DOLE_RO2_2025-07-02_104_HR2O | JHUERS CONSTRUCTION | PB-CW-2025-049 COMPLETION / UP... See more | GURIBANG, DIFFUN, QUIRINO | Approved | 2025-06-30 17:57:35 | Ready for Release | Processed in 2 working days. |
| 283 | DOLE_RO2_2025-07-02_105_E9PG | ARSD CONSTRUCTION CORPORATION | Proposed SPUP 4 Storey Parking... See more | SPUP Mabini St. Tuguegarao City | Approved | 2025-06-30 18:16:00 | Ready for Release | Processed in 2 working days. |
| 284 | DOLE_RO2_2025-07-02_106_PRGJ | ARSD CONSTRUCTION CORPORATION | Proposed SPUP 5 Storey Dormito... See more | SPUP Mabini St. Tuguegarao City | Approved | 2025-06-30 18:19:59 | Ready for Release | Processed in 2 working days. |
| 285 | MA TESORO CONSTRUCTION | INFRA 25-10-30-PACKAGE 25-30: ... See more | SANTIAGO CITY,ISABELA | Rejected | 2025-06-30 18:33:00 | Returned to Applicant | the uploaded documents are NCI... See more | |
| 286 | MA TESORO CONSTRUCTION | INFRA 25-10-31-PACKAGE 25-31: ... See more | SANTIAGO CITY,ISABELA | Rejected | 2025-06-30 18:51:29 | Returned to Applicant | the uploaded documents are NCI... See more | |
| 287 | JKA-Ver Construction and Engineering Services | FTAP-GLOBE ROLLOUT PROJECT | PUROK 4, BRGY. BACKILING, APPARI CAGAYAN | Rejected | 2025-06-30 19:18:00 | Returned to Applicant | a. unsigned PCAB License b.... See more | |
| 288 | JHUERS CONSTRUCTION | PB-CW-2025-051 COMPLETION / UP... See more | GREGORIO PIMENTEL, DIFFUN, QUIRINO | Rejected | 2025-06-30 21:25:50 | Returned to Applicant | Safety Officer Michael Bucahan... See more | |
| 289 | JHUERS CONSTRUCTION | PB-CW-2025-33 CONSTRUCTION/ CO... See more | GURIBANG, DIFFUN, QUIRINO | Rejected | 2025-06-30 21:29:21 | Returned to Applicant | 1. No attached COSH certificat... See more | |
| 290 | DOLE_RO2_2025-07-02_107_NAHF | D' BROTHERS INTERNATIONAL TRADING CORPORATION | NCB-INFRA-QIMO-02-25, P2,QUIRI... See more | QUIRINO | Approved | 2025-06-30 21:55:51 | Ready for Release | Processed in 2 working days. |
| 291 | JHUERS CONSTRUCTION | NCB-INFRA-QIMO-01-25, P1 ADRIS... See more | AGLIPAY, QUIRINO | Rejected | 2025-06-30 21:58:53 | Returned to Applicant | SO with on-going project | |
| 292 | DOLE_RO2_2025-07-03_108_6CUS | D' BROTHERS INTERNATIONAL TRADING CORPORATION | NCB-INFRA-QIMO-02-25, P1,QUIRI... See more | QUIRINO | Approved | 2025-06-30 22:01:29 | Ready for Release | Processed in 3 working days. |
| 293 | G.M. PAJARILLAGA CONSTRUCTION & SUPPLY | INFRA-NCB-NVIMO-17-25, PACKAGE... See more | VILLAVERDE, NUEVA VIZCAYA | Rejected | 2025-06-30 22:07:42 | Returned to Applicant | Attach a copy of the company e... See more | |
| 294 | JHUERS CONSTRUCTION | NCB-INFRA-QIMO-03-25 CABUGBUGA... See more | CABARROGUIS, QUIRINO | Rejected | 2025-06-30 22:37:48 | Returned to Applicant | 1.Certificate of Testing and I... See more | |
| 295 | Harmonic System Incorporated | Limbauan Solar Power Plant | Limbauan, San Pablo, Isabela | Rejected | 2025-07-01 00:22:38 | Returned to Applicant | 1. No attached CSHP Program Te... See more | |
| 296 | CAPITAL CONSTRUCTION | Contract No. 2024-DII-RNIS-SAN... See more | SAN MATEO, ISABELA | Rejected | 2025-07-01 16:52:14 | Returned to Applicant | Under DO 252, Series of 2025, ... See more | |
| 297 | DOLE_RO2_2025-07-04_110_7ZCH | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED TELEC... See more | PUROK 1 BRGY STA LUCIA, BAGABAG, NUEVA VIZCAYA | Approved | 2025-07-01 20:05:12 | Ready for Release | Processed in 3 working days. |
| 298 | YSIDRA CONSTRUCTION INC. | Construction of 1 Unit Classro... See more | Hacienda Intal, Baggao, Cagayan | Rejected | 2025-07-01 22:35:10 | Returned to Applicant | NO NCII CERTIFICATE FOR WELDER... See more | |
| 299 | JHUERS CONSTRUCTION | NCB-INFRA-QIMO-03-25 CABUGBUGA... See more | CABARROGUIS, QUIRINO | Rejected | 2025-07-01 22:35:49 | Returned to Applicant | (DOUBLE ENTRY) You have subm... See more | |
| 300 | JHUERS CONSTRUCTION | NCB-INFRA-QIMO-01-25, P1 ADRIS... See more | AGLIPAY, QUIRINO | Rejected | 2025-07-01 22:40:48 | Returned to Applicant | Safety Officer Mr. MICHAEL ADA... See more | |
| 301 | DOLE_RO2_2025-07-10_114_6L9U | SL Development Construction Corp | REMAINING WORKS FOR THE TUGUEG... See more | Tuguegarao City, Cagayan Province | Approved | 2025-07-01 23:03:52 | Ready for Release | Processed in 7 working days. |
| 302 | WILLIE'S CONSTRUCTION | CONSTRUCTION OF 4'' CHB CANAL ... See more | ARITAO, NUEVA VIZCAYA | Rejected | 2025-07-01 23:33:09 | Returned to Applicant | NO COE OF FIRST AIDER | |
| 303 | DOLE_RO2_2025-07-04_111_QQCG | D' BROTHERS INTERNATIONAL TRADING CORPORATION | INFRA-NCB-NVIMO-26-25, CONSTRU... See more | KAYAPA, NUEVA VIZCAYA | Approved | 2025-07-02 00:03:06 | Ready for Release | Processed in 3 working days. |
| 304 | DOLE_RO2_2025-07-04_112_B77L | AMBAGUIO BUILDERS | CONCRETING OF AWA TO MANGGA FA... See more | BRGY. POBLACION, AMBAGUIO, NUEVA VIZCAYA | Approved | 2025-07-02 00:07:51 | Ready for Release | Processed in 3 working days. |
| 305 | 3JMS CONSTRUCTION | REHABILITATION OF ROAD ALONG S... See more | SORIANO ST., PALLUA SUR, TUGUEGARAO CITY, CAGAYAN | Rejected | 2025-07-02 18:24:49 | Returned to Applicant | TOTAL PROJECT COST NOT SAME IN... See more | |
| 306 | DOLE_RO2_2025-07-10_115_O9UY | 3JMS CONSTRUCTION | REHABILITATION OF ROAD ALONG Z... See more | LARION BAJO, TUGUEGARAO CITY, CAGAYAN | Approved | 2025-07-02 18:29:47 | Ready for Release | Processed in 6 working days. |
| 307 | DOLE_RO2_2025-07-10_116_CZFX | 3JMS CONSTRUCTION | CONSTRUCTION OF MASONRY DRAINA... See more | SUNKIST STREET PENGUE-RUYU, TUGUEGARAO CITY, CAGAYAN | Approved | 2025-07-02 18:34:39 | Ready for Release | Processed in 6 working days. |
| 308 | WILLIE'S CONSTRUCTION | CONSTRUCTION OF 4'' CHB CANAL ... See more | ARITAO, NUEVA VIZCAYA | Rejected | 2025-07-02 18:43:50 | Returned to Applicant | CSHP Application & Program... See more | |
| 309 | DOLE_RO2_2025-07-10_117_MUAW | RAMIKE CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | PASSING, LASAM, CAGAYAN | Approved | 2025-07-02 19:20:18 | Ready for Release | Processed in 6 working days. |
| 310 | DOLE_RO2_2025-07-10_118_7T0U | CJTPASCUAL CONSTRUCTION | DEVELOPMENT OF LASAM PUBLIC CE... See more | CENTRO 03, LASAM, CAGAYAN | Approved | 2025-07-02 19:55:31 | Ready for Release | Processed in 6 working days. |
| 311 | DOLE_RO2_2025-07-10_119_D0WW | CJTPASCUAL CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | NEW ORLINS, LASAM, CAGAYAN | Approved | 2025-07-03 11:22:12 | Ready for Release | Processed in 5 working days. |
| 312 | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-45m, 24sqm, 320kph, 150D k... See more | Benito Soliven, Isabela | Rejected | 2025-07-03 11:27:48 | Returned to Applicant | RE-SUBMISSION NEEDED. INCOMPLE... See more | |
| 313 | DOLE_RO2_2025-07-10_120_LYA3 | YSIDRA CONSTRUCTION INC. | Construction of 1 Unit Classro... See more | Hacienda Intal, Baggao, Cagayan | Approved | 2025-07-03 11:39:07 | Ready for Release | Processed in 5 working days. |
| 314 | D'Limitless Civil Engineering Construction | Proposed Construction of Two (... See more | Brgy. Ambalatungan, Santiago City Isabela | Rejected | 2025-07-03 13:25:42 | Returned to Applicant | Under DO 252, Series of 2025, ... See more | |
| 315 | DOLE_RO2_2025-07-03_109_QA8A | D'Limitless Civil Engineering Construction | Proposed Construction of Two (... See more | Brgy. Ambalatungan, Santiago City Isabela | Approved | 2025-07-03 14:36:53 | Ready for Release | Processed in 1 working days. |
| 316 | DOLE_RO2_2025-07-11_131_XH1K | ARNOLD AND DOMINADOR CONSTRUCTION SERVICES | CONSTRUCTION OF HAZARDOUS WAST... See more | BAGABAG, NUEVA VIZCAYA | Approved | 2025-07-03 14:50:10 | Ready for Release | Processed in 6 working days. |
| 317 | ARNOLD AND DOMINADOR CONSTRUCTION SERVICES | REPAIR AND IMPROVEMENT OF P.I.... See more | BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-07-03 14:55:07 | Returned to Applicant | FINISHED PROJECT | |
| 318 | DOLE_RO2_2025-07-11_132_7ABC | ARNOLD AND DOMINADOR CONSTRUCTION SERVICES | COMPLETION OF HAZARDOUS WASTE ... See more | BAMBANG, NUEVA VIZCAYA | Approved | 2025-07-03 14:58:41 | Ready for Release | Processed in 6 working days. |
| 319 | ATLANTIC CONSTRUCTION | repair/rehabilitation of canan... See more | cabatuan, isabela | Rejected | 2025-07-03 15:01:42 | Returned to Applicant | ISABELA PROJECT | |
| 320 | ARNOLD AND DOMINADOR CONSTRUCTION SERVICES | REPAIR AND MAINTENANCE OF PPDO... See more | BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-07-03 15:02:09 | Returned to Applicant | FINISHED PROJECT | |
| 321 | DOLE_RO2_2025-07-11_133_1CUX | ARNOLD AND DOMINADOR CONSTRUCTION SERVICES | REPAIR AND MAINTENANCE OF TIBL... See more | AMBAGUIO, NUEVA VIZCAYA | Approved | 2025-07-03 15:06:09 | Ready for Release | Processed in 6 working days. |
| 322 | J.A.M. Industrial Sales | Installation of SFO Tank | 327 Prenza Highway, Cauayan City, Isabela | Rejected | 2025-07-03 15:32:28 | Returned to Applicant | NO SIGNATURE OF SAFETY OFFICER... See more | |
| 323 | DOLE_RO2_2025-07-11_134_02RT | ARNOLD AND DOMINADOR CONSTRUCTION SERVICES | COMPLETION OF HAZARDOUS WASTE ... See more | DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-07-03 15:46:40 | Ready for Release | Processed in 6 working days. |
| 324 | DOLE_RO2_2025-07-10_121_PD9M | JHUERS CONSTRUCTION | NCB-INFRA-QIMO-01-25, P1- ADRI... See more | AGLIPAY, QUIRINO | Approved | 2025-07-03 18:03:02 | Ready for Release | Processed in 5 working days. |
| 325 | JHUERS CONSTRUCTION | PB-CW-2025-33 CONSTRUCTION/ CO... See more | GURIBANG, DIFFUN, QUIRINO | Rejected | 2025-07-03 18:06:58 | Returned to Applicant | Certificate of Testing Backhoe... See more | |
| 326 | DOLE_RO2_2025-07-06_114_VL0Y | JHUERS CONSTRUCTION | PB-CW-2025-051 COMPLETION/ UPG... See more | GREGORIO PIMENTEL, DIFFUN, QUIRINO | Approved | 2025-07-03 18:11:12 | Ready for Release | Processed in 2 working days. |
| 327 | JHUERS CONSTRUCTION | NCB-INFRA-QIMO-03-25- CABUGBUG... See more | CABARROGUIS, QUIRINO | Rejected | 2025-07-03 19:09:20 | Returned to Applicant | Certificate of Testing of Back... See more | |
| 328 | MIZRACH'S CONSTRUCTION SERVICES | CONSTRUCTION OF STONE MASONRY ... See more | Guinalbin, Aglipay, Quirino | Rejected | 2025-07-04 12:08:32 | Returned to Applicant | No attached File | |
| 329 | DOLE_RO2_2025-07-10_122_OJAK | DOUBLE-D CONSTRUCTION | CONSTRUCTION OF 3 CLASSROOMS, ... See more | LINAO ELEMENTARY SCHOOL, TUGUEGARAO CITY | Approved | 2025-07-04 13:42:38 | Ready for Release | Processed in 4 working days. |
| 330 | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-45m, 24sqm, 320kph, 150D k... See more | Benito Soliven, Isabela | Rejected | 2025-07-04 14:08:47 | Returned to Applicant | LETTER OF INTENT AND COE MUST ... See more | |
| 331 | DOLE_RO2_2025-07-11_135_5ZDB | MNL Inc. | Construction of Self Supportin... See more | Brgy. Imelda Bliss Village, Ilagan City, Isabela | Approved | 2025-07-04 15:54:17 | Ready for Release | Processed in 5 working days. |
| 332 | JURIS CONSTRUCTION & BUILDERS | PB-CW-2025-022-Improvement/Con... See more | Dumabato Sur, Maddela, Quirino | Rejected | 2025-07-05 12:35:08 | Returned to Applicant | FINISHED PROJECT | |
| 333 | DOLE_RO2_2025-07-10_123_9OTM | JIJOMER CONSTRUCTION | Repair / Rehab. of Ramon Birth... See more | Isabela | Approved | 2025-07-07 07:44:01 | Ready for Release | Processed in 4 working days. |
| 334 | DOLE_RO2_2025-07-10_124_YJ6G | JIJOMER CONSTRUCTION | Repair / Rehab. of San Isidro ... See more | Isabela | Approved | 2025-07-07 07:48:56 | Ready for Release | Processed in 4 working days. |
| 335 | DOLE_RO2_2025-07-10_125_XQS5 | JIJOMER CONSTRUCTION | Repair / Rehab. of San Isidro ... See more | Isabela | Approved | 2025-07-07 08:24:58 | Ready for Release | Processed in 4 working days. |
| 336 | A-Czar18 Construction | Repair/Improvement of Aglipay ... See more | Villa Ventura, Aglipay, Quirino | Rejected | 2025-07-07 10:27:09 | Returned to Applicant | No COSH Certificate of Umbania... See more | |
| 337 | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-50m, 24sqm, 320kph, 150D k... See more | San Agustin, Isabela | Rejected | 2025-07-07 11:57:02 | Returned to Applicant | CSHP NOT DULY FILLED OUT (1.0 ... See more | |
| 338 | ATLANTIC CONSTRUCTION | resealing of runway cracks and... See more | tuguegarao city, cagayan | Rejected | 2025-07-07 14:19:55 | Returned to Applicant | Under DO 252, Series of 2025, ... See more | |
| 339 | JKA-Ver Construction and Engineering Services | FTAP-GLOBE ROLLOUT PROJECT | PUROK 4, BRGY. BACKILING, APPARI CAGAYAN | Rejected | 2025-07-07 15:22:46 | Returned to Applicant | NO SIGNATURE OF NAME OF CONTRA... See more | |
| 340 | RSL BUILDERS CORPORATION | PH020215 | BRGY. MASIPI WEST, CABAGAN, ISABELA | Rejected | 2025-07-07 15:37:28 | Returned to Applicant | NO CHE TESTING CERT/CHE OPERAT... See more | |
| 341 | RSL BUILDERS CORPORATION | PH020226 | Purok 3 Brgy. Bagu, Pamplona, Cagayan | Rejected | 2025-07-07 15:42:26 | Returned to Applicant | NO SIGNATURE OF CONTRACTOR IN ... See more | |
| 342 | ACES 3 CONSTRUCTION | PB-CW-2025-045-Reconstruction ... See more | Ricarte Sur, Diffun, Quirino | Rejected | 2025-07-07 16:51:15 | Returned to Applicant | Require NCII for electrical, w... See more | |
| 343 | DOLE_RO2_2025-07-10_126_XILX | ACES 3 CONSTRUCTION | PB-CW-2025-046 | Magsaysay,Diffun,Quirino | Approved | 2025-07-07 16:57:04 | Ready for Release | Processed in 3 working days. |
| 344 | RJR'S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | CARUPIAN , BAGGAO, CAGAYAN | Rejected | 2025-07-08 09:41:01 | Returned to Applicant | FILL OUT PROPERLY THE CSHP APP... See more | |
| 345 | RJR'S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | IBULO , BAGGAO, CAGAYAN | Rejected | 2025-07-08 09:44:05 | Returned to Applicant | FILL OUT PROPERLY THE CSHP APP... See more | |
| 346 | RJR'S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | SANTA MARGARITA,BAGGAO,CAGAYAN | Rejected | 2025-07-08 09:45:42 | Returned to Applicant | FILL OUT PROPERLY THE CSHP APP... See more | |
| 347 | DOLE_RO2_2025-07-11_136_2H4M | SIFU J BUILDERS CORPORATION | Widening Farm to Market Road P... See more | Brgy. Tukod, Kasibu, Nueva Vizcaya | Approved | 2025-07-08 10:46:39 | Ready for Release | Processed in 4 working days. |
| 348 | DOLE_RO2_2025-07-11_137_XZ84 | WILLIE'S CONSTRUCTION | CONSTRUCTION OF 4'' CHB CANAL ... See more | ARITAO, NUEVA VIZCAYA | Approved | 2025-07-08 11:31:47 | Ready for Release | Processed in 3 working days. |
| 349 | 3JMS COSNTRUCTION | REHABILITATION OF ROAD ALONG S... See more | SORIANO STREET, PALLUA SUR, TUGUEGARAO CITY | Rejected | 2025-07-08 13:14:23 | Returned to Applicant | 1. FIRST AIDER SHOULD BE A 4-D... See more | |
| 350 | DOLE_RO2_2025-07-10_127_BID0 | D.A CADELIÑA CONSTRUCTION | INFRA-NCB-NVIMO-30-25 CONSTRUC... See more | BAGABAG, NUEVA VIZCAYA | Approved | 2025-07-08 13:38:43 | Ready for Release | Processed in 2 working days. |
| 351 | DOLE_RO2_2025-07-10_128_A50T | HORIVER CONSTRUCTION | IMPROVEMENT OF BASEMENT OF TUG... See more | Carig Sur, Tuguegarao City | Approved | 2025-07-08 13:53:44 | Ready for Release | Processed in 2 working days. |
| 352 | Branics Construction Services | Concreting of Verona Digitel R... See more | Verona, Didipio, Kasibu, Nueva Vizcaya | Rejected | 2025-07-08 16:11:55 | Returned to Applicant | 1. Provide for the Lease Agree... See more | |
| 353 | DOLE_RO2_2025-07-11_138_MVAS | Aligwa Construction Services | Improvement of Irrigation Cana... See more | Didipio, Kasibu, Nueva Vizcaya | Approved | 2025-07-08 16:17:46 | Ready for Release | Processed in 3 working days. |
| 354 | RD BEDAÑA CONSTRUCTION AND SUPPLIES | STREET LIGHTING PROJECT ALONG ... See more | DADAP, LUNA, ISABELA | Rejected | 2025-07-08 16:42:03 | Returned to Applicant | FINISHED PROJECT (JULY 10, 202... See more | |
| 355 | DOLE_RO2_2025-07-11_139_J7XM | RJR'S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | ALBA,BAGGAO,CAGAYAN | Approved | 2025-07-08 16:48:17 | Ready for Release | Processed in 3 working days. |
| 356 | DOLE_RO2_2025-07-10_129_A2IL | JHUERS CONSTRUCTION | PB-CW-2025-024 (RE-ADVERTISED)... See more | STO.NIÑO, MADDELA, QUIRINO | Approved | 2025-07-08 16:50:34 | Ready for Release | Processed in 2 working days. |
| 357 | DOLE_RO2_2025-07-11_140_70RR | V.S. LAUNGAYAN HARDWARE AND CONSTRUCTION SUPPLY | IB 2025-02-04(01) - INFRASTRUC... See more | Pamplona, Cagayan | Approved | 2025-07-09 08:26:27 | Ready for Release | Processed in 3 working days. |
| 358 | DOLE_RO2_2025-07-11_141_N3Y8 | V.S. LAUNGAYAN HARDWARE AND CONSTRUCTION SUPPLY | IB 2025-02-04(01) - INFRASTRUC... See more | Libertad, Abulug, Cadayan | Approved | 2025-07-09 08:40:09 | Ready for Release | Processed in 3 working days. |
| 359 | Municipality of Aglipay, Quirino | CONSTRUCTION OF STONE MASONRY ... See more | Guinalbin, Aglipay, Quirino | Rejected | 2025-07-09 10:02:54 | Returned to Applicant | NCII Certificate of Mr. Bayana... See more | |
| 360 | DOLE_RO2_2025-07-11_142_FRC0 | RJR'S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | AGAMAN SUR, BAGGAO, CAGAYAN | Approved | 2025-07-09 11:07:19 | Ready for Release | Processed in 3 working days. |
| 361 | DOLE_RO2_2025-07-11_143_11T7 | RJR'S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | BITAG GRANDE , BAGGAO, CAGAYAN | Approved | 2025-07-09 11:09:46 | Ready for Release | Processed in 3 working days. |
| 362 | DOLE_RO2_2025-07-11_144_NICJ | RJR'S CONSTRUCTION | CONSTRUCTION/COMPLETION OF DRI... See more | TALLANG,BAGGAO,CAGAYAN | Approved | 2025-07-09 11:18:05 | Ready for Release | Processed in 2 working days. |
| 363 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF NORT... See more | ABULUG, CAGAYAN | Rejected | 2025-07-09 11:44:39 | Returned to Applicant | Total project cost did not mat... See more | |
| 364 | DOLE_RO2_2025-07-10_130_5829 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF NORT... See more | ABULUG, CAGAYAN | Approved | 2025-07-09 11:58:44 | Ready for Release | Processed in 1 working days. |
| 365 | DOLE_RO2_2025-07-11_145_JSR2 | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF LAPA... See more | CABATUAN, ISABELA | Approved | 2025-07-09 13:30:08 | Ready for Release | Processed in 2 working days. |
| 366 | DOLE_RO2_2025-07-11_146_2IWL | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF ROXA... See more | ROXAS, ISABELA | Approved | 2025-07-09 13:31:21 | Ready for Release | Processed in 2 working days. |
| 367 | DOLE_RO2_2025-07-11_147_6CQW | BIFESA CONSTRUCTION | REPAIR/ REHABILITATION OF SAN ... See more | SAN MATEO, ISABELA | Approved | 2025-07-09 13:32:30 | Ready for Release | Processed in 2 working days. |
| 368 | DOLE_RO2_2025-07-14_153_OUVW | JHUERS CONSTRUCTION | PB-CW-2025-33 CONSTRUCTION/ CO... See more | GURIBANG, DIFFUN, QUIRINO | Approved | 2025-07-09 16:20:58 | Ready for Release | Processed in 3 working days. |
| 369 | JHUERS CONSTRUCTION | PB-CW-2025-023 (RE- ADVERTISED... See more | PEDLISAN, MADDELA, QUIRINO | Rejected | 2025-07-09 16:26:05 | Returned to Applicant | Unsigned application form | |
| 370 | DOLE_RO2_2025-07-14_154_TO6R | JHUERS CONSTRUCTION | NCB-INFRA-QIMO-01-25, P1- ADRI... See more | AGLIPAY, QUIRINO | Approved | 2025-07-09 16:30:14 | Ready for Release | Processed in 3 working days. |
| 371 | DOLE_RO2_2025-07-14_155_AG76 | JHUERS CONSTRUCTION | PB-CW-2025-060 RENOVATION OF C... See more | CAPITOL HILLS, CABARROGUIS, QUIRINO | Approved | 2025-07-09 16:36:34 | Ready for Release | Processed in 3 working days. |
| 372 | DOLE_RO2_2025-07-16_163_WBIP | JHUERS CONSTRUCTION | PB-CW-2025-042 CONSTRUCTION OF... See more | SAN SALVADOR, MADDELA, QUIRINO | Approved | 2025-07-09 16:48:47 | Ready for Release | Processed in 5 working days. |
| 373 | DOLE_RO2_2025-07-16_164_ETVN | JHUERS CONSTRUCTION | NCB-INFRA-QIMO-03-25- CABUGBUG... See more | CABARROGUIS, QUIRINO | Approved | 2025-07-09 16:53:10 | Ready for Release | Processed in 5 working days. |
| 374 | DOLE_RO2_2025-07-16_165_CALL | JHUERS CONSTRUCTION | PB-CW-2025-031 CONSTRUCTION/ C... See more | PROGRESO, AGLIPAY, QUIRINO | Approved | 2025-07-09 17:04:07 | Ready for Release | Processed in 5 working days. |
| 375 | DOLE_RO2_2025-07-16_166_R5K1 | JHUERS CONSTRUCTION | LGU-DIADI BAC 2025-05-CONSTRUC... See more | DIADI, NUEVA VIZCAYA | Approved | 2025-07-10 09:13:32 | Ready for Release | Processed in 4 working days. |
| 376 | DOLE_RO2_2025-07-16_167_PUM3 | JHUERS CONSTRUCTION | 8000-000-3-1-10-007-006-009-CO... See more | BARANGAY STA. MARIA, DUPAX DEL SUR, NUEVA VIZCAYA | Approved | 2025-07-10 09:29:11 | Ready for Release | Processed in 4 working days. |
| 377 | DOLE_RO2_2025-07-11_149_Y31X | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-70-25 CONSTRUC... See more | SAN GUILLERMO AND CLAVERIA, CAGAYAN | Approved | 2025-07-10 09:59:32 | Ready for Release | Processed in 2 working days. |
| 378 | DOLE_RO2_2025-07-11_148_KDSX | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-71-25 CONSTRUC... See more | LUZON, CLAVERIA, CAGAYAN | Approved | 2025-07-10 10:14:32 | Ready for Release | Processed in 2 working days. |
| 379 | DOLE_RO2_2025-07-11_150_R9YM | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-72-25 CONSTRUC... See more | MACTEL, CLAVERIA, CAGAYAN | Approved | 2025-07-10 10:21:11 | Ready for Release | Processed in 2 working days. |
| 380 | DOLE_RO2_2025-07-11_151_TLQC | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-76-25 CONSTRUC... See more | CLAVERIA, CAGAYAN | Approved | 2025-07-10 10:26:32 | Ready for Release | Processed in 2 working days. |
| 381 | DOLE_RO2_2025-07-11_152_DPV8 | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-77-25 CONSTRUC... See more | CLAVERIA, CAGAYAN | Approved | 2025-07-10 10:38:09 | Ready for Release | Processed in 2 working days. |
| 382 | DOLE_RO2_2025-07-16_168_KBZU | MASTER Z CONSTRUCTION SERVICES | CONSTRUCTION OF RIVER WALL PHA... See more | BINTAWAN SUR, VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-07-10 11:39:49 | Ready for Release | Processed in 5 working days. |
| 383 | DOLE_RO2_2025-07-16_169_NU19 | DKB CONSTRUCTION | CONCRETING OF ROAD AT SITIO CA... See more | REMUS, BAGGAO,CAGAYAN | Approved | 2025-07-10 12:09:15 | Ready for Release | Processed in 5 working days. |
| 384 | DOLE_RO2_2025-07-16_170_2PAG | DKB CONSTRUCTION | CONSTRUCTION OF EVACUATION CEN... See more | SAN JOSE, BAGGAO, CAGAYAN | Approved | 2025-07-10 12:23:43 | Ready for Release | Processed in 5 working days. |
| 385 | DOLE_RO2_2025-07-16_171_TERE | DKB CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | BUNUGAN, BAGGAO, CAGAYAN | Approved | 2025-07-10 12:27:58 | Ready for Release | Processed in 5 working days. |
| 386 | DOLE_RO2_2025-07-16_172_8BZW | JHUERS CONSTRUCTION | 8000-000-3-1-10-006-001-000-CO... See more | BARANGAY DOMANG, DUPAX DEL SUR, NUEVA VIZCAYA | Approved | 2025-07-10 12:53:42 | Ready for Release | Processed in 5 working days. |
| 387 | DOLE_RO2_2025-07-16_173_ZNHT | JHUERS CONSTRUCTION | LGU - DIADI BAC 2025-03-CONSTR... See more | DIADI, NUEVA VIZCAYA | Approved | 2025-07-10 14:14:02 | Ready for Release | Processed in 5 working days. |
| 388 | DOLE_RO2_2025-07-16_174_10A2 | DOUBLE-D CONSTRUCTION | REHABILITATION OF MASONRY DRAI... See more | LEGASPI STREET, CENTRO 8, TUGUEGARAO CITY | Approved | 2025-07-10 14:33:55 | Ready for Release | Processed in 5 working days. |
| 389 | RD BEDAÑA CONSTRUCTION AND SUPPLIES | STREET LIGHTING PROJECT ALONG ... See more | DADAP, LUNA, ISABELA | Rejected | 2025-07-10 14:41:53 | Returned to Applicant | TAGGED AS FINISHED PROJECT | |
| 390 | DOLE_RO2_2025-07-16_175_BUUU | E.L. CHAN CONSTRUCTION AND DEVELOPMENT | RELOCATION of Metrobank-Maharl... See more | R4 Tower. Quezon St. Cauayan City, Isabela | Approved | 2025-07-10 15:49:27 | Ready for Release | Processed in 5 working days. |
| 391 | DOLE_RO2_2025-07-16_176_TYSA | RD BEDAÑA CONSTRUCTION AND SUPPLIES | STREET LIGHTING PROJECT ALONG ... See more | DADAP, LUNA, ISABELA | Approved | 2025-07-10 16:03:48 | Ready for Release | Processed in 5 working days. |
| 392 | DOLE_RO2_2025-07-16_177_PYMF | RD BEDAÑA CONSTRUCTION AND SUPPLIES | STREET LIGHTING PROJECT IN BAR... See more | BARANGAY MACUGAY, LUNA, ISABELA | Approved | 2025-07-10 16:15:04 | Ready for Release | Processed in 5 working days. |
| 393 | JIJOMER CONSTRUCTION | Repair / Rehab. of Ramon Rural... See more | Isabela | Rejected | 2025-07-10 16:33:11 | Returned to Applicant | NO SIGNATURE OF THE PROJ | |
| 394 | DOLE_RO2_2025-07-16_178_B74N | JHUERS CONSTRUCTION | PB-CW-2025-038 CONSTRUCTION OF... See more | SAN PASCUAL, DIFFUN, QUIRINO | Approved | 2025-07-10 17:43:20 | Ready for Release | Processed in 4 working days. |
| 395 | DOLE_RO2_2025-07-16_179_L6K5 | JHUERS CONSTRUCTION | PB-CW-2025-043 CONSTRUCTION OF... See more | STO. TOMAS, MADDELA, QUIRINO | Approved | 2025-07-10 17:48:23 | Ready for Release | Processed in 4 working days. |
| 396 | DOLE_RO2_2025-07-16_180_QUNM | JHUERS CONSTRUCTION | PB-CW-2025-048 RECONSTRUCTION ... See more | MADDELA, QUIRINO | Approved | 2025-07-10 17:51:54 | Ready for Release | Processed in 4 working days. |
| 397 | DOLE_RO2_2025-07-16_181_KQKR | JHUERS CONSTRUCTION | PB-CW-2025-011 IMPROVEMENT/ CO... See more | SAN ISIDRO, DIFFUN, QUIRINO | Approved | 2025-07-10 17:55:44 | Ready for Release | Processed in 4 working days. |
| 398 | DOLE_RO2_2025-07-16_182_Y2OR | W.S FAGCANGAN CONSTRUCTION MANAGEMENT SERVICES | REHABILITATION OF VGH GYMNASIU... See more | BAGGAO CAGAYAN | Approved | 2025-07-11 07:48:33 | Ready for Release | Processed in 4 working days. |
| 399 | RSL BUILDERS ORPORATION | BRGY MASIPI WEST CABAGAN ISABELA | Rejected | 2025-07-11 12:11:06 | Returned to Applicant | NO CHE TESTING CERT/CHE OPERAT... See more | ||
| 400 | RD TALENS CONSTRUCTION AND TRADING | DESIGN AND BUILD FOR THE ESTAB... See more | CAGAYAN | Rejected | 2025-07-11 13:59:16 | Returned to Applicant | NO SIGNATURE OVER PRINTED NAME... See more | |
| 401 | RD TALENS CONSTRUCTION AND TRADING | DESIGN AND BUILD FOR THE ESTAB... See more | ISABELA | Rejected | 2025-07-11 14:02:22 | Returned to Applicant | 1. No signature of the project... See more | |
| 402 | DOLE_RO2_2025-07-16_183_7PJ5 | G.M. PAJARILLAGA CONSTRUCTION & SUPPLY | INFRA-NCB-NVIMO-17-25, PACKAGE... See more | VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-07-11 14:06:08 | Ready for Release | Processed in 4 working days. |
| 403 | DOLE_RO2_2025-07-14_156_GG2O | NAJU-SHRINE CONSTRUCTION SERVICES | CONSTRUCTION OF MULTI-PURPOSE ... See more | BARANGAY PAO, KASIBU, NUEVA VZICAYA | Approved | 2025-07-11 14:12:37 | Ready for Release | Processed in 2 working days. |
| 404 | DOLE_RO2_2025-07-16_184_2HKF | ACES 3 CONSTRUCTION | PB-CW-2025-045-Reconstruction ... See more | Ricarte Sur, Diffun, Quirino | Approved | 2025-07-11 15:20:53 | Ready for Release | Processed in 4 working days. |
| 405 | Lancesoft Infra Solution Inc | E02911-B05 / NS-NTG23-I44 | ZONE 2, BRGY. CALITLITAN, ARITAO, NUEVA VIZCAYA | Rejected | 2025-07-11 15:43:16 | Returned to Applicant | no attached application form a... See more | |
| 406 | Lancesoft Infra Solution Inc | E02878 B06 / NS-TER24 B113 | HT MP1 BRGY LUBLUB POBLACION ALFONSO CASTANEDA NUEVA VIZCAYA | Rejected | 2025-07-11 16:31:21 | Returned to Applicant | no attachments | |
| 407 | DOLE_RO2_2025-07-15_162_FOCZ | 5MJ'S CONSTRUCTION | CONSTRUCTION OF BAYBAYOG AGRI-... See more | BAYBAYOG, ALCALA, CAGAYAN | Approved | 2025-07-11 16:54:05 | Ready for Release | Processed in 2 working days. |
| 408 | 5MJ'S CONSTRUCTION | CONCRETING OF JURISDICTION FMR | JURISDICTION ALCALA, CAGAYAN | Rejected | 2025-07-11 17:00:41 | Returned to Applicant | UNSIGNED PCAB LICENSE, NO CHE ... See more | |
| 409 | DOLE_RO2_2025-07-14_157_U2D1 | NAJU-SHRINE CONSTRUCTION SERVICES | IMPROVEMENT OF BARANGAY ROADS ... See more | BRGY. PAO, KASIBU, NUEVA VIZCAYA | Approved | 2025-07-13 10:33:08 | Ready for Release | Processed in 1 working days. |
| 410 | DOLE_RO2_2025-07-14_158_XZVA | NAJU-SHRINE CONSTRUCTION SERVICES | IMPROVEMENT OF KINAPIAN FMR-PU... See more | BRGY. PAO, KASIBU, NUEVA VIZCAYA | Approved | 2025-07-13 10:37:25 | Ready for Release | Processed in 1 working days. |
| 411 | DOLE_RO2_2025-07-16_185_IHBX | SKYELER'S CONSTRUCTION SERVICES | INSTALLATION OF SOLAR STREETLI... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-07-13 10:46:17 | Ready for Release | Processed in 3 working days. |
| 412 | DOLE_RO2_2025-07-16_186_E8S0 | D' BROTHERS INTERNATIONAL TRADING CORPORATION | NCB-INFRA-QIMO-11-25, DUMALINT... See more | DIFFUN, QUIRINO | Approved | 2025-07-13 10:56:55 | Ready for Release | Processed in 3 working days. |
| 413 | DOLE_RO2_2025-07-16_187_UAOK | RD BEDAÑA CONSTRUCTION AND SUPPLIES | STREET LIGHTING PROJECT IN BAR... See more | BARANGAY PULAY, LUNA, ISABELA | Approved | 2025-07-14 09:20:58 | Ready for Release | Processed in 3 working days. |
| 414 | DOLE_RO2_2025-07-16_188_NYLZ | RD BEDAÑA CONSTRUCTION AND SUPPLIES | STREET LIGHTING PROJECT IN BAR... See more | BARANGAY LALOG 1, LUNA, ISABELA | Approved | 2025-07-14 09:26:55 | Ready for Release | Processed in 3 working days. |
| 415 | DOLE_RO2_2025-07-16_189_DIK1 | Harmonic System Incorporated | Limbauan Solar Power Plant | Limbauan, San Pablo, Isabela | Approved | 2025-07-14 10:12:41 | Ready for Release | Processed in 3 working days. |
| 416 | DOLE_RO2_2025-07-16_190_YWY6 | CAPITAL CONSTRUCTION | Contract No. 2024-DII-RNIS-SAN... See more | SAN MATEO, ISABELA | Approved | 2025-07-14 10:39:37 | Ready for Release | Processed in 3 working days. |
| 417 | DOLE_RO2_2025-07-16_191_3JZX | JKA-Ver Construction and Engineering Services | FTAP-GLOBE ROLLOUT PROJECT | PUROK 4, BRGY. BACKILING, APPARI CAGAYAN | Approved | 2025-07-14 10:39:49 | Ready for Release | Processed in 3 working days. |
| 418 | JKAVer Construction and Engineering Services | FTAP-GLOBE ROLLOUT PROJECT: PH... See more | Brgy. San Juan Quezon, Isabela | Rejected | 2025-07-14 11:33:47 | Returned to Applicant | H.E. not indicated in the appl... See more | |
| 419 | RD TALENS CONSTRUCTION AND TRADING | DESIGN AND BUILD FOR THE ESTAB... See more | CAGAYAN | Rejected | 2025-07-14 15:52:45 | Returned to Applicant | CSHP TEMPLATE NOT SIGNED BY TH... See more | |
| 420 | RD TALENS CONSTRUCTION AND TRADING | DESIGN AND BUILD FOR THE ESTAB... See more | ISABELA | Rejected | 2025-07-14 15:54:48 | Returned to Applicant | HEAVY EQUIPMENT (BULLDOZER, DU... See more | |
| 421 | DOLE_RO2_2025-08-06_282_USUI | MNL INC. | BARANGAY KAYCHANARIANAN BASCO BATANES | Approved | 2025-07-14 16:17:15 | Ready for Release | Processed in 17 working days. | |
| 422 | DOLE_RO2_2025-08-06_283_H8JR | MNL INC. | CONSTRUCTION OF SELF SUPPORTIN... See more | NATIONAL RD SITIO CALAVANAN STA LUCIA ITBAYAT BATANES | Approved | 2025-07-14 16:21:35 | Ready for Release | Processed in 17 working days. |
| 423 | DOLE_RO2_2025-07-15_159_QY5G | JMRL DESIGN AND CONSTRUCTION | INFRA-NCB-NVIMO-19-25-REHABILI... See more | KAYAPA, NUEVA VIZCAYA | Approved | 2025-07-14 16:57:01 | Ready for Release | Processed in 1 working days. |
| 424 | MNL INC. | CONSTRUCTION OF SELF SUPPORTIN... See more | MAIN AVE CORR LAKANDULA ST BRGY SAN GABRIEL TUGUEGARAO CITY CAGAYAN | Rejected | 2025-07-14 17:48:25 | Returned to Applicant | NO NC2 FOR SCAFFOLDING | |
| 425 | DOLE_RO2_2025-07-15_160_MOVJ | MIZRACH'S CONSTRUCTION SERVICES | CONSTRUCTION OF STONE MASONRY ... See more | Guinalbin, Aglipay, Quirino | Approved | 2025-07-15 08:05:22 | Ready for Release | Processed in 1 working days. |
| 426 | MA TESORO CONSTRUCTION | INFRA 25-10-30-PACKAGE 25-30: ... See more | SANTIAGO CITY,ISABELA | Rejected | 2025-07-15 08:32:06 | Returned to Applicant | NO LOI, APPLICATION FORM, CSHP... See more | |
| 427 | MA TESORO CONSTRUCTION | INFRA 25-10-30-PACKAGE 25-30: ... See more | SANTIAGO CITY,ISABELA | Rejected | 2025-07-15 09:03:11 | Returned to Applicant | 1. ADDITIONAL 1 SAFETY OFFICER... See more | |
| 428 | MA TESORO CONSTRUCTION | INFRA 25-10-31-PACKAGE 25-31: ... See more | SANTIAGO CITY,ISABELA | Rejected | 2025-07-15 09:08:15 | Returned to Applicant | 1. ADDITIONAL 1 SAFEWTY OFFICE... See more | |
| 429 | DOLE_RO2_2025-07-15_161_PMFY | JHUERS CONSTRUCTION | PB-CW-2025-028 CONSTRUCTION/ C... See more | COFCAVILLE, MADDELA, QUIRINO | Approved | 2025-07-15 10:08:30 | Ready for Release | Processed in 1 working days. |
| 430 | JHUERS CONSTRUCTION | PB-CW-2025-023 (RE-ADVERTISED)... See more | PEDLISAN, AGLIPAY, QUIRINO | Rejected | 2025-07-15 10:26:16 | Returned to Applicant | Findings: 1. Safety Officer H... See more | |
| 431 | A&J DESIGNS AND CONSTRUCTION | REPAIR/REHABILITATION OF PLGU ... See more | NUEVA VIZCAYA STATE UNIVERSITY- BAMBANG CAMPUS | Rejected | 2025-07-15 13:33:54 | Returned to Applicant | Properly Fill out Template | |
| 432 | JIT BUILDERS | Completion/Upgrading/Repair of... See more | Burgos, Cabarroguis, Quirino. | Rejected | 2025-07-15 14:14:29 | Returned to Applicant | Findings: 1. Skilled Worker C... See more | |
| 433 | JIT BUILDERS | Completion/Upgrading/Repair of... See more | Tucod, Cabarroguis, Quirino | Rejected | 2025-07-15 15:11:32 | Returned to Applicant | Findings: 1. Skilled Worker C... See more | |
| 434 | MIG AGGREGATES AND CONCRETE PRODUCTS | IMPROVEMENT OF OFFICE COMPOUND... See more | CALAPANGAN, STO. NIÑO, CAGAYAN | Rejected | 2025-07-15 16:52:33 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 435 | MIG AGGREGATES AND CONCRETE PRODUCTS | SUPPLY, DELIVERY AND INSTALLAT... See more | CALAPANGAN, STO. NIÑO, CAGAYAN | Rejected | 2025-07-15 18:57:04 | Returned to Applicant | INCOMPLETE ATTACHMENT | |
| 436 | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-45m, 24sqm, 320kph, 150D k... See more | Benito Soliven, Isabela | Rejected | 2025-07-16 07:50:41 | Returned to Applicant | DOUBLE ENTRY #599 | |
| 437 | DOLE_RO2_2025-07-17_193_ANZI | CMGD CONSTRUCTION | SVP-PR NO. CP-2025-01-0007 GEP... See more | NIA, MARIIS, MINANTE I, CAUAYAN CITY, ISABELA | Approved | 2025-07-16 08:31:39 | Ready for Release | Processed in 2 working days. |
| 438 | DOLE_RO2_2025-07-17_194_V78I | JHUERS CONSTRUCTION | PB-CW-2025-023 (RE- ADVERTISED... See more | PEDLISAN, MADDELA, QUIRINO | Approved | 2025-07-16 08:44:36 | Ready for Release | Processed in 2 working days. |
| 439 | DOLE_RO2_2025-07-21_201_E9NH | D. MORALES CONSTRUCTION | REHABILITATION OF MASONRY DRAI... See more | DEL ROSARIO ST., CENTRO 4, TUGUEGARAO CITY, CAGAYAN | Approved | 2025-07-16 08:52:24 | Ready for Release | Processed in 4 working days. |
| 440 | 8J BUILDERS AND SUPPLY | COMPLETION OF DRAINAGE SYSTEM ... See more | PUROK 4, VILLAMOR, CABARROGUIS, QUIRINO | Rejected | 2025-07-16 09:07:22 | Returned to Applicant | Incomplete documents | |
| 441 | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-45m, 24sqm, 320kph, 150D k... See more | Benito Soliven, Isabela | Rejected | 2025-07-16 09:12:39 | Returned to Applicant | NO CSHP TEMPLATE ATTACHED. | |
| 442 | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-50m, 24sqm, 320kph, 150D k... See more | San agustin, Isabela | Rejected | 2025-07-16 10:12:02 | Returned to Applicant | LETTER OF INTENT MUST BE SIGNE... See more | |
| 443 | MIG AGGREGATES AND CONCRETE PRODUCTS | ESTABLISHMENT OF NURSERY AND W... See more | CALAPANGAN, STO. NIÑO, CAGAYAN | Rejected | 2025-07-16 10:26:35 | Returned to Applicant | INCOMPLETE ATTACHMENT | |
| 444 | MNL INC. | CONSTRUCTION OF SELF SUPPORTIN... See more | MAIN AVE CORR LAKANDULA ST BRGY SAN GABRIEL TUGUEGARAO CITY CAGAYAN | Rejected | 2025-07-16 10:45:22 | Returned to Applicant | NC2 FOR SCAFFOLDER, ELECTRICIA... See more | |
| 445 | DOLE_RO2_2025-07-16_192_YYV5 | 5MJ'S CONSTRUCTION | Concreting of Jurisdiction FMR | Jurisdiction, Alcala, Cagayan | Approved | 2025-07-16 11:11:18 | Ready for Release | Processed in 1 working days. |
| 446 | Gualon Construction | Construction of Cemetery Road ... See more | Barangay Paitan, Bayombong, Nueva Vizcaya | Rejected | 2025-07-16 11:44:28 | Returned to Applicant | 1. Application Form and Templa... See more | |
| 447 | SCR CONSTRUCTION AND ENTERPRISES | NCB-INFRA-QIMO-27-24 CONSTRUCT... See more | MADDELA, QUIRINO | Rejected | 2025-07-16 12:08:03 | Returned to Applicant | Safety Officers and First Aide... See more | |
| 448 | DOLE_RO2_2025-07-21_202_O7OH | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-50m, 24sqm, 320kph, 150D k... See more | CLAVERIA, CAGAYAN | Approved | 2025-07-16 15:26:37 | Ready for Release | Processed in 3 working days. |
| 449 | DOLE_RO2_2025-07-17_195_C0FG | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-45m, 24sqm, 320kph, 150D k... See more | Benito Soliven, Isabela | Approved | 2025-07-16 17:29:46 | Ready for Release | Processed in 1 working days. |
| 450 | DOLE_RO2_2025-07-17_196_70GF | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-50m, 24sqm, 320kph, 150D k... See more | San Agustin, Isabela | Approved | 2025-07-16 17:33:50 | Ready for Release | Processed in 1 working days. |
| 451 | ACES 3 CONSTRUCTION | PB-CW-2025-050-COMPLETION/UPGR... See more | CAMPAMENTO,DIFFUNQUIRINO | Rejected | 2025-07-17 10:13:20 | Returned to Applicant | Findings: 1. Safety Officer, ... See more | |
| 452 | ACES 3 CONSTRUCTION | PB-CW-2025-058-COMPLETION/UPGR... See more | Magsaysay,Diffun,Quirino | Rejected | 2025-07-17 10:15:44 | Returned to Applicant | COMPLETED PROJECT | |
| 453 | DOLE_RO2_2025-07-21_203_AEYP | RD TALENS CONSTRUCTION AND TRADING | DESIGN AND BUILD FOR THE ESTAB... See more | CAGAYAN | Approved | 2025-07-17 11:34:14 | Ready for Release | Processed in 3 working days. |
| 454 | RD TALENS CONSTRUCTION AND TRADING | DESIGN AND BUILD FOR THE ESTAB... See more | ISABELA | Rejected | 2025-07-17 11:35:25 | Returned to Applicant | DOUBLE ENTRY | |
| 455 | RD TALENS CONSTRUCTION AND TRADING | DESIGN AND BUILD FOR THE ESTAB... See more | ISABELA | Rejected | 2025-07-17 11:35:35 | Returned to Applicant | DOUBLE ENTRY | |
| 456 | JHUERS CONSTRUCTION | PB-CW-2025-032 CONSTRUCTION/ C... See more | LIWAYWAY, DIFFUN, QUIRINO | Rejected | 2025-07-17 13:45:12 | Returned to Applicant | 1. Please fill out under CSHP ... See more | |
| 457 | J3P CONSTRUCTION AND DEVELOPE CORPORATION | CONSTRUCTION OF MACAÑAO PERMA... See more | LUNA, ISABELA | Rejected | 2025-07-17 15:48:14 | Returned to Applicant | Certificate of Training of Fir... See more | |
| 458 | DOLE_RO2_2025-07-21_197_AWBU | JHUERS CONSTRUCTION | LGU-DIADI BAC 2025-08 CONSTRUC... See more | BARANGAY DECABACAN, DIADI, NUEVA VIZCAYA | Approved | 2025-07-17 17:03:36 | Ready for Release | Processed in 2 working days. |
| 459 | DOLE_RO2_2025-07-21_198_WCN4 | JHUERS CONSTRUCTION | IMPROVEMENT OF COVERED COURT @... See more | ROSARIO, DIADI, NUEVA VIZCAYA | Approved | 2025-07-17 17:06:50 | Ready for Release | Processed in 2 working days. |
| 460 | DOLE_RO2_2025-07-21_199_EAM2 | JHUERS CONSTRUCTION | CONSTRUCTION OF OVER FLOW BRID... See more | PUROK 6, BONFAL PROPER, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-07-17 17:12:37 | Ready for Release | Processed in 2 working days. |
| 461 | J3P CONSTRUCTION AND DEVELOPE CORPORATION | CONSTRUCTION OF MACAÑAO PERMA... See more | LUNA, ISABELA | Rejected | 2025-07-17 17:13:20 | Returned to Applicant | CERTIFICATE OF TRAINING OF FIR... See more | |
| 462 | JHUERS CONSTRUCTION | PB-CW-2025-032 CONSTRUCTION/ C... See more | LIWAYWAY, DIFFUN, QUIRINO | Rejected | 2025-07-17 17:31:03 | Returned to Applicant | Findings: 1. MARIANNE M. DAPO... See more | |
| 463 | JKA-Ver Construction and Engineering Services | FTAP-GLOBE ROLLOUT PROJECT | BRGY. CABESERA, 9 AND 11, ILAGAN CITY, ISABELA | Rejected | 2025-07-18 08:55:01 | Returned to Applicant | 1. NC II BACKHOE OPERATOR INVA... See more | |
| 464 | JKAVer Construction and Engineering Services | FTAP - GLOBE ROLLOUT PROJECT: ... See more | Brgy. San Juan Quezon, Isabela | Rejected | 2025-07-18 11:31:01 | Returned to Applicant | 1. NC II-BACKHOE OPERATOR IS I... See more | |
| 465 | DOLE_RO2_2025-07-21_200_10EA | SCR CONSTRUCTION AND ENTERPRISES | NCB-INFRA-QIMO-27-24 CONSTRUCT... See more | MADDELA, QUIRINO | Approved | 2025-07-18 12:10:04 | Ready for Release | Processed in 1 working days. |
| 466 | DOLE_RO2_2025-07-21_204_BO6U | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-79-25 CONSTRUC... See more | CLAVERIA, CAGAYAN | Approved | 2025-07-18 12:38:08 | Ready for Release | Processed in 2 working days. |
| 467 | DOLE_RO2_2025-07-21_205_39F3 | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-81-25 CONSTRUC... See more | CLAVERIA, CAGAYAN | Approved | 2025-07-18 12:42:00 | Ready for Release | Processed in 2 working days. |
| 468 | Juris Construction & Builders | PB-CW-2025-019- Improvement of... See more | Buenavista, Maddela, Quirino | Rejected | 2025-07-18 13:44:56 | Returned to Applicant | Please Attached First Aider ID... See more | |
| 469 | Juris Construction & Builders | PB-CW-2025-039-Construction of... See more | Abbag, Maddela, Quirino | Rejected | 2025-07-18 15:01:51 | Returned to Applicant | Please Attached First Aider ID... See more | |
| 470 | DOLE_RO2_2025-07-28_215_7Q2A | J.A UBONGEN CONSTRUCTION | Lot70 Repair/Rehabilitation of... See more | Brgy.Bucal sur Dinapigue Isabela | Approved | 2025-07-18 16:30:12 | Ready for Release | Processed in 6 working days. |
| 471 | DOLE_RO2_2025-07-28_216_VQYT | J. A UBONGEN CONSTRUCTION | Lot54 Repair/Rehabilitation o... See more | San Agustin Isabela | Approved | 2025-07-18 16:39:16 | Ready for Release | Processed in 6 working days. |
| 472 | DOLE_RO2_2025-07-23_210_6LWT | J. A UBONGEN CONSTRUCTION | Lot55 Repair/Rehabilitation of... See more | Jones Isabela | Approved | 2025-07-18 17:04:59 | Ready for Release | Processed in 3 working days. |
| 473 | DOLE_RO2_2025-07-28_217_C8ET | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED TELEC... See more | BRGY ZONE III (POB), SAN MARIANO, ISABELA | Approved | 2025-07-18 18:42:04 | Ready for Release | Processed in 6 working days. |
| 474 | DOLE_RO2_2025-07-28_218_VIP5 | J. A UBONGEN CONSTRUCTION | Lot58 Repair/Rehabilitation of... See more | Barangay Linamanan Jones Isabela | Approved | 2025-07-21 08:09:05 | Ready for Release | Processed in 6 working days. |
| 475 | J.A UBONGEN CONSTRUCTION | Lot72 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-07-21 08:33:35 | Returned to Applicant | FA AND SO W/ ONGOING PROJECT W... See more | |
| 476 | DOLE_RO2_2025-07-21_207_26QJ | G3M CONSTRUCTION | CONCRETING OF BALONG TO BALHI ... See more | LABANG, AMBAGUIO, NUEVA VIZCAYA | Approved | 2025-07-21 10:23:52 | Ready for Release | Processed in 1 working days. |
| 477 | DOLE_RO2_2025-07-21_208_KVVC | G3M CONSTRUCTION | CONCRETING OF BIT-ANG TO BARAN... See more | NAPO, AMBAGUIO, NUEVA VIZCAYA | Approved | 2025-07-21 10:26:38 | Ready for Release | Processed in 1 working days. |
| 478 | DOLE_RO2_2025-07-21_209_EROZ | G3M CONSTRUCTION | CONCRETING OF PIHIPI ROAD | CAMANDAG, AMBAGUIO, NUEVA VIZCAYA | Approved | 2025-07-21 10:28:49 | Ready for Release | Processed in 1 working days. |
| 479 | DOLE_RO2_2025-07-21_206_U3RQ | TECKCON CONSTRUCTION | IB#-2025-39: CONSTRUCTION OF M... See more | GADU, SOLANA, CAGAYAN | Approved | 2025-07-21 10:34:41 | Ready for Release | Processed in 1 working days. |
| 480 | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-45m, 24sqm, 320kph, 150D k... See more | SAGUDAY QUIRINO | Rejected | 2025-07-21 10:48:19 | Returned to Applicant | Letter must Address to Our Re... See more | |
| 481 | DOLE_RO2_2025-07-23_211_NHZG | JC SOLIDARITY CONSTRUCTION | NCB-INFRA-ISA124-25-RPIS-GAPPA... See more | CAUAYAN CITY, ISABELA | Approved | 2025-07-21 11:05:08 | Ready for Release | Processed in 3 working days. |
| 482 | DOLE_RO2_2025-07-23_212_63AZ | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-ISA125-25-RPIS-GAPPA... See more | CAUAYAN CITY, ISABELA | Approved | 2025-07-21 11:09:06 | Ready for Release | Processed in 3 working days. |
| 483 | DOLE_RO2_2025-07-23_213_7I0N | JC SOLIDARITY CONSTRUCTION | NCB-INFRA-ISA126-25-RSNIS-SPCI... See more | CABAGAN, ISABELA | Approved | 2025-07-21 11:12:37 | Ready for Release | Processed in 3 working days. |
| 484 | JKAVer Construction and Engineering Services | FTAP - GLOBE ROLLOUT PROJECT :... See more | Brgy. San Juan Quezon, Isabela | Rejected | 2025-07-21 11:35:32 | Returned to Applicant | 1. Application form should be ... See more | |
| 485 | DOLE_RO2_2025-07-29_228_09M2 | MA TESORO CONSTRUCTION | PACKAGE 25-31: CONSTRUCTION/ I... See more | BALUARTE - BANNAWAG NORTE, SANTIAGO CITY | Approved | 2025-07-21 14:35:08 | Ready for Release | Processed in 6 working days. |
| 486 | DOLE_RO2_2025-07-29_229_4KM5 | MA TESORO CONSTRUCTION | PACKAGE 25-30: BARANGAY FACILI... See more | VARIOUS BARANGAYS, SANTIAGO CITY | Approved | 2025-07-21 14:37:06 | Ready for Release | Processed in 6 working days. |
| 487 | DOLE_RO2_2025-07-28_219_5RAI | JC PALOMO CONSTRUCTION AND CONSTRUCTION SUPPLY | CONSTRUCTION OF MACAÑAO PERMA... See more | LUNA, ISABELA | Approved | 2025-07-21 16:17:26 | Ready for Release | Processed in 5 working days. |
| 488 | MNL INC. | CONSTRUCTION OF SELF SUPPORTIN... See more | MAIN AVE CORR LAKANDULA ST BRGY SAN GABRIEL TUGUEGARAO CITY CAGAYAN | Rejected | 2025-07-21 16:20:05 | Returned to Applicant | NO CHE TESTING FOR EQUIPMENT U... See more | |
| 489 | DOLE_RO2_2025-07-29_230_2FRP | JC PALOMO CONSTRUCTION AND CONSTRUCTION SUPPLY | CONCRETING OF FMR AT NATIONAL ... See more | QUEZON, ISABELA | Approved | 2025-07-21 16:24:07 | Ready for Release | Processed in 6 working days. |
| 490 | DOLE_RO2_2025-07-28_220_TGST | BRANICS CONSTRUCTION SERVICES | Concreting of Verona Digitel R... See more | Verona, Didipio, Kasibu, Nueva Vizcaya | Approved | 2025-07-21 18:20:13 | Ready for Release | Processed in 5 working days. |
| 491 | DOLE_RO2_2025-07-28_221_M5AS | GUALON CONSTRUCTION | CONSTRUCTION OF CEMETERY ROAD ... See more | BARANGAY PAITAN, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-07-22 09:31:03 | Ready for Release | Processed in 5 working days. |
| 492 | REYROSE CONSTRUCTION | CONSTRUCTION OFAND INSTALLATIO... See more | camalaniugan, cagayan | Rejected | 2025-07-22 11:58:23 | Returned to Applicant | NO NAME AND SIGNATURE OF PROJE... See more | |
| 493 | SCR CONSTRUCTION AND ENTERPRISES | PB-CW-2025-010 IMPROVEMENT/ CO... See more | GULAC, DIFFUN, QUIRINO | Rejected | 2025-07-22 12:41:49 | Returned to Applicant | Same Person ( First Aider and ... See more | |
| 494 | DOLE_RO2_2025-07-28_222_30O8 | Juris Construction & Builders | PB-CW-2025-19-Improvement/Conc... See more | Buenavista, Maddela, Quirino | Approved | 2025-07-22 13:20:06 | Ready for Release | Processed in 4 working days. |
| 495 | DOLE_RO2_2025-07-28_223_M54V | Juris Construction & Builders | PB-CW-2025-039-Construction of... See more | Abbag, Maddela, Quirino | Approved | 2025-07-22 13:31:25 | Ready for Release | Processed in 4 working days. |
| 496 | YSIDRA CONSTRUCTION INC. | Construction of 1 Box Culvert ... See more | Agaman Norte, Baggao Cagayan | Rejected | 2025-07-22 14:41:11 | Returned to Applicant | NO CSHP TEMPLATE ATTACHED | |
| 497 | GENTEN BUILDERS | REPAIR/REHABILITATION OF CLAVE... See more | CLAVERIA,CAGAYAN | Rejected | 2025-07-22 15:43:09 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 498 | GENTEN BUILDERS | REPAIR/REHABILITATION OF STA. ... See more | STA.PRAXEDES,CAGAYAN | Rejected | 2025-07-22 16:03:01 | Returned to Applicant | NO NC2 FOR ELECTRICIAN, NO NC2... See more | |
| 499 | DOLE_RO2_2025-07-28_224_0YCQ | MASTER Z CONSTRUCTION SERVICES | REHABILITATION/CONSTRUCTION OF... See more | BINTAWAN SUR & BINTAWAN NORTE, VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-07-22 16:06:33 | Ready for Release | Processed in 4 working days. |
| 500 | RD TALENS CONSTRUCTION AND TRADING | DESIGN AND BUILD FOR THE ESTAB... See more | ISABELA | Rejected | 2025-07-22 16:49:45 | Returned to Applicant | NC2 BULLDOZER FAKE, NC2 SMAW F... See more | |
| 501 | JHUERS CONSTRUCTION | PB-CW-2025-056 COMPLETION/ UPG... See more | CALAOCAN, CABARROGUIS, QUIRINO | Rejected | 2025-07-22 17:29:34 | Returned to Applicant | FA AND SO WITH EXISTING PROJEC... See more | |
| 502 | DOLE_RO2_2025-07-28_225_BZ1V | JKA-Ver Construction and Engineering Services | FTAP-GLOBE ROLLOUT PROJECT | BRGY. CABESERA, 9 AND 11, ILAGAN CITY, ISABELA | Approved | 2025-07-23 08:11:28 | Ready for Release | Processed in 4 working days. |
| 503 | 3JMS CONSTRUCTION | REHABILITATION OF ROAD ALONG S... See more | SORIANO STREET, PALLUA SUR, TUGUEGARAO CITY | Rejected | 2025-07-23 12:02:56 | Returned to Applicant | FA AND SO WITH EXISTING PROJEC... See more | |
| 504 | DOLE_RO2_2025-07-29_231_E7TI | EDWIN ERWIN SISON CONSTRUCTION | INFRA-NCB-NVIMO-16-25, PACKAGE... See more | SOLANO, NUEVA VIZCAYA | Approved | 2025-07-23 12:34:49 | Ready for Release | Processed in 4 working days. |
| 505 | DOLE_RO2_2025-07-29_232_AWWS | DEKM CONSTRUCTION | CONSTRUCTION/CONTINUATION OF M... See more | SITIO MASISIT, ASASSI, BAGGAO, CAGAYAN | Approved | 2025-07-23 12:38:47 | Ready for Release | Processed in 4 working days. |
| 506 | DOLE_RO2_2025-07-29_233_NLZY | BELANCE BUILDERS & TRADING | IMPROVEMENT OF CATAWARAN-KAKID... See more | BRGY. CATAWARAN, KASIBU, NUEVA VIZCAYA | Approved | 2025-07-23 12:39:15 | Ready for Release | Processed in 4 working days. |
| 507 | MIG AGGREGATES AND CONCRETE PRODUCTS | IMPROVEMENT OF OFFICE COMPOUND... See more | CALAPANGAN, STO. NIÑO, CAGAYAN | Rejected | 2025-07-23 12:42:33 | Returned to Applicant | Under DO 252, Series of 2025, ... See more | |
| 508 | DOLE_RO2_2025-07-29_234_0J2V | WINLEI CONSTRUCTION AND SUPPLY | IMPROVEMENT OF PUROK 1-2 COMMO... See more | SOLANO, NUEVA VIZCAYA | Approved | 2025-07-23 12:45:23 | Ready for Release | Processed in 4 working days. |
| 509 | MIG AGGREGATES AND CONCRETE PRODUCTS | SUPPLY, DELIVERY AND INSTALLAT... See more | CALAPANGAN, STO. NIÑO, CAGAYAN | Rejected | 2025-07-23 12:48:36 | Returned to Applicant | AS PER DO 252 GUIDELENES 10 WO... See more | |
| 510 | MIG AGGREGATES AND CONCRETE PRODUCTS | ESTABLISHMENT OF NURSERY AND W... See more | CALAPANGAN, STO. NIÑO, CAGAYAN | Rejected | 2025-07-23 12:52:35 | Returned to Applicant | PROVIDE 2 SO AND 2 FA FOR 10WO... See more | |
| 511 | JHUERS CONSTRUCTION | PB-CW-2025-032 CONSTRUCTION/ C... See more | LIWAYWAY, DIFFUN, QUIRINO | Rejected | 2025-07-23 13:14:12 | Returned to Applicant | PLEASE ATTACHED NC II OF ELEC... See more | |
| 512 | JKAVer Construction and Engineering Services | FTAP - GLOBE ROLLOUT PROJECT: ... See more | Brgy. San Juan Quezon, Isabela | Rejected | 2025-07-23 13:23:54 | Returned to Applicant | 1. CSHP TEMPLATE- NOT DULY FIL... See more | |
| 513 | J.R. MALOLOYON DESIGN AND CONSTRUCTION | ENHANCEMENT OF HALLWAY, ENGINE... See more | NIA-COMPOUND, NATIONAL HIGHWAY, SAN FERMIN, CAUAYAN CITY, ISABELA | Rejected | 2025-07-23 14:10:26 | Returned to Applicant | tagged as finished project, no... See more | |
| 514 | DOLE_RO2_2025-07-24_214_MUS2 | SCR CONSTRUCTION AND ENTERPRISES | PB-CW-2025-010 IMPROVEMENT/ CO... See more | GULAC, DIFFUN, QUIRINO | Approved | 2025-07-23 14:25:39 | Ready for Release | Processed in 2 working days. |
| 515 | J.R. MALOLOYON DESIGN AND CONSTRUCTION | CONSTRUCTION OF COVERED PATHWA... See more | NATIONAL HIGHWAY, SAN FERMIN, CAUAYAN CITY, ISABELA | Rejected | 2025-07-23 14:26:21 | Returned to Applicant | NO SIGNATURE OF AMO AT UPPER R... See more | |
| 516 | DOLE_RO2_2025-07-29_235_PMI5 | DEKM CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | HACIENDA-INTAL, BAGGAO, CAGAYAN | Approved | 2025-07-23 14:39:07 | Ready for Release | Processed in 4 working days. |
| 517 | DOLE_RO2_2025-07-29_236_MXNV | CAVAT CAPITOL MERCHANDISING AND CONSTRUCTION | Concreting of Road at Alonzo F... See more | Lingu, Solana, Cagayan | Approved | 2025-07-23 14:48:12 | Ready for Release | Processed in 4 working days. |
| 518 | DOLE_RO2_2025-07-29_237_MRJ3 | CAVAT CAPITOL MERCHANDISING AND CONSTRUCTION | Concreting of Road at Alonzo F... See more | Bauan East, Solana, Cagayan | Approved | 2025-07-23 14:53:48 | Ready for Release | Processed in 4 working days. |
| 519 | MARKGIL CONSTRUCTION | FARM TO MARKET ROAD1 | ILAGAN ISABELA | Rejected | 2025-07-23 14:57:32 | Returned to Applicant | SAMPLE ONLY | |
| 520 | BMJ BUILDERS | Provision of Labor and Materia... See more | Carig Sur, Tuguegarao City | Rejected | 2025-07-23 15:04:07 | Returned to Applicant | NO NAME AND SIGNATURE OF PROJE... See more | |
| 521 | Lancesoft Infra Solution Inc | E02911-B05 / NS-NTG23-I44 | ZONE 2, BRGY. CALITLITAN, ARITAO, NUEVA VIZCAYA | Rejected | 2025-07-23 16:00:56 | Returned to Applicant | 1. Unsigned PCAB 2. First Aid... See more | |
| 522 | Lancesoft Infra Solution Inc | E02878 B06 / NS-TER24 B113 | HT MP1 BRGY LUBLUB POBLACION ALFONSO CASTANEDA NUEVA VIZCAYA | Rejected | 2025-07-23 16:12:10 | Returned to Applicant | 1. Unsigned Template 2. Unsig... See more | |
| 523 | TOP VISION DESIGN AND CONSTRUCTION SERVICES | REPAIR OF 6 CLASSROOMS AT ATUL... See more | ATULAYAN,TUGUEGARAO CITY | Rejected | 2025-07-23 16:31:52 | Returned to Applicant | FINISHED PROJECTS | |
| 524 | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED 45M T... See more | BRGY DUMMUN, GATTARAN, CAGAYAN | Rejected | 2025-07-24 09:19:46 | Returned to Applicant | APPLICATION FORM NOT PROPERLY ... See more | |
| 525 | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED 45M T... See more | BRGY MAGUIRIG, SOLANA, CAGAYAN | Rejected | 2025-07-24 09:25:18 | Returned to Applicant | APPLICATION FORM NOT PROPERLY ... See more | |
| 526 | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED 45M T... See more | BRGY LANGAGAN, SANCHEZ-MIRA CAGAYAN | Rejected | 2025-07-24 09:38:07 | Returned to Applicant | FA NAD SO WITH EXISTING PROJEC... See more | |
| 527 | DOLE_RO2_2025-07-28_226_TINN | ACES 3 CONSTRUCTION | PB-CW-2025-050-COMPLETION/UPGR... See more | CAMPAMENTO,DIFFUN QUIRINO | Approved | 2025-07-24 11:53:18 | Ready for Release | Processed in 3 working days. |
| 528 | DOLE_RO2_2025-07-28_227_PKKJ | ACES 3 CONSTRUCTION | PB-CW-2025-058-COMPLETION/UPGR... See more | Magsaysay,Diffun,Quirino | Approved | 2025-07-24 11:54:58 | Ready for Release | Processed in 3 working days. |
| 529 | DECA CONSTRUCTION | CONSTRUCTION OF SLAUGHTER HOUS... See more | MINANGA SUR, LASAM, CAGAYAN | Rejected | 2025-07-24 13:01:21 | Returned to Applicant | DOUBLE ENTRY | |
| 530 | Lancesoft Infra Solution Inc | E02911-B05 / NS-NTG23-I44 | ZONE 2, BRGY. CALITLITAN, ARITAO, NUEVA VIZCAYA | Rejected | 2025-07-24 16:04:40 | Returned to Applicant | Unsigned PCAB | |
| 531 | Lancesoft Infra Solution Inc | E02878 B06 / NS-TER24 B113 | HT MP1 BRGY LUBLUB POBLACION ALFONSO CASTANEDA NUEVA VIZCAYA | Rejected | 2025-07-24 16:13:11 | Returned to Applicant | Unsigned PCAB | |
| 532 | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED 45M T... See more | BRGY BAGU, PAMPLONA, CAGAYAN | Rejected | 2025-07-24 17:11:08 | Returned to Applicant | DOUBLE ENTRY | |
| 533 | DOLE_RO2_2025-07-29_240_J7LF | JHUERS CONSTRUCTION | PB-CW-2025-032 CONSTRUCTION/ C... See more | LIWAYWAY, DIFFUN, QUIRINO | Approved | 2025-07-25 11:32:06 | Ready for Release | Processed in 3 working days. |
| 534 | JHUERS CONSTRUCTION | LGU- DIADI BAC 2025-08 IMPROVE... See more | PUROK 1 LURAD, SITIO NAGTIM-OG, BUGNAY, PUROK 5 DURUAROG AND PUROK 3 NAGSABARAN, DIADI, NUEVA VIZCAYA | Rejected | 2025-07-25 12:39:11 | Returned to Applicant | RAMIL L. CABBIGAT - safety off... See more | |
| 535 | DOLE_RO2_2025-07-30_244_UY4A | JHUERS CONSTRUCTION | LGU- DIADI BAC 2025-11 CONSTRU... See more | PUROK 2 BARANGAY BUGNAY, DIADI, NUEVA VIZCAYA | Approved | 2025-07-25 12:44:40 | Ready for Release | Processed in 4 working days. |
| 536 | DOLE_RO2_2025-07-30_245_XKH0 | JHUERS CONSTRUCTION | LGU- DIADI BAC 2025-12 SLOPE P... See more | BARANGAY NAGSABARAN, DIADI, NUEVA VIZCAYA | Approved | 2025-07-25 12:49:34 | Ready for Release | Processed in 4 working days. |
| 537 | DOLE_RO2_2025-07-30_246_2ENH | JHUERS CONSTRUCTION | 8000-000-3-1-10-007-002-020 IM... See more | BARANGAY MANGAYANG, DUPAX DEL SUR, NUEVA VIZCAYA | Approved | 2025-07-25 12:55:08 | Ready for Release | Processed in 4 working days. |
| 538 | LAB GENERAL ENGINEERING | Repair/Rehabilitation of Duma... See more | Jones, Isabela | Rejected | 2025-07-25 15:41:39 | Returned to Applicant | NO ATTACHED DOCUMENTARY REQUIR... See more | |
| 539 | LAB GENERAL ENGINEERING | Repair/Rehabilitation of Sto D... See more | Jones, Isabela | Rejected | 2025-07-25 15:47:51 | Returned to Applicant | NO ATTACHED DOCUMENTARY REQUIR... See more | |
| 540 | DOLE_RO2_2025-07-30_241_R37O | EDWIN ERWIN SISON CONSTRUCTION | CONSTRUCTION OF AROSIP CIS | BRGY. BASCARAN, SOLANO, NUEVA VIZCAYA | Approved | 2025-07-26 18:04:41 | Ready for Release | Processed in 2 working days. |
| 541 | DOLE_RO2_2025-07-30_247_IUZD | EDWIN ERWIN SISON CONSTRUCTION | CONSTRUCTION OF LATUYOT CIS, M... See more | BRGY. MAGAPUY, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-07-26 18:13:45 | Ready for Release | Processed in 2 working days. |
| 542 | DOLE_RO2_2025-07-30_248_91CQ | DECA CONSTRUCTION | CONSTRUCTION OF SLAUGHTER HOUS... See more | MINANGA SUR, LASAM, CAGAYAN | Approved | 2025-07-28 13:27:57 | Ready for Release | Processed in 3 working days. |
| 543 | 8J BUILDERS AND SUPPLY | COMPLETION OF DRAINAGE SYSTEM ... See more | PUROK 4, VILLAMOR, CABARROGUIS, QUIRINO | Rejected | 2025-07-28 13:33:31 | Returned to Applicant | 1. CSHP program not duly fille... See more | |
| 544 | DOLE_RO2_2025-07-29_238_43LO | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-82-25 CONSTRUC... See more | CLAVERIA, CAGAYAN | Approved | 2025-07-28 13:35:05 | Ready for Release | Processed in 1 working days. |
| 545 | DOLE_RO2_2025-07-31_249_QGJS | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED TELEC... See more | BRGY MARABURAB, ALCALA, CAGAYAN | Approved | 2025-07-28 14:02:47 | Ready for Release | Processed in 3 working days. |
| 546 | 8J BUILDERS AND SUPPLY | PB-CW-2025-009 IMPROVEMENT/CON... See more | VILLA JOSE YLANAN, MADDELA, QUIRINO | Rejected | 2025-07-28 16:37:50 | Returned to Applicant | 1. CSHP PROGRAM NOT DULY FILLE... See more | |
| 547 | DOLE_RO2_2025-07-30_242_TDWS | UPLAND CONSTRUCTION | CONCRETING OF BIT-ANG TO BARAN... See more | AMMOWEG, AMBAGUIO, NUEVA VIZCAYA | Approved | 2025-07-28 16:44:28 | Ready for Release | Processed in 2 working days. |
| 548 | UPLAND CONSTRUCTION | CONCRETING OF TADYUKONG TO TUP... See more | DULLI, AMBAGUIO, NUEVA VIZCAYA | Rejected | 2025-07-28 16:46:52 | Returned to Applicant | Safety Officer and First Aider... See more | |
| 549 | DOLE_RO2_2025-07-31_250_WL08 | UPLAND CONSTRUCTION | CONCRETING OF LABBI TO LAYLAYA... See more | TIBLAC, AMBAGUIO, NUEVA VIZCAYA | Approved | 2025-07-28 16:49:50 | Ready for Release | Processed in 3 working days. |
| 550 | DOLE_RO2_2025-07-29_239_2JJA | MNL INC. | CONSTRUCTION OF SELF SUPPORTIN... See more | MAIN AVE CORR LAKANDULA ST BRGY SAN GABRIEL TUGUEGARAO CITY CAGAYAN | Approved | 2025-07-28 16:58:41 | Ready for Release | Processed in 1 working days. |
| 551 | DOLE_RO2_2025-07-30_243_R7E8 | WINLEI CONSTRUCTION AND SUPPLY | CONCRETING OF BALITON-LINGAY-U... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-07-28 18:24:53 | Ready for Release | Processed in 2 working days. |
| 552 | SESE CONSTRUCTION SERVICES | CONCRETING OF SITIO MALAMBAN F... See more | DALAOIG ALCALA CAGAYAN | Rejected | 2025-07-29 11:10:36 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 553 | SESE CONSTRUCTION SERVICES | CONCRETING OF SITIO MALAMBAN F... See more | DALAOIG ALCALA CAGAYAN | Rejected | 2025-07-29 11:24:05 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 554 | SESE CONSTRUCTION SERVICES | CONCRETING OF SITIO MALAMBAN F... See more | DALAOIG ALCALA CAGAYAN | Rejected | 2025-07-29 11:30:58 | Returned to Applicant | EXPIRED NC2 FOR WHEEL LOADER | |
| 555 | ATLANTIC CONSTRUCTION | repair/rehabilitation of canan... See more | cabatuan, isabela | Rejected | 2025-07-29 14:01:12 | Returned to Applicant | NO SIGNATURE OF AMO AT UPPER P... See more | |
| 556 | ATLANTIC CONSTRUCTION | resealing of runway cracks and... See more | tuguegarao city, cagayan | Rejected | 2025-07-29 14:04:11 | Returned to Applicant | 1. CSHP Program not duly fille... See more | |
| 557 | JKAVer Construction and Engineering Services | FTAP-GLOBE ROLLOUT PROJECT: PH... See more | Brgy. San Juan Quezon, Isabela | Rejected | 2025-07-29 15:34:15 | Returned to Applicant | 1. Lease contract agreement/re... See more | |
| 558 | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF LINOM... See more | JONES, ISABELA | Rejected | 2025-07-29 15:48:13 | Returned to Applicant | NO ATTACHED DOCUMENTARY REQUIR... See more | |
| 559 | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF ITBAY... See more | ITBAYAT, BATANES | Rejected | 2025-07-29 15:58:32 | Returned to Applicant | NO UPLOADED CSHP DOCUMENTS | |
| 560 | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF RAE... See more | BATANES | Rejected | 2025-07-29 16:09:06 | Returned to Applicant | NO UPLOADED CSHP DOCUMENTS | |
| 561 | JOHN 6:51 BUILDERS | CONCRTETING OF ROAD | Zone 5, Macababbad St., Annafunan East, Tuguegarao City | Rejected | 2025-07-29 16:17:25 | Returned to Applicant | 1. CSHP application & Prog... See more | |
| 562 | JOHN 6:51 BUILDERS | Rejected | 2025-07-29 16:20:12 | Returned to Applicant | 1. CSHP PROGRAM NOT DULY FILLE... See more | |||
| 563 | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF IMNAJ... See more | BATANES | Rejected | 2025-07-29 16:26:36 | Returned to Applicant | NO UPLOADED CSHP DOCUMENTS | |
| 564 | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF UYUGA... See more | BATANES | Rejected | 2025-07-29 16:35:34 | Returned to Applicant | NO UPLOADED CSHP DOCUMENTS | |
| 565 | DOLE_RO2_2025-07-31_251_3B9Q | GENTEN BUILDERS | REPAIR/REHABILITATION OF STA. ... See more | STA. PRAXEDES | Approved | 2025-07-29 18:05:37 | Ready for Release | Processed in 2 working days. |
| 566 | DOLE_RO2_2025-07-31_252_QWWJ | GENTEN BUILDERS | REPAIR/REHABILITATION OF CLAVE... See more | Claveria, cagayan | Approved | 2025-07-29 18:14:28 | Ready for Release | Processed in 2 working days. |
| 567 | DOLE_RO2_2025-08-01_255_Z3FP | RDJD CONSTRUCTION | CONSTRUCTION OF OVERFLOW BRIDG... See more | BINUANGAN, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-07-30 10:58:39 | Ready for Release | Processed in 2 working days. |
| 568 | DOLE_RO2_2025-08-01_256_EGNT | RDJD CONSTRUCTION | IMPROVEMENT OF BARANGAY INABA... See more | INABAN, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-07-30 11:04:15 | Ready for Release | Processed in 2 working days. |
| 569 | DOLE_RO2_2025-07-31_253_Z9PH | DANDEX CONSTRUCTION | CONSTRUCTION OF SPORTS AND CUL... See more | ALLACAPAN, CAGAYAN | Approved | 2025-07-30 13:16:02 | Ready for Release | Processed in 1 working days. |
| 570 | ATLANTIC CONSTRUCTION | repair/rehabilitation of canan... See more | cabatuan, isabela | Rejected | 2025-07-30 13:44:05 | Returned to Applicant | CSHP TEMPLATE NOT DULY FILLED ... See more | |
| 571 | DOLE_RO2_2025-08-04_257_T1F9 | UPLAND CONSTRUCTION | CONCRETING OF TADYUKONG TO TUP... See more | DULLI, AMBAGUIO, NUEVA VIZCAYA | Approved | 2025-07-30 17:49:04 | Ready for Release | Processed in 3 working days. |
| 572 | DOLE_RO2_2025-07-31_254_WRD9 | REYROSE CONSTRUCTION | CONSTRUCTION OFAND INSTALLATIO... See more | camalaniugan, cagayan | Approved | 2025-07-30 18:01:18 | Ready for Release | Processed in 1 working days. |
| 573 | DOLE_RO2_2025-08-04_258_FSI5 | JHUERS CONSTRUCTION | LGU- DIADI BAC 2025-08 IMPROVE... See more | PUROK 1 LURAD, SITIO NAGTIM-OG, BUGNAY, PUROK 5 DURUAROG AND PUROK 3 NAGSABARAN, DIADI, NUEVA VIZCAYA | Approved | 2025-07-31 08:59:00 | Ready for Release | Processed in 3 working days. |
| 574 | DOLE_RO2_2025-08-04_260_9AEA | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED TELEC... See more | BRGY DUMMUN, GATTARAN, CAGAYAN | Approved | 2025-07-31 10:34:34 | Ready for Release | Processed in 3 working days. |
| 575 | DOLE_RO2_2025-08-04_261_1MAT | RJR'S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | J.PALLAGAO,BAGGAO,CAGAYAN | Approved | 2025-07-31 10:38:59 | Ready for Release | Processed in 3 working days. |
| 576 | DOLE_RO2_2025-08-04_262_A8QI | TAMRHEY CONSTRUCTION | CONSTRUCTION OF SPRING DEVELOP... See more | DOMANG, DUPAX DEL SUR | Approved | 2025-07-31 10:39:11 | Ready for Release | Processed in 3 working days. |
| 577 | DOLE_RO2_2025-08-04_263_L1JI | RJR'S CONSTRUCTION | CONSTRUCTION OF BOX CULVERT AT... See more | HACIENDA-INTAL,BAGGAO,CAGAYAN | Approved | 2025-07-31 10:41:12 | Ready for Release | Processed in 3 working days. |
| 578 | DOLE_RO2_2025-08-04_264_4PJ6 | TAMRHEY CONSTRUCTION | CONSTRUCTION OF CANAL LINING (... See more | DOMANG, DUPAX DEL SUR | Approved | 2025-07-31 10:41:57 | Ready for Release | Processed in 3 working days. |
| 579 | DOLE_RO2_2025-08-04_265_GGK4 | RJR'S CONSTRUCTION | CONCRETING OF ROAD AT TAGUNTUN... See more | TAGUNTUNGAN,BAGGAO,CAGAYAN | Approved | 2025-07-31 10:44:05 | Ready for Release | Processed in 3 working days. |
| 580 | DOLE_RO2_2025-08-04_266_NDYM | TAMRHEY CONSTRUCTION | CONSTRUCTION OF SPRING DEVELOP... See more | LUKIDNON, DUPAX DEL SUR | Approved | 2025-07-31 10:44:15 | Ready for Release | Processed in 3 working days. |
| 581 | DOLE_RO2_2025-08-04_267_YDIK | RJR'S CONSTRUCTION | CONSTRUCTION OF BOX CULVERT AT... See more | HACIENDA-INTAL,BAGGAO,CAGAYAN | Approved | 2025-07-31 10:44:41 | Ready for Release | Processed in 3 working days. |
| 582 | DOLE_RO2_2025-08-04_268_8TBE | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED 45M T... See more | BRGY MAGUIRIG, SOLANA, CAGAYAN | Approved | 2025-07-31 10:57:39 | Ready for Release | Processed in 3 working days. |
| 583 | DOLE_RO2_2025-08-04_259_ZQ4C | MASTER Z CONSTRUCTION SERVICES | INSTALLATION OF ENERGY EFFICI... See more | DOPAJ, DUPAX DEL SUR, NUEVA VIZCAYA | Approved | 2025-07-31 11:40:56 | Ready for Release | Processed in 3 working days. |
| 584 | DOLE_RO2_2025-08-04_269_IX9M | TAMRHEY CONSTRUCTION | CONSTRUCTION OF SLOPE PROTECTI... See more | PALABOTAN, DUPAX DEL SUR, NUEVA VIZCAYA | Approved | 2025-07-31 11:46:22 | Ready for Release | Processed in 3 working days. |
| 585 | DOLE_RO2_2025-08-04_270_HSVM | TAMRHEY CONSTRUCTION | CONCRETING OF ROAD WITH CANAL ... See more | GABUT, DUPAX DEL SUR, NUEVA VIZCAYA | Approved | 2025-07-31 11:49:34 | Ready for Release | Processed in 3 working days. |
| 586 | DOLE_RO2_2025-08-04_271_FG1M | JHUERS CONSTRUCTION | PB-CW-2025-056 COMPLETION/ UPG... See more | CALAOCAN, CABARROGUIS, QUIRINO | Approved | 2025-07-31 12:36:59 | Ready for Release | Processed in 3 working days. |
| 587 | DOLE_RO2_2025-08-04_272_ES2G | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED 45M T... See more | BRGY LANGAGAN, SANCHEZ-MIRA CAGAYAN | Approved | 2025-07-31 13:39:11 | Ready for Release | Processed in 3 working days. |
| 588 | DOLE_RO2_2025-08-04_273_WF5Z | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED 45M T... See more | BRGY BAGU, PAMPLONA, CAGAYAN | Approved | 2025-07-31 14:22:05 | Ready for Release | Processed in 3 working days. |
| 589 | EGB CONSTRUCTION CORPORATION/JP CALDERON CONSTRUCTION AND GENERAL MERCHANDISING | CONSTRUCTION OF SAN PEDRO BRID... See more | MALLIG, ISABELA | Rejected | 2025-07-31 16:46:50 | Returned to Applicant | There are no attached document... See more | |
| 590 | EGB CONSTRUCTION CORPORATION/JP CALDERON CONSTRUCTION AND GENERAL MERCHANDISING | CONSTRUCTION OF SIEMPRE VIVA B... See more | MALLIG, ISABELA | Rejected | 2025-07-31 16:53:35 | Returned to Applicant | There are no attached document... See more | |
| 591 | DOLE_RO2_2025-08-04_274_HEPD | J.R. MALOLOYON DESIGN & CONSTRUCTION | CONSTRUCTION OF COVERED PATHWA... See more | CAUAYAN CITY, ISABELA | Approved | 2025-07-31 16:54:11 | Ready for Release | Processed in 2 working days. |
| 592 | SESE CONSTRUCTION SERVICES | CONCRETING OF SITIO MALAMBAN F... See more | DALAOIG ALCALA CAGAYAN | Rejected | 2025-07-31 17:24:33 | Returned to Applicant | CSHP PROGRAM NOT DULY FILLED O... See more | |
| 593 | DOLE_RO2_2025-08-04_275_UJ3P | EGB CONSTRUCTION CORPORATION/JP CALDERON CONSTRUCTION AND GENERAL MERCHANDISING | CONSTRUCTION OF SIEMPRE VIVA B... See more | MALLIG, ISABELA | Approved | 2025-08-01 10:37:59 | Ready for Release | Processed in 2 working days. |
| 594 | DOLE_RO2_2025-08-04_276_P57F | EGB CONSTRUCTION CORPORATION/JP CALDERON CONSTRUCTION AND GENERAL MERCHANDISING | CONSTRUCTION OF SAN PEDRO BRID... See more | MALLIG, ISABELA | Approved | 2025-08-01 10:41:12 | Ready for Release | Processed in 2 working days. |
| 595 | JKA-Ver Construction and Engineering Services | FTAP-GLOBE ROLLOUT PROJECT | PUROK 4, BRGY STA FELOMINA, ABULOG, CAGAYAN | Rejected | 2025-08-01 14:33:07 | Returned to Applicant | 1. FIRST AIDER CERTIFICATE IS ... See more | |
| 596 | MIG AGGREGATES AND CONCRETE PRODUCTS | IMPROVEMENT OF OFFICE COMPOUND... See more | CALAPANGAN, STO. NIÑO, CAGAYAN | Rejected | 2025-08-01 14:43:53 | Returned to Applicant | he submitted CSHP Program is i... See more | |
| 597 | MIG AGGREGATES AND CONCRETE PRODUCTS | SUPPLY, DELIVERY AND INSTALLAT... See more | CALAPANGAN, STO. NIÑO, CAGAYAN | Rejected | 2025-08-01 14:57:54 | Returned to Applicant | 1. Safety Officer VICTOR JERIC... See more | |
| 598 | MIG AGGREGATES AND CONCRETE PRODUCTS | ESTABLISHMENT OF NURSERY AND W... See more | CALAPANGAN, STO. NIÑO, CAGAYAN | Rejected | 2025-08-01 15:24:23 | Returned to Applicant | The submitted CSHP Program is ... See more | |
| 599 | RJR’S CONSTRUCTION | CONCRETING OF FMR PHASE 2 AT C... See more | CARUPIAN BAGGAO CAGAYAN | Rejected | 2025-08-01 15:46:07 | Returned to Applicant | The CSHP application is jurisd... See more | |
| 600 | DOLE_RO2_2025-08-05_277_MC2X | RJR’S CONSTRUCTION | CONCRETING OF FMR PHASE II AT ... See more | IBULO BAGGAO CAGAYAN | Approved | 2025-08-01 15:50:21 | Ready for Release | Processed in 2 working days. |
| 601 | DOLE_RO2_2025-08-05_278_Y39P | RJR ‘S CONSTRUCTION | Concreting of Fmr phase 2 at s... See more | Sta margarita baggao cagayan | Approved | 2025-08-01 15:53:31 | Ready for Release | Processed in 2 working days. |
| 602 | J.F. GABOTERO, INC. | IMPROVEMENT/EXPANSION OF PASSE... See more | Brgy. Kayvaluganan, Basco, Batanes | Rejected | 2025-08-01 17:02:33 | Returned to Applicant | no application , no cshp progr... See more | |
| 603 | DOLE_RO2_2025-08-06_284_8WTK | MACST CONSTRUCTION AND SUPPLY | IMPROVEMENT OF FMR-PLANAS ROAD... See more | ANTUTOT,KASIBU,NUEVA VIZCAYA | Approved | 2025-08-01 17:02:44 | Ready for Release | Processed in 3 working days. |
| 604 | DOLE_RO2_2025-08-06_285_YN3U | MACST CONSTRUCTION AND SUPPLY | CONSTRUCTION OF STANDARD CHILD... See more | POBLACION, KASIBU,NUEVA VIZCAYA | Approved | 2025-08-01 17:09:58 | Ready for Release | Processed in 3 working days. |
| 605 | DOLE_RO2_2025-08-06_286_YZGR | J.F. GABOTERO, INC. | IMPROVEMENT/ EXPANSION OF PASS... See more | BASCO, BATANES | Approved | 2025-08-01 19:57:24 | Ready for Release | Processed in 3 working days. |
| 606 | CTC Group Inc former Alphateq Inc | Globe Roll-out Project | PH020189-Brgy. Pinaripad Sur, Aglipay, Quirino | Rejected | 2025-08-02 11:11:15 | Returned to Applicant | 1. CSHP Application is not upd... See more | |
| 607 | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED 45M T... See more | BRGY DARAPIDAP, ARITAO, NUEVA VIZCAYA | Rejected | 2025-08-04 08:11:08 | Returned to Applicant | Expired PCAB | |
| 608 | DOLE_RO2_2025-08-06_287_53NE | E.H. MILIO CONSTRUCTION | CONSTRUCTION OF CENTRO BAGLAN ... See more | LUPA, KASIBU,NUEVA VIZCAYA | Approved | 2025-08-04 10:15:42 | Ready for Release | Processed in 2 working days. |
| 609 | DOLE_RO2_2025-08-06_288_1UF9 | E.H. MILIO CONSTRUCTION | IMPROVEMENT OF TADJI-TUKOD ROA... See more | TADJI, KASIBU, NUEVA VIZCAYA | Approved | 2025-08-04 10:22:49 | Ready for Release | Processed in 2 working days. |
| 610 | DOLE_RO2_2025-08-05_279_HR2Q | CAVAT CAPITOL MERCHANDISING AND CONSTRUCTION | ITB# - 2025-41: Concreting of ... See more | Carilucud. Solana, Cagayan | Approved | 2025-08-04 10:37:04 | Ready for Release | Processed in 1 working days. |
| 611 | DOLE_RO2_2025-08-05_280_BFDK | TECKCON CONSTRUCTION | IB#-2025-44: CONSTRUCTION OF F... See more | FURAGUI, SOLANA, CAGAYAN | Approved | 2025-08-04 10:41:37 | Ready for Release | Processed in 1 working days. |
| 612 | DOLE_RO2_2025-08-05_281_2WXV | RJR'S CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | CARUPIAN , BAGGAO, CAGAYAN | Approved | 2025-08-04 16:27:52 | Ready for Release | Processed in 1 working days. |
| 613 | DOLE_RO2_2025-08-06_289_GQRQ | TAMRHEY CONSTRUCTION | CONCRETING OF ROAD AT PARAI (P... See more | PUROK RIVERSIDE PARAI, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-08-05 09:15:28 | Ready for Release | Processed in 1 working days. |
| 614 | sample | 24BO23213 | ISABELA | Rejected | 2025-08-05 09:27:37 | Returned to Applicant | sample | |
| 615 | TAMRHEY CONSTRUCTION | IMPROVEMENT OF PUROK MACATE FT... See more | MACABENGA,DUPAX DEL NORTE,NUEVA VIZCAYA | Rejected | 2025-08-05 10:55:59 | Returned to Applicant | The applicant is Tamrhey Const... See more | |
| 616 | BELANCE BUILDERS & TRADING | IMPROVEMENT OF PUROK MACATE FT... See more | MACABENGA,DUPAX DEL NORTE,NUEVA VIZCAYA | Rejected | 2025-08-05 11:11:42 | Returned to Applicant | Change Safety Officer and Firs... See more | |
| 617 | BELANCE BUILDERS & TRADING | IMPROVEMENT OF PUROK MACATE FT... See more | MACABENGA, DUPAX DEL NORTE,NUEVA VIZCAYA | Rejected | 2025-08-05 12:45:07 | Returned to Applicant | Change First Aider and Safety ... See more | |
| 618 | DOLE_RO2_2025-08-06_290_FYGW | JKA-Ver Construction and Engineering Services | FTAP-GLOBE ROLLOUT PROJECT | PUROK 4, BRGY STA FELOMINA, ABULOG, CAGAYAN | Approved | 2025-08-05 14:27:01 | Ready for Release | Processed in 1 working days. |
| 619 | DOLE_RO2_2025-08-12_297_AXED | TAMRHEY CONSTRUCTION | CONCRETING OF ROAD AT PUROK RI... See more | PUROK RIVERSIDE, PARAI, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-08-05 15:36:52 | Ready for Release | Processed in 6 working days. |
| 620 | DOLE_RO2_2025-08-12_298_DSH9 | BELANCE BUILDERS & TRADING | IMPROVEMENT OF PUROK MACATE FT... See more | MACABENGA, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-08-05 15:42:35 | Ready for Release | Processed in 5 working days. |
| 621 | J.F. GABOTERO, INC. | IMPROVEMENT/ EXPANSION OF PASS... See more | BASCO, BATANES | Rejected | 2025-08-05 16:42:25 | Returned to Applicant | double entry | |
| 622 | Markathella Construction | Repair/Improvement of Comfort ... See more | Nueva Vizcaya State University, Bayombong, Nueva Vizcaya | Rejected | 2025-08-06 09:55:17 | Returned to Applicant | incomplete documents. | |
| 623 | DOLE_RO2_2025-08-07_291_MJ08 | CREST92 Construction & Development Corporation | Concreting of Road along Zone ... See more | Gosi Norte, Tuguegarao City, Cagayan | Approved | 2025-08-06 09:55:52 | Ready for Release | Processed in 1 working days. |
| 624 | J.F. GABOTERO, INC. | REHABILITATION OF POWER HOUSE ... See more | BASCO, BATANES | Rejected | 2025-08-06 11:48:41 | Returned to Applicant | expired NC2 of heavy equipment... See more | |
| 625 | BHM CONSTRUCTION | Improvement of Potable Water S... See more | Cabarroguis, Quirino | Rejected | 2025-08-06 12:18:18 | Returned to Applicant | 1. Application Forms and CSHP ... See more | |
| 626 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 4CALANT... See more | CALANTAC, ALCALA, CAGAYAN | Rejected | 2025-08-06 12:34:01 | Returned to Applicant | CHE TESTING ABOUT TO EXPIRE, A... See more | |
| 627 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF AFUSING DAGA... See more | AFUSING DAGA, ALCALA, CAG | Rejected | 2025-08-06 12:50:25 | Returned to Applicant | CHE TESTING CERTIFICATE IS ABO... See more | |
| 628 | DOLE_RO2_2025-08-07_292_47WE | REYROSE CONSTRUCTION | CONSTRUCTION OF VERTICAL NICHE... See more | camalaniugan, cagayan | Approved | 2025-08-06 13:38:49 | Ready for Release | Processed in 1 working days. |
| 629 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF AFUSING DAGA... See more | AFUSING DAGA, ALCALA, CAG | Rejected | 2025-08-06 14:28:25 | Returned to Applicant | CHE TESTING CERTIFICATE IS ABO... See more | |
| 630 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF TUPANG CENTR... See more | TUPANG, ALCALA, CAGAYAN | Rejected | 2025-08-06 14:32:54 | Returned to Applicant | CHE TESTING CERTIFICATE IS ABO... See more | |
| 631 | RL MALIONES CONSTRUCTION | CONSTRUCTION OF LAMO COVERED C... See more | BRGY. LAMO, DUPAX DEL NORTE, NUEVA VIZCAYA | Rejected | 2025-08-06 14:36:08 | Returned to Applicant | NO ATTACHMENTS AND TEMPLATE | |
| 632 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 1 AFUSI... See more | AFUSING DAGA, ALCALA, CAG | Rejected | 2025-08-06 14:38:20 | Returned to Applicant | CHE TESTING CERTIFICATE IS ABO... See more | |
| 633 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 1 PARED... See more | PARED, ALCALA, CAGAYAN | Rejected | 2025-08-06 14:43:35 | Returned to Applicant | CHE TESTING CERTIFICATE ABOUT ... See more | |
| 634 | VB GINES CONSTRUCTION | CONSTRUCTION OF WATER TANKS AN... See more | BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-08-06 15:05:43 | Returned to Applicant | PCAB NO SIGNATURE | |
| 635 | 3JMS CONSTRUCTION | PROPOSED TWO STOREY APARTMENT | UGAC SUR, TUGUEGARAO CITY | Rejected | 2025-08-06 15:10:07 | Returned to Applicant | 1.0 No submitted sogned statem... See more | |
| 636 | VB GINES CONSTRUCTION | CONSTRUCTION OF WATER TANKS AN... See more | BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-08-06 15:24:11 | Returned to Applicant | PCAB NO SIGNATURE | |
| 637 | DOLE_RO2_2025-08-12_299_CUNJ | RL MALIONES CONSTRUCTION | CONSTRUCTION OF LAMO COVERED C... See more | BRGY. LAMO, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-08-06 15:27:59 | Ready for Release | Processed in 5 working days. |
| 638 | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF IMNAJ... See more | BATANES | Rejected | 2025-08-06 15:37:41 | Returned to Applicant | No uploaded CSHP documents | |
| 639 | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF UYUGA... See more | BATANES | Rejected | 2025-08-06 15:43:28 | Returned to Applicant | No uploaded CSHP documents | |
| 640 | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF RAELE... See more | BATANES | Rejected | 2025-08-06 15:49:33 | Returned to Applicant | No uploaded CSHP documents | |
| 641 | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF ITBAY... See more | BATANES | Rejected | 2025-08-06 16:12:23 | Returned to Applicant | No uploaded CSHP documents | |
| 642 | DOLE_RO2_2025-08-08_293_PTCY | SE-SE CONSTRUCTION SERVICES | REHABILITATION OF AGANI SWIP-D... See more | AGANI ALCALA CAGAYAN | Approved | 2025-08-06 17:16:44 | Ready for Release | Processed in 2 working days. |
| 643 | DOLE_RO2_2025-08-08_294_1X4C | SE-SE CONSTRUCTION SERVICES | REHABILITATION OF CABARUAN ROA... See more | PINOPOC ALCALA CAGAYAN | Approved | 2025-08-06 17:25:27 | Ready for Release | Processed in 2 working days. |
| 644 | DOLE_RO2_2025-08-08_295_WH9C | SE-SE CONSTRUCTION SERVICES | CONCRETING OF SITIO MALAMBAN F... See more | DALAOIG ALCALA CAGAYAN | Approved | 2025-08-06 17:44:54 | Ready for Release | Processed in 2 working days. |
| 645 | Lancesoft Infra Solution Inc | E02878 B06 / NS-TER24 B113 | HT MP1 BRGY LUBLUB POBLACION ALFONSO CASTANEDA NUEVA VIZCAYA | Rejected | 2025-08-07 10:15:11 | Returned to Applicant | Completed Project | |
| 646 | Lancesoft Infra Solution Inc | E02911-B05 / NS-NTG23-I44 | ZONE 2, BRGY. CALITLITAN, ARITAO, NUEVA VIZCAYA | Rejected | 2025-08-07 10:18:46 | Returned to Applicant | Completed Project | |
| 647 | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | PH020191-CME-45m, 24sqm, 320kp... See more | SAGUDAY QUIRINO | Rejected | 2025-08-07 10:57:31 | Returned to Applicant | Please attached first Aider ID... See more | |
| 648 | SE-SE CONSTRUCTION SERVICES | REHABILITATION OF MADUPPAPA FM... See more | DALAOIG ALCALA CAGAYAN | Rejected | 2025-08-07 12:01:39 | Returned to Applicant | . 7.1 - PLEASE ATTACHED SAMPLE... See more | |
| 649 | DOLE_RO2_2025-08-08_296_LLL9 | JKAVer Construction and Engineering Services | FTAP-GLOBE ROLLOUT PROJECT: PH... See more | Brgy. San Juan Quezon, Isabela | Approved | 2025-08-07 12:01:57 | Ready for Release | Processed in 1 working days. |
| 650 | VB GINES CONSTRUCTION | UPGRADING OF N.V. BENGUET JCT.... See more | KAYAPA,NUEVA VIZCAYA | Rejected | 2025-08-07 12:32:00 | Returned to Applicant | USIGNED PCAB | |
| 651 | YSIDRA CONSTRUCTION INC. | Construction of 1 Box Culvert ... See more | Agaman Norte, Baggao Cagayan | Rejected | 2025-08-07 12:46:26 | Returned to Applicant | 1. CSHP application (page2) mi... See more | |
| 652 | YSIDRA CONSTRUCTION INC. | Construction of 1 Box Culvert ... See more | Rejected | 2025-08-07 14:16:00 | Returned to Applicant | 1. NO SIGNATURE OF THE AUTHORI... See more | ||
| 653 | 3JMS CONSTRUCTION | PROPOSED TWO STOREY APARTMENT | UGAC SUR, TUGUEGARAO CITY | Rejected | 2025-08-07 14:59:31 | Returned to Applicant | 1. UNDER 7.1 OF CSHP TEMPLATE ... See more | |
| 654 | DOLE_RO2_2025-08-18_316_T1LZ | DAWNBUILDERS CONSTRUCTION CORP. | Construction of 45 meters 3-Le... See more | Brgy. Comon, Aritao, Nueva Vizcaya (16.2643°,121.0422°) | Approved | 2025-08-07 15:10:26 | Ready for Release | Processed in 7 working days. |
| 655 | W.S FAGCANGAN CONSTRUCTION MANAGEMENT SERVICES | Improvement of VGH Gymnasium a... See more | San Jose, Baggao, Cagayan | Rejected | 2025-08-07 15:33:17 | Returned to Applicant | NOT PROPERLY FILLED OUT FORMS ... See more | |
| 656 | DEKM CONSTRUCTION | Completion of Masisit Elementa... See more | Sitio Masisit, Asassi, Baggao, Cagayan | Rejected | 2025-08-07 16:12:36 | Returned to Applicant | NOT PROPERLY FILLED OUT FORM | |
| 657 | CTC Group Inc former Alphateq Inc | Globe Roll-out Project | PH020189-Brgy. Pinaripad Sur, Aglipay, Quirino | Rejected | 2025-08-07 21:25:31 | Returned to Applicant | Please follows the orders of r... See more | |
| 658 | DOLE_RO2_2025-08-18_317_WX9C | RA AGUILAR CONSTRUCTION SERVICES CORP | INSTALLATION OF 3-LEGGED 45M T... See more | BRGY DARAPIDAP, ARITAO, NUEVA VIZCAYA | Approved | 2025-08-08 07:56:59 | Ready for Release | Processed in 7 working days. |
| 659 | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF LINOM... See more | ISABELA | Rejected | 2025-08-08 08:56:29 | Returned to Applicant | 1. NO NOTICE OF AWARD FROM PRO... See more | |
| 660 | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF DUMAW... See more | ISABELA | Rejected | 2025-08-08 09:01:49 | Returned to Applicant | EXPIRED NCII CARPENTRY 2. NO N... See more | |
| 661 | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF STO D... See more | ISABELA | Rejected | 2025-08-08 09:08:17 | Returned to Applicant | NO NCII SCAFFOLDING | |
| 662 | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF RAELE... See more | BATANES | Rejected | 2025-08-08 09:14:27 | Returned to Applicant | No uploaded CSHP documents | |
| 663 | LAB GENERAL ENGINEERING | REPAIR/REHABILITION OF IMNAJBU... See more | BATANES | Rejected | 2025-08-08 09:19:18 | Returned to Applicant | SO2 and SA same person | |
| 664 | DOLE_RO2_2025-08-14_305_04XO | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF UYUGA... See more | BATANES | Approved | 2025-08-08 09:23:54 | Ready for Release | Processed in 4 working days. |
| 665 | DOLE_RO2_2025-08-14_306_OFRY | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF ITBAY... See more | BATANES | Approved | 2025-08-08 09:27:51 | Ready for Release | Processed in 4 working days. |
| 666 | DOLE_RO2_2025-08-12_300_URDS | 3JMS CONSTRUCTION | PROPOSED TWO STOREY APARTMENT | UGAC SUR, TUGUEGARAO CITY | Approved | 2025-08-08 15:05:24 | Ready for Release | Processed in 3 working days. |
| 667 | DOLE_RO2_2025-08-12_301_3TZ2 | MIG AGGREGATES AND CONCRETE PRODUCTS | IMPROVEMENT OF OFFICE COMPOUND... See more | CALAPANGAN, STO. NIÑO, CAGAYAN | Approved | 2025-08-08 15:17:09 | Ready for Release | Processed in 3 working days. |
| 668 | DOLE_RO2_2025-08-12_302_ASFR | MIG AGGREGATES AND CONCRETE PRODUCTS | SUPPLY, DELIVERY AND INSTALLAT... See more | CALAPANGAN, STO. NIÑO, CAGAYAN | Approved | 2025-08-08 15:30:20 | Ready for Release | Processed in 3 working days. |
| 669 | DOLE_RO2_2025-08-12_303_O60E | MIG AGGREGATES AND CONCRETE PRODUCTS | ESTABLISHMENT OF NURSERY AND W... See more | CALAPANGAN, STO. NIÑO, CAGAYAN | Approved | 2025-08-08 15:33:10 | Ready for Release | Processed in 3 working days. |
| 670 | DOLE_RO2_2025-08-12_304_IFSU | SESE CONSTRUCTION SERVICES | REHABILITATION OF MADUPPAPA FM... See more | CABULUAN ALCALA CAGAYAN | Approved | 2025-08-08 16:33:25 | Ready for Release | Processed in 2 working days. |
| 671 | DOLE_RO2_2025-08-14_307_6T9H | W.S FAGCANGAN CONSTRUCTION MANAGEMENT SERVICES | Improvement of VGH Gymnasium a... See more | San Jose, Baggao, Cagayan | Approved | 2025-08-11 11:33:34 | Ready for Release | Processed in 3 working days. |
| 672 | DOLE_RO2_2025-08-14_308_0GDO | DKB CONSTRUCTION | Construction of 2 Classroom at... See more | Poblacion, Baggao, Cagayan | Approved | 2025-08-11 11:50:47 | Ready for Release | Processed in 3 working days. |
| 673 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 4 CALAN... See more | ZONE 4 CALANTAC FMR, AT CALANTAC, ALCALA, CAGAYAN | Rejected | 2025-08-11 13:14:59 | Returned to Applicant | REFER TO 7.1: RESPONSIBLE FOR ... See more | |
| 674 | DOLE_RO2_2025-08-19_322_FTMW | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF AFUSING DAGA... See more | AFUSING DAGA, ALCALA, CAG | Approved | 2025-08-11 13:22:52 | Ready for Release | Processed in 6 working days. |
| 675 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 1 PARED... See more | PARED, ALCALA, CAGAYAN | Rejected | 2025-08-11 13:34:43 | Returned to Applicant | REFER TO 20.0: EMERGENCY PREP... See more | |
| 676 | DOLE_RO2_2025-08-14_309_OHZZ | Markathella Construction | Repair/Improvement of Comfort ... See more | Nueva Vizcaya State University, Bayombong, Nueva Vizcaya | Approved | 2025-08-11 13:38:36 | Ready for Release | Processed in 3 working days. |
| 677 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF AFUSING DAGA... See more | AFUSING DAGA, ALCALA, CAGAYAN | Rejected | 2025-08-11 14:13:51 | Returned to Applicant | DOUBLE ENTRY | |
| 678 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF TUPANG CENTR... See more | TUPANG, ALCALA, CAGAYAN | Rejected | 2025-08-11 14:20:57 | Returned to Applicant | REFER TO 20.0: EMERGENCY PREPA... See more | |
| 679 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 1 AFUSI... See more | AFUSING DAGA, ALCALA, CAGAYAN | Rejected | 2025-08-11 14:30:05 | Returned to Applicant | REFER TO 20.0: EMERGENCY PREPA... See more | |
| 680 | DOLE_RO2_2025-08-14_310_PE70 | J.F. GABOTERO, INC. | REHABILITATION OF POWER HOUSE ... See more | BASCO, BATANES | Approved | 2025-08-11 16:56:11 | Ready for Release | Processed in 3 working days. |
| 681 | DOLE_RO2_2025-08-14_311_OXCE | 8J BUILDERS AND SUPPLY | PB-CW-2025-009, IMPROVEMENT/CO... See more | VILLA JOSE YLANAN, MADDELA, QUIRINO | Approved | 2025-08-12 08:26:00 | Ready for Release | Processed in 3 working days. |
| 682 | 8J BUILDERS AND SUPPLY | PB-CW-2025-009, IMPROVEMENT/CO... See more | VILLA JOSE YLANAN, MADDELA, QUIRINO | Rejected | 2025-08-12 08:30:21 | Returned to Applicant | Duplicate Application | |
| 683 | DOLE_RO2_2025-08-19_321_7CAT | DEKM CONSTRUCTION | Completion of Masisit Elementa... See more | San Jose, Baggao, Cagayan | Approved | 2025-08-12 09:10:54 | Ready for Release | Processed in 5 working days. |
| 684 | DOLE_RO2_2025-08-19_323_GQP3 | RJR'S CONSTRUCTION | Procurement of Repair of River... See more | remus , BAGGAO, CAGAYAN | Approved | 2025-08-12 09:29:06 | Ready for Release | Processed in 6 working days. |
| 685 | DULCA CONSTRUCTION SERVICES | 2024-16i: IMPROVEMENT OF MINI-... See more | NUEVA VIZCAYA STATE UNIVERSITY, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-08-12 09:51:07 | Returned to Applicant | Completed Project | |
| 686 | DOLE_RO2_2025-08-14_312_X72I | WINLEI CONSTRUCTION AND SUPPLY | CONSTRUCTION OF TEMPORARY LEAR... See more | MATAGA-AY ELEMENTARY SCHOOL, JOSE ANCHETA, MADDELA QUIRINO AND SAN MANUEL INTEGRATED SCHOOL BUILDING 1 AND 2 SAN MANUEL, AGLIPAY, QUIRINO. | Approved | 2025-08-12 11:59:21 | Ready for Release | Processed in 2 working days. |
| 687 | DOLE_RO2_2025-08-14_313_1S2Q | KNB CONSTRUCTION | REPAIR AND REHABILITATION OF C... See more | CAUAYAN CITY ISABELA | Approved | 2025-08-12 12:59:34 | Ready for Release | Processed in 2 working days. |
| 688 | DOLE_RO2_2025-08-14_314_GXPY | KNB CONSTRUCTION | REPAIR/REHABILITATION OF NAGUI... See more | NAGUILIAN ISABELA | Approved | 2025-08-12 13:15:31 | Ready for Release | Processed in 2 working days. |
| 689 | DOLE_RO2_2025-08-14_315_PYLX | KNB CONSTRUCTION | HARANA BARANGAY HEALTH STATION... See more | LUNA ISABELA | Approved | 2025-08-12 13:25:51 | Ready for Release | Processed in 2 working days. |
| 690 | KNB CONSTRUCTION | REPAIR/REHABILITATION OF ITBUD... See more | UYUGAN BATANES | Rejected | 2025-08-12 13:43:00 | Returned to Applicant | The CSHP application is jurisd... See more | |
| 691 | KNB CONSTRUCTION | REPAIR/REHABILITATION OF MAHAT... See more | MAHATAO BATANES | Rejected | 2025-08-12 13:46:57 | Returned to Applicant | The CSHP application is jurisd... See more | |
| 692 | KNB CONSTRUCTION | REPAIR/REHABILITATION OF PANAT... See more | MAHATAO BATANES | Rejected | 2025-08-12 13:50:38 | Returned to Applicant | The CSHP application is jurisd... See more | |
| 693 | DOLE_RO2_2025-08-19_324_BZET | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 4 CALAN... See more | CALANTAC, ALCALA, CAGAYAN | Approved | 2025-08-12 14:08:21 | Ready for Release | Processed in 5 working days. |
| 694 | DOLE_RO2_2025-08-19_325_7RK6 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF AFUSING DAGA... See more | AFUSING DAGA, ALCALA, CAG | Approved | 2025-08-12 14:11:51 | Ready for Release | Processed in 5 working days. |
| 695 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF TUPANG- CENT... See more | TUPANG, ALCALA, CAG | Rejected | 2025-08-12 14:13:57 | Returned to Applicant | DOUBLE ENTRY | |
| 696 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 1 AFUS... See more | AFUSING, DAGA, ALCALA, CAGAYAN | Rejected | 2025-08-12 14:20:52 | Returned to Applicant | DOUBLE ENTRY | |
| 697 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 1 PARE... See more | PARED, ALCALA, CAGAYAN | Rejected | 2025-08-12 14:25:00 | Returned to Applicant | DOUBLE ENTRY | |
| 698 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF AFUSING DAG... See more | AFUSING DAGA, ALCALA, CAGAYAN | Rejected | 2025-08-12 14:29:03 | Returned to Applicant | DOUBLE ENTRY | |
| 699 | PRIMITIVO P. ESLABON CONSTRUCTION AND HARDWARE | IMPROVEMENT OF MUNICIPAL PARK ... See more | ALLACAPAN, CAGAYAN | Rejected | 2025-08-12 19:37:13 | Returned to Applicant | Completed project | |
| 700 | Kyle MKZ Construction | IMPROVEMENT OF FMR (BESSANG-NA... See more | DIDIPIO, KASIBU, NUEVA, VIZCAYA | Rejected | 2025-08-13 09:10:30 | Returned to Applicant | Finish Project Unsigned and E... See more | |
| 701 | DOLE_RO2_2025-08-18_318_R7OV | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | PH020225-CME-45m, 24sqm, 320kp... See more | CORDON ISABELA | Approved | 2025-08-13 13:26:24 | Ready for Release | Processed in 3 working days. |
| 702 | DOLE_RO2_2025-08-18_319_AJ7N | UNDERGROUND TECHNOLOGIES INC. | Proposed Hand-holes and Direct... See more | SOLANO MUNICIPAL ENGINEERING OFFICE | Approved | 2025-08-13 15:02:48 | Ready for Release | Processed in 3 working days. |
| 703 | JPLC TRADING | 2025-24-HO-COB-01; SUPPLY, DEL... See more | NIA – MARIIS HEAD OFFICE | Rejected | 2025-08-14 08:45:04 | Returned to Applicant | 1. application form and cshp t... See more | |
| 704 | ATLANTIC CONSTRUCTION | resealing of runway cracks and... See more | tuguegarao city, cagayan | Rejected | 2025-08-14 14:02:56 | Returned to Applicant | Please reapply. Location of th... See more | |
| 705 | ATLANTIC CONSTRUCTION | repair/rehabilitation of canan... See more | cabatuan, isabela | Rejected | 2025-08-14 14:06:46 | Returned to Applicant | CSHP TEMPLATE NOT DULY FILLED ... See more | |
| 706 | DOLE_RO2_2025-08-18_320_YWAX | RL MALIONES CONSTRUCTION | CONSTRUCTION OF LAMO COVERED C... See more | BRGY. LAMO, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-08-15 08:30:52 | Ready for Release | Processed in 2 working days. |
| 707 | BHM CONSTRUCTION | Improvement of Potable Water S... See more | Cabarroguis, Quirino | Rejected | 2025-08-15 09:29:20 | Returned to Applicant | COMPLETED/FINISHED PROJECT | |
| 708 | DOLE_RO2_2025-08-19_326_U9ID | YSIDRA CONSTRUCTION INC. | Construction of 1 Box Culvert ... See more | Agaman Norte, Baggao Cagayan | Approved | 2025-08-15 11:30:12 | Ready for Release | Processed in 3 working days. |
| 709 | JS AND ASSOCIATES CONSTRUCTION AND DEVELOPMENT, INC. | PH020192 | BRGY VILLA QUIRINO, BAGABAG, NUEVA VIZCAYA | Rejected | 2025-08-15 14:00:42 | Returned to Applicant | KINDLY USE THE PRESCRIBED TEMP... See more | |
| 710 | BEGAL DESIGN AND CONSTRUCTION | UPGRADING OF 1.82 KM BELANCE- ... See more | DUPAX DEL NORTE, NUEVA VIZCAYA | Rejected | 2025-08-16 11:22:12 | Returned to Applicant | NEEDS ADDITIONAL SAFETY OFFICE... See more | |
| 711 | DOLE_RO2_2025-08-19_327_GJ3R | 4 KIDS BUILDERS AND CONSTRUCTION SUPPLY | CONCRETING OF FARM TO MARKET R... See more | DUPAX DEL SUR, NUEVA VIZCAYA | Approved | 2025-08-16 11:28:10 | Ready for Release | Processed in 2 working days. |
| 712 | DOLE_RO2_2025-08-19_328_QTNT | BEGAL DESIGN AND CONSTRUCTION | UPGRADING OF 1.82 KM BELANCE- ... See more | DUPAX DEL SUR, NUEVA VIZCAYA | Approved | 2025-08-16 11:32:24 | Ready for Release | Processed in 2 working days. |
| 713 | ATLANTIC CONSTRUCTION | resealing of runway cracks and... See more | tuguegarao city, cagayan | Rejected | 2025-08-18 08:16:12 | Returned to Applicant | REFER TO CSHP TEMPLATE: xii - ... See more | |
| 714 | BALLIGI CONSTRUCTION AND DEVELOPMENT CORPORATION | Construction of AFPSLAI Office... See more | Maharlika Highway, Caggay, Tuguegarao, Cagayan | Rejected | 2025-08-18 09:02:30 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 715 | DOLE_RO2_2025-08-19_329_805K | SE-SE CONSTRUCTION SERVICES | IMPROVEMENT OF INTEGRATED SCHO... See more | MARABURAB ALCALA CAGAYAN | Approved | 2025-08-18 09:13:56 | Ready for Release | Processed in 2 working days. |
| 716 | DOLE_RO2_2025-08-19_330_RRF1 | SE-SE CONSTRUCTION SERVICES | CONSTRUCTION OF MULTIPURPOSE G... See more | CENTRO SUR ALCALA CAGAYAN | Approved | 2025-08-18 09:21:13 | Ready for Release | Processed in 2 working days. |
| 717 | JHUERS CONSTRUCTION | PB-CW-2025-026 CONSTRUCTION/CO... See more | SAN PEDRO, MADDELA, QUIRINO | Rejected | 2025-08-18 09:40:24 | Returned to Applicant | Safety Officer with ongoing pr... See more | |
| 718 | Power Check Enterprises | PH020193_Tesorio's Lot | Purok 3, Brgy. Palacian, Aglipay, Quirino | Rejected | 2025-08-18 11:13:29 | Returned to Applicant | 1. CSHP program not duly fille... See more | |
| 719 | WERR CORPORATION INTERNATIONAL | CONSTRUCTION OF WELCOME ARCH | Maddarulug Norte, Enrile, Cagayan | Rejected | 2025-08-18 11:14:47 | Returned to Applicant | PLEASE REFER TO CSHP TEMPLATE:... See more | |
| 720 | WERR CORPORATION INTERNATIONAL | CONSTRUCTION OF WELCOME ARCH | Maddarulug Norte, Enrile, Cagayan | Rejected | 2025-08-18 12:28:12 | Returned to Applicant | PLEASE REFER TO CSHP TEMPLATE:... See more | |
| 721 | DOLE_RO2_2025-08-19_331_KFQ4 | UNDERGROUND TECHNOLOGIES INC. | Proposed Hand-holes and Direct... See more | VILLAVERDE MUNICIPAL ENGINEERING OFFICE | Approved | 2025-08-18 13:26:45 | Ready for Release | Processed in 1 working days. |
| 722 | DOLE_RO2_2025-08-19_332_Q436 | Power Check Enterprises | PH020193_Tesorio's Lot | Purok 3, Brgy. Palacian, Aglipay, Quirino | Approved | 2025-08-18 13:30:50 | Ready for Release | Processed in 1 working days. |
| 723 | TOP VISION DESIGN AND CONSTRUCTION SERVICES | REPAIR OF 6 CLASSROOMS AT ATUL... See more | ATULAYAN,TUGUEGARAO CITY | Rejected | 2025-08-18 13:47:10 | Returned to Applicant | Completed Project | |
| 724 | FULRUBELL CORPORATION | FTAP ROLOUT PROJECT | Mallig, Isabela | Rejected | 2025-08-18 16:16:17 | Returned to Applicant | Completed project | |
| 725 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 1 AFUSI... See more | AFUSING DAGA, ALCALA, CAG | Rejected | 2025-08-19 10:59:01 | Returned to Applicant | 1. Expired Testing Certificate... See more | |
| 726 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 1 PARED... See more | PARED, ALCALA, CAGAYAN | Rejected | 2025-08-19 11:05:16 | Returned to Applicant | 1.The submitted certificate of... See more | |
| 727 | DOLE_RO2_2025-08-19_333_VIXX | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF AFUSING DAGA... See more | AFUSING DAGA, ALCALA, CAGAYAN | Approved | 2025-08-19 11:11:58 | Ready for Release | Processed in 1 working days. |
| 728 | DOLE_RO2_2025-08-19_334_83V5 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF TUPANG CENTR... See more | TUPANG, ALCALA, CAGAYAN | Approved | 2025-08-19 11:19:13 | Ready for Release | Processed in 1 working days. |
| 729 | DOLE_RO2_2025-08-19_335_7O8F | EVERMOUNT CONSTRUCTION CORPORATION | 4PH PUEBLO DE CAUAYAN | BY PASS ROAD SAN FERMIN, CAUAYAN CITY, ISABELA | Approved | 2025-08-19 12:20:12 | Ready for Release | Processed in 1 working days. |
| 730 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONTINUATION OF CONCRETING ZON... See more | AT PIGGATAN, ALCALA, CAGAYAN | Rejected | 2025-08-19 13:32:55 | Returned to Applicant | No attached Certificate of Tes... See more | |
| 731 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF MINANGA TEJA... See more | ABBEG, ALCALA, CAGAYAN | Rejected | 2025-08-19 13:52:38 | Returned to Applicant | No attached Certificate of Tes... See more | |
| 732 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF DAMMANG ALOG... See more | AFUSING DAGA, ALCALA, CAGAYAN | Rejected | 2025-08-19 13:59:23 | Returned to Applicant | No attached Certificate of Tes... See more | |
| 733 | DOLE_RO2_2025-08-26_336_OSAP | A&J DESIGNS AND CONSTRUCTION | REPAIR/REHABILITATION OF PLGU ... See more | NUEVA VIZCAYA STATE UNIVERSITY- BAMBANG CAMPUS | Approved | 2025-08-19 15:17:47 | Ready for Release | Processed in 5 working days. |
| 734 | DOLE_RO2_2025-08-26_337_9RBZ | GCPK CONSTRUCTION AND SUPPLY | REAPAIR AND REHABILITATIUON OF... See more | PARDO ELEMENTARY SCHOOL, TUGUEGARAO CITY | Approved | 2025-08-19 15:42:05 | Ready for Release | Processed in 5 working days. |
| 735 | DOLE_RO2_2025-08-26_338_GJCZ | GCPK CONSTRUCTION AND SUPPLY | REAPAIR AND REHABILITATIUON OF... See more | PALLUA ELEMENTARY SCHOOL, TUGUEGARAO CITY | Approved | 2025-08-19 16:03:09 | Ready for Release | Processed in 5 working days. |
| 736 | DOLE_RO2_2025-08-26_339_R2OW | RDJD CONSTRUCTION | CONSTRUCTION AND INSTALLATION ... See more | INABAN, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-08-19 16:17:08 | Ready for Release | Processed in 5 working days. |
| 737 | DOLE_RO2_2025-08-26_340_1J0E | RDJD CONSTRUCTION | ONSTRUCTION AND INSTALLATION O... See more | OYAO, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-08-19 16:19:50 | Ready for Release | Processed in 5 working days. |
| 738 | 4 KIDS BUILDERS AND CONSTRUCTION SUPPLY | CONCRETING OF FARM TO MARKET R... See more | DUPAX DEL SUR, NUEVA VIZCAYA | Rejected | 2025-08-19 16:29:44 | Returned to Applicant | DUPLICATE | |
| 739 | M & F ENTERPRISE | OPENING AND IMPROVEMENT OF DU... See more | BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-08-19 16:34:58 | Returned to Applicant | a. The designated First Aider ... See more | |
| 740 | DOLE_RO2_2025-08-26_341_LQJS | Kyle MKZ Construction | IMPROVEMENT OF FMR (BESSANG-NA... See more | DIDIPIO, KASIBU, NUEVA, VIZCAYA | Approved | 2025-08-20 07:41:10 | Ready for Release | Processed in 5 working days. |
| 741 | SAN JACINTO CONSTRUCTION SERVICES AND GENERAL MERCHANDISING | Renovation of Ground floor com... See more | Municipal Government Center, Brgy. II, Enrile Cagayan | Rejected | 2025-08-20 09:36:38 | Returned to Applicant | PLEASE REFER TO CSHP TEMPLATE:... See more | |
| 742 | DOLE_RO2_2025-08-29_361_TWYV | LAB GENERAL ENGINEERING | REPAIR/REHABILITION OF IMNAJBU... See more | BATANES | Approved | 2025-08-20 09:36:53 | Ready for Release | Processed in 8 working days. |
| 743 | DOLE_RO2_2025-08-29_362_M2JC | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF RAELE... See more | BATANES | Approved | 2025-08-20 09:42:16 | Ready for Release | Processed in 8 working days. |
| 744 | Terrainshaper Construction & Enterprise | Construction of 45M 3-Legged S... See more | BRGY.CABUNBATA, ISABELLA CITY, BASILAN | Rejected | 2025-08-20 10:25:04 | Returned to Applicant | Please reapply. Location of th... See more | |
| 745 | DOLE_RO2_2025-08-26_342_29GH | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | PH020191-CME-45m, 24sqm, 320kp... See more | SAGUDAY QUIRINO | Approved | 2025-08-20 10:28:46 | Ready for Release | Processed in 4 working days. |
| 746 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 1 AFUSI... See more | AFUSING DAGA, ALCALA, CAG | Rejected | 2025-08-20 13:52:52 | Returned to Applicant | The Testing Certificate of the... See more | |
| 747 | A.P BOISER CONSTRUCTION AND SUPPLY | Proposed CME-45m, 24sqm, 320kp... See more | PH020194 BRGY. AGUIAGUICAN, GATTARAN, CAGAYAN | Rejected | 2025-08-20 14:07:58 | Returned to Applicant | PLEASE REFER TO CSHP TEMPLATE:... See more | |
| 748 | A.P BOISER CONSTRUCTION AND SUPPLY | Proposed CME-45m, 24sqm, 320kp... See more | PH020220 ZONE 5, BRGY. PADDAYA, APPARI, CAGAYAN | Rejected | 2025-08-20 14:14:00 | Returned to Applicant | PLEASE REFER TO CSHP TEMPLATE:... See more | |
| 749 | A.P BOISER CONSTRUCTION AND SUPPLY | Proposed CME-45m, 24sqm, 320kp... See more | PH020220 ZONE 5, BRGY. PADDAYA, APPARI, CAGAYAN | Rejected | 2025-08-20 14:14:29 | Returned to Applicant | PLEASE REFER TO CSHP TEMPLATE:... See more | |
| 750 | JC PALOMO CONSTRUCTION & CONSTRUCTION SUPPLY | CONSTRUCTION OF PROPOSED TWO S... See more | GUCAB,ECHAGUE,ISABELA | Rejected | 2025-08-20 14:40:32 | Returned to Applicant | NO ATTACHED DOCUMENTARY REQUIR... See more | |
| 751 | DOLE_RO2_2025-08-26_343_6MAI | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF DUMAW... See more | ISABELA | Approved | 2025-08-20 15:21:17 | Ready for Release | Processed in 4 working days. |
| 752 | DOLE_RO2_2025-08-26_344_3MQD | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF STO D... See more | ISABELA | Approved | 2025-08-20 15:26:31 | Ready for Release | Processed in 4 working days. |
| 753 | A.P BOISER CONSTRUCTION AND SUPPLY | Proposed CME-45m, 24sqm, 320kp... See more | PH020220 ZONE 5, BRGY. PADDAYA, APPARI, CAGAYAN | Rejected | 2025-08-20 15:52:32 | Returned to Applicant | PLEASE REFER TO CSHP TEMPLATE:... See more | |
| 754 | DOLE_RO2_2025-08-26_345_E5FA | LAB GENERAL ENGINEERING | REPAIR/REHABILITATION OF LINOM... See more | ISABELA | Approved | 2025-08-20 15:53:46 | Ready for Release | Processed in 4 working days. |
| 755 | R AN CONSTRUCTION AND CONSTRUCTION SUPPLY | LGU-DIADI BAC 2025-10 CONCRETI... See more | SITIO NAGTIM-OG BRGY. BUGNAY, DIADI, NUEVA VIZCAYA | Rejected | 2025-08-20 16:11:54 | Returned to Applicant | NO ATTACHMENTS | |
| 756 | R AN CONSTRUCTION AND CONSTRUCTION SUPPLY | LGU-DIADI BAC 2025-10 CONCRETI... See more | SITIO NAGTIM-OG BRGY. BUGNAY, DIADI, NUEVA VIZCAYA | Rejected | 2025-08-20 16:57:16 | Returned to Applicant | *10 WORKERS - NEEDS 2 SAFETY O... See more | |
| 757 | DOLE_RO2_2025-08-26_346_0EU4 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONTINUATION OF CONCRETING ZON... See more | PIGGATAN, ALCALA, CAGAYAN | Approved | 2025-08-21 08:12:13 | Ready for Release | Processed in 4 working days. |
| 758 | DOLE_RO2_2025-08-26_347_UCPX | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF MINANGA TEJA... See more | ABBEG, ALCALA, CAGAYAN | Approved | 2025-08-21 08:19:57 | Ready for Release | Processed in 4 working days. |
| 759 | JIJOMER CONSTRUCTION | Repair / Rehab. of Asaklat BHS | Nagtipunan, Quirino | Rejected | 2025-08-21 08:22:24 | Returned to Applicant | Findings: 1. Application Fo... See more | |
| 760 | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | IMPROVEMENT OF BARANGAY MULTI-... See more | LA TORRE NORTH, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-08-21 08:25:38 | Returned to Applicant | The designated First Aider and... See more | |
| 761 | DOLE_RO2_2025-08-26_348_4MV5 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF DAMMANG ALOG... See more | AFUSING DAGA, ALCALA, CAGAYAN | Approved | 2025-08-21 08:25:59 | Ready for Release | Processed in 4 working days. |
| 762 | CTC Group Inc former Alphateq Inc | Globe Roll-out Project | PH020189-Brgy. Pinaripad Sur, Aglipay, Quirino | Rejected | 2025-08-21 09:02:39 | Returned to Applicant | a. The submitted CSHP form is ... See more | |
| 763 | JIJOMER CONSTRUCTION | Repair / Rehab. of San Dionisi... See more | Nagtipunan, Quirino | Rejected | 2025-08-21 09:05:55 | Returned to Applicant | Findings: Repair / Rehab. of S... See more | |
| 764 | DOLE_RO2_2025-08-29_363_GP8G | KNB CONSTRUCTION | REPAIR/REHABILITATION OF ITBUD... See more | UYUGAN BATANES | Approved | 2025-08-21 10:23:01 | Ready for Release | Processed in 7 working days. |
| 765 | KNB CONSTRUCTION | REPAIR/REHABILITATION OF MAHAT... See more | MAHATAO BATANES | Rejected | 2025-08-21 10:37:30 | Returned to Applicant | SO2 and FA are the same with o... See more | |
| 766 | KNB CONSTRUCTION | REPAIR/REHABILITATION OF PANAT... See more | MAHATAO BATANES | Rejected | 2025-08-21 10:43:08 | Returned to Applicant | SO2 and FA are the same with t... See more | |
| 767 | DOLE_RO2_2025-08-26_349_S0X4 | Dandex contruction | Concreting of farm to market r... See more | Utan, allacapan, cagayan | Approved | 2025-08-21 15:26:46 | Ready for Release | Processed in 3 working days. |
| 768 | Dandex contruction | Concreting of farm to market r... See more | Capanickian norte, allacapan, cagayan | Rejected | 2025-08-21 16:10:41 | Returned to Applicant | The designated First Aider has... See more | |
| 769 | DOLE_RO2_2025-08-26_350_205E | A&J DESIGNS AND CONSTRUCTION | REHABILITATION OF NHA IP DORMI... See more | NUEVA VIZCAYA STATE UNIVERSITY- BAMBANG CAMPUS | Approved | 2025-08-22 08:17:21 | Ready for Release | Processed in 3 working days. |
| 770 | JPLC TRADING | 2025-24-HO-COB-01; SUPPLY, DEL... See more | NIA HEAD OFFICE, CAUAYAN, ISABELA | Rejected | 2025-08-22 08:40:04 | Returned to Applicant | CSHP TEMPLATE NOT DULY FILLED ... See more | |
| 771 | JS AND ASSOCIATES CONSTRUCTION AND DEVELOPMENT, INC. | PH020192 | BRGY VILLA QUIRINO, BAGABAG, NUEVA VIZCAYA | Rejected | 2025-08-22 10:51:43 | Returned to Applicant | UNSIGNED PCAB | |
| 772 | Buskowitz Solar Inc. | INSTALLATION OF 99 kWp SOLAR P... See more | DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-08-22 11:55:03 | Returned to Applicant | 1. No application form 2. PCA... See more | |
| 773 | Buskowitz Solar Inc. | INSTALLATION OF 99 kWp SOLAR P... See more | DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-08-22 12:21:14 | Returned to Applicant | 1. PCAB is unsigned 2. No Red... See more | |
| 774 | Buskowitz Solar Inc. | INSTALLATION OF 99 kWp SOLAR P... See more | DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-08-22 12:25:19 | Returned to Applicant | 1. Unsigned PCAB 2. No First ... See more | |
| 775 | Buskowitz Solar Inc. | INSTALLATION OF 99 kWp SOLAR P... See more | DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-08-22 12:30:09 | Returned to Applicant | 1. Unsigned PCAB 2. No First ... See more | |
| 776 | DOLE_RO2_2025-08-26_351_6Z7Z | A.P BOISER CONSTRUCTION AND SUPPLY | Proposed CME-45m, 24sqm, 320kp... See more | PH020194 BRGY. AGUIAGUICAN, GATTARAN, CAGAYAN | Approved | 2025-08-22 13:01:43 | Ready for Release | Processed in 2 working days. |
| 777 | DOLE_RO2_2025-08-26_352_TXOB | A.P BOISER CONSTRUCTION AND SUPPLY | Proposed CME-45m, 24sqm, 320kp... See more | PH020220 ZONE 5, BRGY. PADDAYA, APPARI, CAGAYAN | Approved | 2025-08-22 13:05:14 | Ready for Release | Processed in 2 working days. |
| 778 | DOLE_RO2_2025-08-26_353_3B7M | BELANCE BUILDERS & TRADING | CONSTRUCTION OF TWO STOREY SC... See more | BARANGAY PAQUET, KASIBU, NUEVA VIZCAYA | Approved | 2025-08-22 15:12:27 | Ready for Release | Processed in 2 working days. |
| 779 | DOLE_RO2_2025-08-27_354_W1SP | ATLANTIC CONSTRUCTION | resealing of runway cracks and... See more | tuguegarao city, cagayan | Approved | 2025-08-22 15:27:52 | Ready for Release | Processed in 3 working days. |
| 780 | WERR CORPORATION INTERNATIONAL | CONSTRUCTION OF WELCOME ARCH | Maddarulug Norte, Enrile, Cagayan | Rejected | 2025-08-22 17:06:32 | Returned to Applicant | PLEASE REFER TO CSHP TEMPLATE:... See more | |
| 781 | DOLE_RO2_2025-08-27_355_VJS7 | DANDEX CONSTRUCTION | Allacapan, cagayanconcreting o... See more | Capanickian Norte, Allacapan, Cagayan | Approved | 2025-08-22 17:15:26 | Ready for Release | Processed in 3 working days. |
| 782 | DOLE_RO2_2025-08-27_356_LXXA | MIZRACH'S CONSTRUCTION SERVICES | CONCRETING/REHABILITATION OF F... See more | Gen. Aguinaldo, Ramon, Isabela | Approved | 2025-08-26 08:11:04 | Ready for Release | Processed in 2 working days. |
| 783 | JMD-68 Builders | Construction of Multi-Purpose ... See more | Salvacion, Saguday, Quirino | Rejected | 2025-08-26 09:30:26 | Returned to Applicant | Findings: 1. Please Follow t... See more | |
| 784 | GOLDEN TECH CONSTRUCTION CORPORATION | NCB-INFRA-ISA123-25-RPCIS-DINA... See more | DINAPIGUE,ISABELA | Rejected | 2025-08-26 09:49:10 | Returned to Applicant | CSHP TEMPLATE NOT DULY FILLED ... See more | |
| 785 | DOLE_RO2_2025-08-27_357_9O35 | JHUERS CONSTRUCTION | PB-CW-2025-026 CONSTRUCTION / ... See more | SAN PEDRO, MADDELA, QUIRINO | Approved | 2025-08-26 10:14:05 | Ready for Release | Processed in 2 working days. |
| 786 | DOLE_RO2_2025-08-27_358_DI7M | MACST CONSTRUCTION AND SUPPLY | CONS. OF WELCOME ARCH AT BUA, ... See more | BUA,TADJI, DIDIPIO, KASIBU, NUEVA VIZCAYA | Approved | 2025-08-26 10:24:20 | Ready for Release | Processed in 2 working days. |
| 787 | DOLE_RO2_2025-08-27_359_DJJG | RDJD CONSTRUCTION | CONCRETING OF TOMINEZ-MAGPALE ... See more | MALASIN, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-08-26 12:31:17 | Ready for Release | Processed in 1 working days. |
| 788 | BMJ BUILDERS | PROVISION OF LABOR AND MATERIA... See more | NO. 18 DALAN NA PAGAYAYA CORNER MATUNUNG, REGIONAL GOVERNMENT CENTER, CARIG SUR, TUGUEGARAO CITY, CAGAYAN | Rejected | 2025-08-26 18:01:44 | Returned to Applicant | a. The submitted Construction ... See more | |
| 789 | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-45m, 24sqm, 320kph, 150D k... See more | GATTARAN CAGAYAN | Rejected | 2025-08-27 07:41:15 | Returned to Applicant | NC2 FOR ELECTRICIAN HAS ALREAD... See more | |
| 790 | JPLC TRADING | 2025-24-HO-COB-01; SUPPLY, DEL... See more | NIA HEAD OFFICE, CAUAYAN, ISABELA | Rejected | 2025-08-27 09:01:20 | Returned to Applicant | Finished project | |
| 791 | DOLE_RO2_2025-08-29_364_3VRM | WERR CORPORATION INTERNATIONAL | CONSTRUCTION OF WELCOME ARCH | Maddarulug Norte, Enrile, Cagayan | Approved | 2025-08-27 10:02:15 | Ready for Release | Processed in 3 working days. |
| 792 | TECKON CONSTRUCTION | REHABILITATION OF LBS BUILDING... See more | SOLANA, CAGAYAN | Rejected | 2025-08-27 10:11:35 | Returned to Applicant | LETTER OF INTENT: PLEASE ADDRE... See more | |
| 793 | RDJD CONSTRUCTION | CONCRETING OF TOMINEZ-MAGPALE ... See more | MALASIN, DUPAX DEL NORTE, NUEVA VIZCAYA | Rejected | 2025-08-27 10:45:14 | Returned to Applicant | safety officer and first aider... See more | |
| 794 | DOLE_RO2_2025-08-29_365_AZZ2 | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | IMPROVEMENT OF BARANGAY MULTI-... See more | LA TORRE NORTH, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-08-27 11:51:18 | Ready for Release | Processed in 3 working days. |
| 795 | JIRAGA BUILDERS | PROPOSED IMPROVEMENT OF MULTI-... See more | Municipal Center, Barangay 2, Enrile, Cagayan | Rejected | 2025-08-27 12:30:42 | Returned to Applicant | NOT PROPERLY FILLED OUT CSHP T... See more | |
| 796 | DOLE_RO2_2025-09-03_367_VN8C | UPLAND CONSTRUCTION | CONSTRUCTION OF CANAL LINING W... See more | BARANGAY DON DOMINGO MADDELA, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-08-27 16:22:03 | Ready for Release | Processed in 5 working days. |
| 797 | CTC Group Inc former Alphateq Inc | Globe Roll-out Project | PH020189-Brgy. Pinaripad Sur, Aglipay, Quirino | Rejected | 2025-08-28 07:06:54 | Returned to Applicant | a. The submitted Construction ... See more | |
| 798 | JC PALOMO CONSTRUCTION AND CONSTRUCTION SUPPLY | Construction of Proposed Two-S... See more | Gucab, Echague, Isabela | Rejected | 2025-08-28 08:31:09 | Returned to Applicant | tagged as a finished project. | |
| 799 | DOLE_RO2_2025-08-29_366_ORPJ | GOLDEN TECH CONSTRUCTION CORPORATION | NCB-INFRA-ISA123-25-RPCIS-DINA... See more | DINAPIGUE,ISABELA | Approved | 2025-08-28 09:37:11 | Ready for Release | Processed in 2 working days. |
| 800 | DOLE_RO2_2025-08-29_360_AJBF | JPLC TRADING | 2025-24-HO-COB-01; SUPPLY, DEL... See more | NIA HEAD OFFICE, CAUAYAN, ISABELA | Approved | 2025-08-28 09:39:22 | Ready for Release | Processed in 1 working days. |
| 801 | AMBAGUIO BUILDERS | INSTALLATION OF PROVINCIAL NUR... See more | MAGSAYSAY, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-08-28 11:50:47 | Returned to Applicant | DUPLICATE | |
| 802 | DOLE_RO2_2025-09-03_368_JCKL | AMBAGUIO BUILDERS | INSTALLATION OF PROVINCIAL NUR... See more | MAGSAYSAY, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-08-28 11:51:17 | Ready for Release | Processed in 4 working days. |
| 803 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 1 PARED... See more | PARED, ALCALA, CAGAYAN | Rejected | 2025-08-28 12:07:03 | Returned to Applicant | DOUBLE ENTRY | |
| 804 | BMJ BUILDERS | PROVISION OF LABOR AND MATERIA... See more | REGIONAL GOVERNMENT CENTER CARIG SUR, TUGUEGARAO CITY, CAGAYAN | Rejected | 2025-08-28 13:55:18 | Returned to Applicant | 1. NO LETTER OF INTENT ATTACHE... See more | |
| 805 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF FARM TO MARKET R... See more | CUNIG, GATTARAN, CAGAYAN | Rejected | 2025-08-28 14:05:24 | Returned to Applicant | No NCII cert of Transit Mixer ... See more | |
| 806 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 1 AFUSI... See more | AT AFUSING DAGA, ALCALA, CAGAYAN | Rejected | 2025-08-28 14:56:36 | Returned to Applicant | DOUBLE ENTRY | |
| 807 | MIZRACH'S CONSTRUCTION SERVICES | CONSTRUCTION OF STONE MASONRY ... See more | Disimungal, Nagtipunan, Quirino | Rejected | 2025-08-28 16:37:46 | Returned to Applicant | completed project | |
| 808 | DOLE_RO2_2025-09-03_369_844N | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-45m, 24sqm, 320kph, 150D k... See more | GATTARAN CAGAYAN | Approved | 2025-08-29 10:41:24 | Ready for Release | Processed in 3 working days. |
| 809 | DOLE_RO2_2025-09-03_370_XG8W | CREST92 Construction & Development Corporation | Construction of Tuguegarao Cit... See more | Atulayan Sur, Tuguegarao City, Cagayan | Approved | 2025-08-29 12:35:58 | Ready for Release | Processed in 3 working days. |
| 810 | TECKON CONSTRUCTION | REHABILITATION OF SLAUGHTER HO... See more | SOLANA, CAGAYAN | Rejected | 2025-08-29 12:51:02 | Returned to Applicant | REFER TO CSHP TEMPLATE UNDER 7... See more | |
| 811 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF FARM TO MARKET R... See more | CUNIG, GATTARAN, CAGAYAN | Rejected | 2025-08-31 12:12:54 | Returned to Applicant | DOUBLE ENTRY | |
| 812 | SHASHA'S CONSTRUCTION AND SUPPLIES | COMPLETION OF THREE CLASSROOM ... See more | ALBERTO ANOTIO PRIMARY SCHOOL GATTARAN, CAGAYAN | Rejected | 2025-08-31 12:22:48 | Returned to Applicant | PROVIDE NC2 FOR SCAFFOLDING AN... See more | |
| 813 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF ROAD AT TAGUMAY,... See more | TAGUMAY, GATTARAN, CAGAYAN | Rejected | 2025-08-31 12:23:32 | Returned to Applicant | NO NCII certificate of Transit... See more | |
| 814 | DOLE_RO2_2025-09-03_371_ZHYN | MACST CONSTRUCTION AND SUPPLY | REPAIR/REHAB OF OSCA BUILDING | POBLACION, KASIBU,NUEVA VIZCAYA | Approved | 2025-09-01 10:18:13 | Ready for Release | Processed in 2 working days. |
| 815 | DOLE_RO2_2025-09-03_372_JCV7 | MACST CONSTRUCTION AND SUPPLY | COMPLETION OF STAGE AT BARANGA... See more | ALLOY,KASIBU,NUEVA VIZCAYA | Approved | 2025-09-01 10:23:15 | Ready for Release | Processed in 2 working days. |
| 816 | DOLE_RO2_2025-09-03_373_OI7F | MACST CONSTRUCTION AND SUPPLY | CONSTRUCTION OF MULTIPURPOSE P... See more | LUPA, KASIBU,NUEVA VIZCAYA | Approved | 2025-09-01 10:26:25 | Ready for Release | Processed in 2 working days. |
| 817 | MEGA EAST POWER CONSTRUCTION CORPORATION | NATIONAL GRID CORPORATION OF T... See more | BUSILAC PUROK 4 BAYOMBONG NUEVA VISCAYA | Rejected | 2025-09-01 10:31:03 | Returned to Applicant | Kindly include all pages of th... See more | |
| 818 | DOLE_RO2_2025-09-03_374_N2OX | Buskowitz Solar Inc. | INSTALLATION OF 99 kWp SOLAR P... See more | DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-09-01 13:41:29 | Ready for Release | Processed in 2 working days. |
| 819 | DOLE_RO2_2025-09-03_375_MUXG | Buskowitz Solar Inc. | INSTALLATION OF 99KWP SOLAR PV... See more | DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-09-01 13:49:31 | Ready for Release | Processed in 2 working days. |
| 820 | DOLE_RO2_2025-09-03_376_M2ID | Buskowitz Solar Inc. | INSTALLATION OF 99KWP SOLAR PV... See more | DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-09-01 13:52:28 | Ready for Release | Processed in 2 working days. |
| 821 | DOLE_RO2_2025-09-03_377_AQZR | JIJOMER CONSTRUCTION | Repair / Rehab. of Asaklat BHS | Nagtipunan, Quirino | Approved | 2025-09-01 14:56:08 | Ready for Release | Processed in 2 working days. |
| 822 | SAN JACINTO CONSTRUCTION SERVICES AND GENERAL MERCHANDISING | Renovation of Ground floor com... See more | Municipal Government Center, Brgy. II, Enrile Cagayan | Rejected | 2025-09-01 14:56:36 | Returned to Applicant | No signature of owner in the a... See more | |
| 823 | DOLE_RO2_2025-09-03_378_0CW6 | JIJOMER CONSTRUCTION | Repair / Rehab. of San Dionisi... See more | Nagtipunan, Quirino | Approved | 2025-09-01 15:28:24 | Ready for Release | Processed in 2 working days. |
| 824 | IDESCON INC. | SUPREME COURT/ HALL OF JUSTICE... See more | BAMBANG MUNICIPAL HALL, BRGY. BUAG, BAMBANG, NUEVA VIZCAYA | Rejected | 2025-09-02 10:38:03 | Returned to Applicant | Require additional SO. Totalit... See more | |
| 825 | DOLE_RO2_2025-09-03_379_IMHK | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 1 PARED... See more | ZONE 1 PARED FMR AT ALCALA, CAGAYAN | Approved | 2025-09-02 10:58:44 | Ready for Release | Processed in 1 working days. |
| 826 | JIRAGA BUILDERS | PROPOSED IMPROVEMENT OF MULTI-... See more | Municipal Center, Barangay 2, Enrile, Cagayan | Rejected | 2025-09-02 13:49:52 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 827 | DOLE_RO2_2025-09-03_380_EF3T | ACES 3 CONSTRUCTION | PB-CW-2025-066-IMPROVEMENT/CON... See more | DON FAUSTINO PAGADUAN,DIFFUN QUIRINO | Approved | 2025-09-02 15:31:16 | Ready for Release | Processed in 1 working days. |
| 828 | DOLE_RO2_2025-09-03_381_ZWDD | ACES 3 CONSTRUCTION | PB-CW-2025-065-IMPROVEMENT/CON... See more | CAMPAMENTO,DIFFUNQUIRINO | Approved | 2025-09-02 15:40:01 | Ready for Release | Processed in 1 working days. |
| 829 | DOLE_RO2_2025-09-08_383_C1EO | M & F ENTERPRISE | OPENING AND IMPROVEMENT OF DU... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-09-02 17:07:43 | Ready for Release | Processed in 4 working days. |
| 830 | DOLE_RO2_2025-09-08_384_3KVB | BELANCE BUILDERS & TRADING | IMPROVEMENT OF FMR UPPER DINE... See more | BRGY. DINE, KASIBU, NUEVA VIZCAYA | Approved | 2025-09-02 17:12:05 | Ready for Release | Processed in 4 working days. |
| 831 | DOLE_RO2_2025-09-08_385_KMO1 | BENSON BUILDERS | IMPROVEMENT OF FARM TO MARKET ... See more | BRGY. CORDON, KASIBU, NUEVA VIZCAYA | Approved | 2025-09-02 17:16:55 | Ready for Release | Processed in 4 working days. |
| 832 | DOLE_RO2_2025-09-08_386_EYKV | BENSON BUILDERS | IMPROVEMENT OF FARM TO MARKET ... See more | BRGY. CORDON, KASIBU, NUEVA VIZCAYA | Approved | 2025-09-02 17:21:07 | Ready for Release | Processed in 4 working days. |
| 833 | DOLE_RO2_2025-09-08_387_FA45 | BENSON BUILDERS | CONSTRUCTION OF TWO STOREY SCH... See more | BRGY. BINOGAWAN, KASIBU, NUEVA VIZCAYA | Approved | 2025-09-02 17:25:31 | Ready for Release | Processed in 4 working days. |
| 834 | DOLE_RO2_2025-09-03_382_GXTI | IDESCON INC. | PROPOSED REPAIR AND REHABILITA... See more | BAMBANG MUNICIPAL HALL, BRGY. BUAG, BAMBANG, NUEVA VIZCAYA | Approved | 2025-09-03 08:26:22 | Ready for Release | Processed in 1 working days. |
| 835 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF ZONE 1 PARED... See more | ZONE 1 PARED FMR AT ALCALA, CAGAYAN | Rejected | 2025-09-03 09:33:16 | Returned to Applicant | Designated First Aider for thi... See more | |
| 836 | JIRAGA BUILDERS | PROPOSED IMPROVEMENT OF MULTI-... See more | Municipal Center, Barangay 2, Enrile, Cagayan | Rejected | 2025-09-03 13:20:37 | Returned to Applicant | EXPIRED CERTIFICATE/I.D. OF FI... See more | |
| 837 | JAN PAOLA CONSTRUCTION INC. | construction of luna hemodialy... See more | Centro 2, Luna, Isabela | Rejected | 2025-09-03 17:27:09 | Returned to Applicant | CSHP APPLICATION NOT DULLY FIL... See more | |
| 838 | DOLE_RO2_2025-09-08_388_RXLQ | BELANCE BUILDERS & TRADING | IMPROVEMENT OF FARM TO MARKET ... See more | BRGY. CATAWARAN, KASIBU, NUEVA VIZCAYA | Approved | 2025-09-03 17:36:55 | Ready for Release | Processed in 3 working days. |
| 839 | DOLE_RO2_2025-09-08_389_S8AD | OUA CONSTRUCTION | CONTINUATION OF REHABILITATION... See more | BARANGAY. SAN ISIDRO, LUNA, ISABELA | Approved | 2025-09-04 09:38:00 | Ready for Release | Processed in 3 working days. |
| 840 | DOLE_RO2_2025-09-08_390_N7UD | OUA CONSTRUCTION | CONSTRUCTION OF 2 BASKETBALL C... See more | BARANGAY LUYAO, LUNA, ISABELA | Approved | 2025-09-04 09:42:02 | Ready for Release | Processed in 3 working days. |
| 841 | SHASHA'S CONSTRUCTION AND SUPPLIES | COMPLETION OF THREE CLASSROOM ... See more | ALBERTO ANOTIO PRIMARY SCHOOL GATTARAN, CAGAYAN | Rejected | 2025-09-04 12:15:06 | Returned to Applicant | Designated First Aider-Randolp... See more | |
| 842 | KOMICHOV GENERAL CONSTRUCTION | IMPROVEMENT OF VARIOUS FARM TO... See more | VILLAVERDE, NUEVA VIZCAYA | Rejected | 2025-09-04 13:01:28 | Returned to Applicant | Please include ID on FIRST AID... See more | |
| 843 | Dragon twelve builders and construction supply | ITB 8 lot 10 completion of bar... See more | Brgy San Mateo tumauini isabela | Rejected | 2025-09-04 14:13:05 | Returned to Applicant | 1. PCAB attached is Expired 2.... See more | |
| 844 | Dragon twelve builders and construction supply | ITB 8 Lot 2 repair of 10 cl cd... See more | Catabayungan cabagan isabela | Rejected | 2025-09-04 14:22:47 | Returned to Applicant | 1. Expired PCAB 2. Safety offi... See more | |
| 845 | Dragon twelve builders and construction supply | ITB 8 LOT 1 repair of five (5)... See more | San Antonio Santa Maria isabela | Rejected | 2025-09-04 14:25:30 | Returned to Applicant | 1. Expired PCAB 2. Safety offi... See more | |
| 846 | Dragon twelve builders and construction supply | ITB 8 LOT 3 CONSTRUCTION OF 1 ... See more | SITIO CADDANGAN LIMBAUAN SAN PABLO ISABELA | Rejected | 2025-09-04 14:47:26 | Returned to Applicant | Upon evaluation of the submitt... See more | |
| 847 | Dragon twelve builders and construction supply | ITB 8 LOT 4 CONSTRUCTION OF 1 ... See more | San Isidro East sta Maria isabela | Rejected | 2025-09-04 14:50:55 | Returned to Applicant | Upon evaluation of the submitt... See more | |
| 848 | Dragon twelve builders and construction supply | ITB 8 LOT 5 CONSTRUCTION OF 1 ... See more | DALENA San Pablo isabela | Rejected | 2025-09-04 14:59:18 | Returned to Applicant | Upon evaluation of the submitt... See more | |
| 849 | Dragon twelve builders and construction supply | IBT 8 LOT 6 CONSTRUCTION OF MU... See more | RAGAN SUR NATIONAL HIGH SCHOOL DELFIN ALBANO ISABELA | Rejected | 2025-09-04 15:03:32 | Returned to Applicant | Upon evaluation of the submitt... See more | |
| 850 | JAN PAOLA CONSTRUCTION INC. | IMPROVEMENT OF MULTI-PURPOSE B... See more | Centro 2, Luna, Isabela | Rejected | 2025-09-04 15:32:34 | Returned to Applicant | a. The attached testing certif... See more | |
| 851 | Dragon twelve builders and construction supply | ITB 8 LOT 6 CONSTRUCTION OF MU... See more | RAGAN SUR DELFIN ALBANO ISABELA | Rejected | 2025-09-04 16:11:26 | Returned to Applicant | Upon evaluation of the submitt... See more | |
| 852 | W.S FAGCANGAN CONSTRUCTION MANAGEMENT SERVICES | REPAIR OF AIR SIDE SECURITY/ P... See more | TUGUEGARAO CITY | Rejected | 2025-09-05 08:11:03 | Returned to Applicant | a. The applicant listed in the... See more | |
| 853 | 5 MJ'S CONSTRUCTION | COMPLETION OF 2CL BUILDING( TA... See more | TAMBAN, ALCALA, CAGAYAN | Rejected | 2025-09-05 09:20:41 | Returned to Applicant | a. The submitted Construction ... See more | |
| 854 | DOLE_RO2_2025-09-10_396_86DD | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF ROAD AT TAGUMAY,... See more | TAGUMAY, GATTARAN, CAGAYAN | Approved | 2025-09-05 10:50:13 | Ready for Release | Processed in 3 working days. |
| 855 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF ROAD AT TAGUMAY,... See more | TAGUMAY, GATTARAN, CAGAYAN | Rejected | 2025-09-05 10:50:22 | Returned to Applicant | DOUBLE ENTRY | |
| 856 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF ROAD AT TAGUMAY,... See more | TAGUMAY, GATTARAN, CAGAYAN | Rejected | 2025-09-05 10:50:31 | Returned to Applicant | DOUBLE ENTRY | |
| 857 | SAN JACINTO CONSTRUCTION SERVICES AND GENERAL MERCHANDISING | Renovation of Ground floor com... See more | Municipal Government Center, Brgy. II, Enrile Cagayan | Rejected | 2025-09-05 11:09:57 | Returned to Applicant | REFER TO CSHP TEMPLATE: NOT ST... See more | |
| 858 | DOLE_RO2_2025-09-10_397_KP42 | MACST CONSTRUCTION AND SUPPLY | IMPROVEMENT OF FARM TO MARKET ... See more | BINOGAWAN,KASIBU,NUEVA VIZCAYA | Approved | 2025-09-05 12:11:44 | Ready for Release | Processed in 3 working days. |
| 859 | RCS Solar and Electrical Installation Services | 10kw Hybrid Solar Power System | Ipil St. Rosario, Santiago City | Rejected | 2025-09-05 13:43:06 | Returned to Applicant | Cshp application and template ... See more | |
| 860 | DOLE_RO2_2025-09-10_398_6IKQ | MACST CONSTRUCTION AND SUPPLY | IMPROVEMENT OF FARM TO MARKET ... See more | CAMAMASI,KASIBU,NUEVA VIZCAYA | Approved | 2025-09-05 16:01:59 | Ready for Release | Processed in 3 working days. |
| 861 | DOLE_RO2_2025-09-08_391_QRBU | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-78-25 CONSTRUC... See more | CLAVERIA, CAGAYAN | Approved | 2025-09-08 09:27:58 | Ready for Release | Processed in 1 working days. |
| 862 | DOLE_RO2_2025-09-08_392_J02W | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-80-25 CONSTRUC... See more | CLAVERIA, CAGAYAN | Approved | 2025-09-08 09:30:59 | Ready for Release | Processed in 1 working days. |
| 863 | DOLE_RO2_2025-09-08_393_KVUB | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-83-25 CONSTRUC... See more | CLAVERIA, CAGAYAN | Approved | 2025-09-08 09:33:40 | Ready for Release | Processed in 1 working days. |
| 864 | DOLE_RO2_2025-09-08_394_7EBB | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-84-25 CONSTRUC... See more | CLAVERIA, CAGAYAN | Approved | 2025-09-08 09:36:36 | Ready for Release | Processed in 1 working days. |
| 865 | DOLE_RO2_2025-09-08_395_AEHN | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-108-24 IMPROVE... See more | APARRI, CAGAYAN | Approved | 2025-09-08 09:39:10 | Ready for Release | Processed in 1 working days. |
| 866 | RBGONZALES OPC | 791.10 kWp/700 kW AC ROOF-TOP ... See more | SM CITY CAUAYAN, MAHARLIKA HW. BRGY DISTRICT 2, CAUAYAN CITY | Rejected | 2025-09-08 11:11:18 | Returned to Applicant | DOUBLE ENTRY | |
| 867 | RBGONZALES OPC | 791.10 kWp/700 kW AC ROOF-TOP ... See more | SM CITY CAUAYAN, MAHARLIKA HW. BRGY DISTRICT 2, CAUAYAN CITY | Rejected | 2025-09-08 11:27:36 | Returned to Applicant | DOUBLE ENTRY | |
| 868 | RBGONZALES OPC | 791.10 kWp/700 kW AC ROOF-TOP ... See more | SM CITY CAUAYAN, MAHARLIKA HW. BRGY DISTRICT 2, CAUAYAN CITY | Rejected | 2025-09-08 11:30:53 | Returned to Applicant | CSHP TEMPLATE NOT DULY FILLED ... See more | |
| 869 | NETSOLAR INC. | Insular Life | 2/F Insular Life Building, Maharlika Highway, Villasis, Santiago City, Isabela, Philippines | Rejected | 2025-09-08 13:13:30 | Returned to Applicant | CSHP TEMPLATE NOT DULY FILLED ... See more | |
| 870 | NETSOLAR INC. | Insular Life | 2/F Insular Life Building, Maharlika Highway, Villasis, Santiago City, Isabela, Philippines | Rejected | 2025-09-08 13:17:07 | Returned to Applicant | DOUBLE ENTRY | |
| 871 | Lancesoft Infra Solution Inc | E02919-B05 / NS-NTG22-G20 | BRGY BARESBES QUEZON NUEVA VIZCAYA | Rejected | 2025-09-08 16:56:19 | Returned to Applicant | 1. The CSHP Application and Pr... See more | |
| 872 | DEKM CONSTRUCTION | REPAIR OF AIR SIDE SECURITY/ P... See more | TUGUEGARAO CITY | Rejected | 2025-09-09 08:09:04 | Returned to Applicant | 1. No Philippine Contractors A... See more | |
| 873 | GIGAWORKZ TECHNOLOGIES INC. | DESIGN, SUPPLY, INSTALLATION, ... See more | SMFI Echague Isabela | Rejected | 2025-09-09 08:54:06 | Returned to Applicant | state the number of calendar d... See more | |
| 874 | MILESTONE 888 CONSTRUCTION INC. | Construction of Bridge going t... See more | San Miguel, Baggao, Cagayan | Rejected | 2025-09-09 09:39:40 | Returned to Applicant | 1. FILLED OUT PROPERLY THE CSH... See more | |
| 875 | DOLE_RO2_2025-09-15_400_C6H6 | KNB CONSTRUCTION | REPAIR/REHABILITATION OF PANAT... See more | MAHATAO, BATANES | Approved | 2025-09-09 10:38:36 | Ready for Release | Processed in 4 working days. |
| 876 | KNB CONSTRUCTION | REPAIR/REHABILITATION OF MAHAT... See more | MAHATAO, BATANES | Rejected | 2025-09-09 10:43:50 | Returned to Applicant | Same First Aider and Safety of... See more | |
| 877 | DOLE_RO2_2025-09-10_399_2Q0N | CTC Group Inc former Alphateq Inc | Globe Roll-out Project | PH020189-Brgy. Pinaripad Sur, Aglipay, Quirino | Approved | 2025-09-09 14:51:52 | Ready for Release | Processed in 1 working days. |
| 878 | DOLE_RO2_2025-09-15_401_F3JU | SAN JACINTO CONSTRUCTION SERVICES AND GENERAL MERCHANDISING | Renovation of Ground floor com... See more | Municipal Government Center, Brgy. II, Enrile Cagayan | Approved | 2025-09-09 16:23:26 | Ready for Release | Processed in 4 working days. |
| 879 | MACST CONSTRUCTION AND SUPPLY | CONSTRUCTION OF 2 CLASSROOM W/... See more | DIDIPIO,KASIBU,NUEVA VIZCAYA | Rejected | 2025-09-09 17:12:04 | Returned to Applicant | NO ATTACHMENTS | |
| 880 | SOUTHLAND CONSTRUCTION AND SUPPLIES | CONSTRUCTION OF BOX CULVERT (N... See more | KASIBU, NUEVA VIZCAYA | Rejected | 2025-09-10 09:21:43 | Returned to Applicant | COMPLETED PROJECT | |
| 881 | DOLE_RO2_2025-09-15_402_IEAX | JKAVER CONSTRUCTION AND ENGINEERING SERVICES | FTAP-GLOBE ROLLOUT PROJECT: PH... See more | BRGY. BONE SOUTH, ARITAO, NUEVA VIZCAYA | Approved | 2025-09-10 09:54:38 | Ready for Release | Processed in 3 working days. |
| 882 | KNB CONSTRUCTION | REPAIR/REHABILITATION OF MAHAT... See more | MAHATAO, BATANES | Rejected | 2025-09-10 10:58:56 | Returned to Applicant | No Certificate of First Aider. | |
| 883 | JAN PAOLA CONSTRUCTION INC. | construction of luna hemodialy... See more | LALOG 1, Luna, Isabela | Rejected | 2025-09-10 12:52:33 | Returned to Applicant | The Designated Safety Officer ... See more | |
| 884 | yumadag builders | JOLLIBEE - BONIFACIO GONZAGA | TUGUEGARAO CITY | Rejected | 2025-09-10 13:27:38 | Returned to Applicant | USE COMPREHENSIVE FORMS AND TE... See more | |
| 885 | DOLE_RO2_2025-09-15_403_D7QL | DIAMOND J BUILDERS | ESTABLISHMENT OF UNIVERSITY RA... See more | NUEVA VIZCAYA STATE UNIVERSITY, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-09-10 15:07:36 | Ready for Release | Processed in 3 working days. |
| 886 | DOLE_RO2_2025-09-15_404_PNUM | DEKM CONSTRUCTION | REPAIR OF AIR SIDE SECURITY/ P... See more | TUGUEGARAO CITY | Approved | 2025-09-10 17:26:50 | Ready for Release | Processed in 3 working days. |
| 887 | NORTH WIDE JAAR CONST CORP | REPAIR OF SCHOOL FACILITIES IN... See more | TUGUEGARAO CITY | Rejected | 2025-09-11 09:48:04 | Returned to Applicant | NO SIGNATURE OF PROJECT OWNER,... See more | |
| 888 | DOLE_RO2_2025-09-15_405_4IUD | DANDEX CONSTRUCTION | concreting of access road to s... See more | Burot, Allacapan, Cagayan | Approved | 2025-09-11 12:21:30 | Ready for Release | Processed in 2 working days. |
| 889 | DOLE_RO2_2025-09-15_407_NYQ0 | DEKM CONSTRUCTION | finishing of the municipal gym... See more | centro east, allacapan, cagayan | Approved | 2025-09-11 12:29:06 | Ready for Release | Processed in 3 working days. |
| 890 | CJTPASCUAL CONSTRUCTION | Concreting of Access Road Lead... See more | Brgy. Minanga Norte, Lasam, Cagayan | Rejected | 2025-09-11 13:36:28 | Returned to Applicant | Upon evaluation of the submitt... See more | |
| 891 | DECA CONSTRUCTION | Rehabilitation of Farm to Mark... See more | Nicolas Agatep, Lasam, Cagayan | Rejected | 2025-09-11 14:04:38 | Returned to Applicant | DOUBLE ENTRY | |
| 892 | NEW AMSON CONSTRUCTION | PROCUREMENT FOR THE CONSTRUCTI... See more | ECHAGUE, ISABELA | Rejected | 2025-09-11 15:28:38 | Returned to Applicant | CSHP TEMPLATE NOT DULY FILLED ... See more | |
| 893 | JAN PAOLA CONSTRUCTION INC. | IMPROVEMENT OF MULTI-PURPOSE B... See more | Centro 2, Luna, Isabela | Rejected | 2025-09-11 17:23:50 | Returned to Applicant | Replace the name of first aide... See more | |
| 894 | BMJ BUILDERS | Provision of Labor and Materia... See more | Regional Government Center, Carig Sur, Tuguegarao City, Cagayan | Rejected | 2025-09-11 17:37:12 | Returned to Applicant | NO ATTACEHD LETTER OF INTENT, ... See more | |
| 895 | POWER 4 ALL INC. | Green Lighting of Provincial C... See more | Capitol Compound, Bayombong Nueva Vizcaya | Rejected | 2025-09-11 20:37:52 | Returned to Applicant | 1. Please use the DOLE prescri... See more | |
| 896 | KNB CONSTRUCTION | REPAIR/REHABILITATION OF MAHAT... See more | MAHATAO, BATANES | Rejected | 2025-09-12 11:02:29 | Returned to Applicant | Expired PCAB License | |
| 897 | DOLE_RO2_2025-09-15_406_8DON | J.A.N CONSTRUCTION | MEO-DF-2025-025 | CONCRETING OF N.I.A ROAD, BRGY. STA. ROSA, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-09-12 11:04:09 | Ready for Release | Processed in 1 working days. |
| 898 | DOLE_RO2_2025-09-17_410_71Z8 | NEW AMSON CONSTRUCTION | PROCUREMENT FOR THE CONSTRUCTI... See more | ECHAGUE, ISABELA | Approved | 2025-09-12 11:18:08 | Ready for Release | Processed in 4 working days. |
| 899 | RTC CONSTRUCTION AND SUPPLY | CONSTRUCTION OF PERIMETER FENC... See more | LALLO, CAGAYAN | Rejected | 2025-09-12 12:27:12 | Returned to Applicant | NO LETTER OF INTENT ATTACHED, ... See more | |
| 900 | DOLE_RO2_2025-09-15_408_ADF8 | DECA CONSTRUCTION | Rehabilitation of Farm to Mark... See more | Nicolas Agatep, Lasam, Cagayan | Approved | 2025-09-12 13:20:32 | Ready for Release | Processed in 2 working days. |
| 901 | Arm forces and police savings and loans association inc | AFPSLAI CAGAYAN | Caggay Tuguegarao City | Rejected | 2025-09-12 14:03:47 | Returned to Applicant | Expired PCAB. No testing certi... See more | |
| 902 | NORTH WIDE JAAR CONST CORP | REPAIR OF SCHOOL FACILITIES IN... See more | TUGUEGARAO CITY | Rejected | 2025-09-12 14:35:21 | Returned to Applicant | LETTER OF INTENT ADDRESS TO DO... See more | |
| 903 | RTC CONSTRUCTION AND SUPPLY | CONSTRUCTION OF PERIMETER FENC... See more | LALLO, CAGAYAN | Rejected | 2025-09-12 15:26:04 | Returned to Applicant | DOUBLE ENTRY | |
| 904 | DOLE_RO2_2025-09-23_417_RSZP | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF FARM TO MARKET R... See more | LAPOGAN, GATTARAN, CAGAYAN | Approved | 2025-09-12 15:59:48 | Ready for Release | Processed in 7 working days. |
| 905 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF FARM TO MARKET R... See more | NADDUNGAN, GATTARAN, CAGAYAN | Rejected | 2025-09-12 16:03:14 | Returned to Applicant | SAFETY OFFICER AND FIRST AIDER... See more | |
| 906 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF ROAD AT PALAGAO... See more | PALAGAO SUR, GATTARAN, CAGAYAN | Rejected | 2025-09-12 16:06:47 | Returned to Applicant | SAFETY OFFICER AND FIRST AIDER... See more | |
| 907 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF ROAD AT ZONE IV... See more | ZONE IV BARACCAOIT, GATTARAN, CAGAYAN | Rejected | 2025-09-12 16:09:25 | Returned to Applicant | SAFETY OFFICER AND FIRST AIDER... See more | |
| 908 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF ROAD AT SITIO PI... See more | SITIO PINUTULAN, CAPISSAYAN NORTE, GATTARAN, CAGAYAN | Rejected | 2025-09-12 16:11:22 | Returned to Applicant | SAFETY OFFICER AND FIRST AIDER... See more | |
| 909 | DOLE_RO2_2025-09-17_411_RNB3 | JAN PAOLA CONSTRUCTION INC. | construction of luna hemodialy... See more | LALOG 1, Luna, Isabela | Approved | 2025-09-12 17:24:10 | Ready for Release | Processed in 3 working days. |
| 910 | SHASHA'S CONSTRUCTION AND SUPPLIES | IMPROVEMENT OF BURAYOK FALLS ... See more | BASAO (GRILLING AREA) GATTARAN, CAGAYAN | Rejected | 2025-09-13 08:27:14 | Returned to Applicant | SAFETY OFFICER AND FIRST AIDER... See more | |
| 911 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF FARM TO MARKET R... See more | MABUNO, GATTARAN, CAGAYAN | Rejected | 2025-09-13 08:27:36 | Returned to Applicant | SAFETY OFFICER AND FIRST AIDER... See more | |
| 912 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONSTRUCTION OF ONE BARREL BOX... See more | CAPIDDIGAN, GATTARAN, CAGAYAN | Rejected | 2025-09-13 08:29:44 | Returned to Applicant | SAFETY OFFICER AND FIRST AIDER... See more | |
| 913 | DOLE_RO2_2025-09-17_412_E9OB | D'LIMITLESS CIVIL ENGINEERING CONSTRUCTION | PROPOSED CONSTRUCTION OF ONE S... See more | MAHARLIKA HIGHWAY, MINANTE 1, CAUAYAN CITY | Approved | 2025-09-15 08:17:06 | Ready for Release | Processed in 3 working days. |
| 914 | SCR CONSTRUCTION AND ENTERPRISES | DID-899-00154 CONSTRUCTION OF ... See more | DIBUL, SAGUDAY, QUIRINO | Rejected | 2025-09-15 13:25:32 | Returned to Applicant | 1. CSHP Template Findings: P... See more | |
| 915 | Wealthmore Construction and Supply Corporation | CW301/B: Design and Build of ... See more | Carig Norte, Tuguegarao City, Cagayan | Rejected | 2025-09-15 15:03:47 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 916 | Duwa Construction | Supply, Delivery and Installat... See more | Gonzaga, Cagayan Sta. Ana, Cagayan Amulung, Cagayan Penablanca, Cagayan Camalaniugan, Cagayan Gattaran, Cagayan Buguey, Cagayan Lasam, Cagayan Baggao, Cagayan | Rejected | 2025-09-15 15:05:03 | Returned to Applicant | NOT USE UPDATED FORMS | |
| 917 | JC PALOMO CONSTRUCTION AND CONSTRUCTION SUPPLY | Construction of Proposed Two-S... See more | Gucab, Echague, Isabela | Rejected | 2025-09-16 07:49:50 | Returned to Applicant | Finished project | |
| 918 | DOLE_RO2_2025-09-23_418_2HJN | CJTPASCUAL CONSTRUCTION | Concreting of Access Road Lead... See more | Minanga Norte, Lasam, Cagayan | Approved | 2025-09-16 08:15:56 | Ready for Release | Processed in 6 working days. |
| 919 | MILESTONE 888 CONSTRUCTION INC. | Construction of Bridge going t... See more | San Miguel, Baggao, Cagayan | Rejected | 2025-09-16 08:16:51 | Returned to Applicant | LETTER OF INTENT MUST BE ADDRE... See more | |
| 920 | DOLE_RO2_2025-09-23_415_BP3B | EGB CONSTRUCTION CORPORATION (Formerly: EGB CONSTRUCTION) | CONSTRUCTION OF DORMITORY AND ... See more | CAPITOL COMPOUND, ALIBAGU, CITY OF ILAGAN, ISABELA | Approved | 2025-09-16 08:54:52 | Ready for Release | Processed in 5 working days. |
| 921 | DOLE_RO2_2025-09-16_409_T9P3 | MDU ENTERPRISES AND CONSTRUCTION | 2025-D3-CAPITAL OUTLAY-1C: REH... See more | SAN MANUEL, ISABELA | Approved | 2025-09-16 13:14:08 | Ready for Release | Processed in 1 working days. |
| 922 | 3JMS CONSTRUCTION | Construction of Slope Protecti... See more | Zone 1 & 2, Canagatan, Baggao, Cagayan | Rejected | 2025-09-16 16:10:33 | Returned to Applicant | LETTER OF INTENT MUST BE ADDRE... See more | |
| 923 | NETSOLAR INC. | Insular Life | 2/F Insular Life Building, Maharlika Highway, Villasis, Santiago City, Isabela, Philippines | Rejected | 2025-09-16 16:29:31 | Returned to Applicant | Expired PCAB | |
| 924 | DOLE_RO2_2025-09-18_413_TTV8 | RCPS CONSTRUCTION & GENERAL TRADING | 2025-D4-COB-CAUAYAN CITY-2-POW... See more | NIA MARIIS DIVISION IV, MINANTE 1, CAUAYAN CITY, ISABELA | Approved | 2025-09-16 17:37:11 | Ready for Release | Processed in 2 working days. |
| 925 | DOLE_RO2_2025-09-18_414_6Z5F | RCPS CONSTRUCTION & GENERAL TRADING | 2025-D4-OMNISPIS-PS#1-POW 10, ... See more | ANGADANAN, ISABELA | Approved | 2025-09-16 17:44:19 | Ready for Release | Processed in 2 working days. |
| 926 | Infra Towers Philippines | E02909-B06-NS-TER24-B224 | Brgy. Dipantan, Nagtipunan, Quirino | Rejected | 2025-09-17 09:04:51 | Returned to Applicant | 1. Letter address to our Regio... See more | |
| 927 | DOLE_RO2_2025-09-23_419_F7I3 | SHASHA'S CONSTRUCTION AND SUPPLIES | COMPLETION OF THREE CLASSROOM ... See more | ALBERTO ANOTIO PRIMARY SCHOOL GATTARAN, CAGAYAN | Approved | 2025-09-17 11:15:49 | Ready for Release | Processed in 5 working days. |
| 928 | DOLE_RO2_2025-09-23_420_U5OZ | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF FARM TO MARKET R... See more | CUNIG, GATTARAN, CAGAYAN | Approved | 2025-09-17 11:16:34 | Ready for Release | Processed in 5 working days. |
| 929 | RCS Solar and Electrical Installation Services | 10kw Hybrid Solar Power System | Ipil St. Rosario, Santiago City | Rejected | 2025-09-17 12:08:09 | Returned to Applicant | No pcab license, application f... See more | |
| 930 | RCS Solar and Electrical Installation Services | 10kw Hybrid Solar Power System | Vizcalang St. Calao East, Santiago City | Rejected | 2025-09-17 12:11:52 | Returned to Applicant | CSHP application and CSHP temp... See more | |
| 931 | DOLE_RO2_2025-09-23_416_OTMI | R AN CONSTRUCTION AND CONSTRUCTION SUPPLY | LGU-DIADI BAC 2025-10 CONCRETI... See more | SITIO NAGTIM-OG BRGY. BUGNAY, DIADI, NUEVA VIZCAYA | Approved | 2025-09-17 12:27:50 | Ready for Release | Processed in 4 working days. |
| 932 | NORTH WIDE JAAR CONST CORP | REPAIR OF SCHOOL FACILITIES IN... See more | TUGUEGARAO CITY | Rejected | 2025-09-17 13:21:51 | Returned to Applicant | did not match calendar year in... See more | |
| 933 | JOLLIBEE BRANCH | Proposed Building of Jollibee ... See more | CENTRO 4, TUGUEGARAO CITY | Rejected | 2025-09-17 13:30:14 | Returned to Applicant | NO SIGNATURE OVER PRINTED NAME... See more | |
| 934 | DOLE_RO2_2025-09-23_424_GLJO | NORTH WIDE JAAR CONST CORP | REPAIR OF SCHOOL FACILITIES IN... See more | TUGUEGARAO CITY | Approved | 2025-09-17 18:14:23 | Ready for Release | Processed in 4 working days. |
| 935 | JAN PAOLA CONSTRUCTION INC. | IMPROVEMENT OF MULTI-PURPOSE B... See more | Centro 2, Luna, Isabela | Rejected | 2025-09-18 08:30:00 | Returned to Applicant | Finished project | |
| 936 | JAN PAOLA CONSTRUCTION INC. | IMPROVEMENT OF MULTI-PURPOSE B... See more | Centro 2, Luna, Isabela | Rejected | 2025-09-18 08:33:42 | Returned to Applicant | Finished project | |
| 937 | JAN PAOLA CONSTRUCTION INC. | CONSTRUCTION OF DRAINAGE CANAL... See more | LUYAO, LUNA, ISABELA | Rejected | 2025-09-18 08:42:25 | Returned to Applicant | FINISHED PROJECT | |
| 938 | DOLE_RO2_2025-09-23_425_PZIT | JAN PAOLA CONSTRUCTION INC. | COMPLETION OF MULTI-PURPOSE BU... See more | UNION, KALINGA, LUNA, ISABELA | Approved | 2025-09-18 08:47:04 | Ready for Release | Processed in 4 working days. |
| 939 | JAN PAOLA CONSTRUCTION INC. | CONSTRUCTION OF LOCAL ROAD IN ... See more | SAN MIGUEL, LUNA, ISABELA | Rejected | 2025-09-18 08:54:02 | Returned to Applicant | No attached certificate of Saf... See more | |
| 940 | DKB CONSTRUCTION | CONSTRUCTION OF BOX CULVERT (C... See more | ASINGA-VIA, BAGGAO, CAGAYAN | Rejected | 2025-09-18 09:39:29 | Returned to Applicant | SAFETY OFFICER WITH EXISTING P... See more | |
| 941 | JS AND ASSOCIATES CONSTRUCTION AND DEVELOPMENT, INC. | PH020192 | BRGY VILLA QUIRINO, BAGABAG, NUEVA VIZCAYA | Rejected | 2025-09-18 10:17:04 | Returned to Applicant | NO TEMPLATE ATTACHED | |
| 942 | JC PALOMO CONSTRUCTION AND CONSTRUCTION SUPPLY | Construction of Proposed Two-S... See more | Gucab, Echague, Isabela | Rejected | 2025-09-18 17:34:19 | Returned to Applicant | Finished project | |
| 943 | SHASHA'S CONSTRUCTION AND SUPPLIES | COMPLETION OF THREE CLASSROOM... See more | AT ALBERTO ANTONIO PRIMARY SCHOOL GATTARAN, CAGAYAN | Rejected | 2025-09-19 10:05:20 | Returned to Applicant | DOUBLE ENTRY | |
| 944 | JC PALOMO CONSTRUCTION AND CONSTRUCTION SUPPLY | Construction of Proposed Two-S... See more | Gucab, Echague, Isabela | Rejected | 2025-09-19 10:14:21 | Returned to Applicant | Finished project | |
| 945 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF FARM TO MARKET R... See more | AT CUNIG, GATTARAN, CAGAYAN | Rejected | 2025-09-19 11:36:11 | Returned to Applicant | DOUBLE ENTRY | |
| 946 | DOLE_RO2_2025-09-23_426_Y382 | SCR CONSTRUCTION AND ENTERPRISES | DID-899-00154 CONSTRUCTION OF ... See more | DIBUL, SAGUDAY, QUIRINO | Approved | 2025-09-19 15:38:32 | Ready for Release | Processed in 3 working days. |
| 947 | J.R. MALOLOYON DESIGN AND CONSTRUCTION | CONSTRUCTION OF MULTI-CROP DRY... See more | VILLA LUNA, CAUAYAN CITY, ISABELA | Rejected | 2025-09-19 16:35:01 | Returned to Applicant | For 10 and above workers, plea... See more | |
| 948 | DOLE_RO2_2025-09-23_427_AHCY | MACST CONSTRUCTION AND SUPPLY | CONSTRUCTION OF 2 CLASSROOM W/... See more | DIDIPIO,KASIBU,NUEVA VIZCAYA | Approved | 2025-09-20 10:58:29 | Ready for Release | Processed in 2 working days. |
| 949 | DOLE_RO2_2025-09-23_428_EV8H | Infra Towers Philippines | E02909-B06-NS-TER24-B224 | Brgy. Dipantan, Nagtipunan, Quirino | Approved | 2025-09-23 08:16:49 | Ready for Release | Processed in 1 working days. |
| 950 | Wealthmore Construction and Supply Corporation | CW301/B: Design and Build of ... See more | Carig Norte, Tuguegarao City, Cagayan | Rejected | 2025-09-23 09:03:29 | Returned to Applicant | NO CSHP APPLICATION ATTACHED, ... See more | |
| 951 | DOLE_RO2_2025-09-23_429_R26Y | BENSON BUILDERS | IMPROVEMENT OF FARM TO MARKET... See more | KASIBU, NUEVA VIZCAYA | Approved | 2025-09-23 09:34:53 | Ready for Release | Processed in 1 working days. |
| 952 | DOLE_RO2_2025-09-23_430_7TFN | M & F ENTERPRISE | CONCRETING OF BARANGAY ROADS A... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-09-23 09:39:24 | Ready for Release | Processed in 1 working days. |
| 953 | DOLE_RO2_2025-09-23_421_FEPS | JC SOLIDARITY CONSTRUCTION | 2025-MARIIS-DIII-EGPIP-04 PACK... See more | ROXAS, ISABELA | Approved | 2025-09-23 10:20:05 | Ready for Release | Processed in 1 working days. |
| 954 | DOLE_RO2_2025-09-23_422_DKAO | ASC CONSTRUCTION AND CONCRETE PRODUCTS | 2025-MARIIS-DIII-EGPIP-05 PACK... See more | ROXAS, ISABELA | Approved | 2025-09-23 10:28:29 | Ready for Release | Processed in 1 working days. |
| 955 | DOLE_RO2_2025-09-23_423_23FS | JC SOLIDARITY CONSTRUCTION | 2025-D3-EGPIP-QUIRINO-C CONSTR... See more | QUIRINO, ISABELA | Approved | 2025-09-23 10:30:48 | Ready for Release | Processed in 1 working days. |
| 956 | Infra Towers Philippines | PTCGG0018_OWO-2023-001 | Brgy. Penge-Ruyu, Tuguegarao City Cagayan | Rejected | 2025-09-23 15:14:34 | Returned to Applicant | NO CERTIFICATE OF EMPLOYMENT O... See more | |
| 957 | DOLE_RO2_2025-09-30_437_A0LX | Infra Towers Philippines | PTCGG0018_OWO-2023-001 | Brgy. Penge-Ruyu, Tuguegarao City Cagayan | Approved | 2025-09-23 15:40:58 | Ready for Release | Processed in 5 working days. |
| 958 | Infra Towers Philippines | E02940-B06_NS-TER24-G515 | Brgy. Nabbuan, Santiago City Isabela | Rejected | 2025-09-23 16:38:39 | Returned to Applicant | DOUBLE ENTRY | |
| 959 | RTC CONSTRUCTION ANDSUPPLY | REPAIR/ REHABILITATION OF GID ... See more | CARIG, TUGUEGARAO CITY | Rejected | 2025-09-23 17:02:22 | Returned to Applicant | LETTER OF INTENT MUST BE ADRES... See more | |
| 960 | RBGONZALES OPC | 791.10 kWp/700 kW AC ROOF-TOP ... See more | SM CITY CAUAYAN, MAHARLIKA HW. BRGY DISTRICT 2, CAUAYAN CITY | Rejected | 2025-09-23 17:13:46 | Returned to Applicant | No signature of AMO at upper r... See more | |
| 961 | DOLE_RO2_2025-09-29_435_F1JQ | JAN PAOLA CONSTRUCTION INC. | CONSTRUCTION OF LOCAL ROAD IN ... See more | SAN MIGUEL, LUNA, ISABELA | Approved | 2025-09-24 08:57:30 | Ready for Release | Processed in 4 working days. |
| 962 | DOLE_RO2_2025-09-25_431_YRB2 | WINLEI CONSTRUCTION AND SUPPLY | REHABILITATION OF THE MATERIAL... See more | Brgy. Magsaysay, Bayombong, Nueva Vizcaya | Approved | 2025-09-24 09:35:37 | Ready for Release | Processed in 2 working days. |
| 963 | RTC CONSTRUCTION AND SUPPLY | CONSTRUCTION OF PERIMETER FENC... See more | LALLO, CAGAYAN | Rejected | 2025-09-24 11:27:52 | Returned to Applicant | CHE TESTING NOT RELATED TO RTC... See more | |
| 964 | DOLE_RO2_2025-09-25_432_BN85 | JS AND ASSOCIATES CONSTRUCTION AND DEVELOPMENT, INC. | PH020192 | BRGY VILLA QUIRINO, BAGABAG, NUEVA VIZCAYA | Approved | 2025-09-24 11:53:46 | Ready for Release | Processed in 2 working days. |
| 965 | Infra Towers Philippines | E02940-B06_NS-TER24-G515 | Brgy. Nabbuan, Santiago City Isabela | Rejected | 2025-09-24 13:44:55 | Returned to Applicant | DOUBLE ENTRY | |
| 966 | STEC PHILS INC | Smart Water Management Project... See more | Barangay Minanga, Aparri and surrounding service areas | Rejected | 2025-09-24 13:47:09 | Returned to Applicant | NOT USE UPDATED CSHP FORMS AND... See more | |
| 967 | DOLE_RO2_2025-09-30_439_PKNX | Infra Towers Philippines | E02940-B06_NS-TER24-G515 | Brgy. Nabbuan, Santiago City Isabela | Approved | 2025-09-24 13:57:25 | Ready for Release | Processed in 4 working days. |
| 968 | Infra Towers Philippines | Infra Towers Philippines | Brgy. Diego Silang, Diffun, Quirino | Rejected | 2025-09-24 14:00:08 | Returned to Applicant | Re apply for CSHP application.... See more | |
| 969 | Infra Towers Philippines | E02931-B06_NS-TER24-B185 | Brgy. Diego Silang, Diffun, Quirino | Rejected | 2025-09-24 14:01:37 | Returned to Applicant | PLease re apply and click on Q... See more | |
| 970 | 3JMS CONSTRUCTION | Construction of Slope Protecti... See more | Zone 1 & 2, Canagatan, Baggao, Cagayan | Rejected | 2025-09-24 14:22:59 | Returned to Applicant | CHE TESTING EXPIRED | |
| 971 | DOLE_RO2_2025-09-30_440_UQR4 | 3JMS CONSTRUCTION | Construction of Slope Protecti... See more | Dalin, Baggao, Cagayan | Approved | 2025-09-24 14:51:55 | Ready for Release | Processed in 4 working days. |
| 972 | Lancesoft Infra Solution Inc | E02878 B06 / NS-TER24 B113 | BARANGAY LUBLUB POBLACION ALFONSO CASTANEDA NUEVA VIZCAYA | Rejected | 2025-09-24 15:06:53 | Returned to Applicant | pcab inconsistent with applica... See more | |
| 973 | 5MJ'S CONSTRUCTION | COMPLETION OF 2CL BUILDING( TA... See more | TAMBAN, ALCALA, CAGAYAN | Rejected | 2025-09-24 15:07:01 | Returned to Applicant | finished project | |
| 974 | STEC PHILS INC | Smart Water Management Project... See more | Barangay Minanga, Aparri and surrounding service areas | Rejected | 2025-09-24 15:24:06 | Returned to Applicant | DID NOT USE UPDATED CSHP TEMPL... See more | |
| 975 | BMJ BUILDERS | Provision of Labor and Materia... See more | Regional Government Center, Carig Sur, Tuguegarao City, Cagayan | Rejected | 2025-09-24 16:53:35 | Returned to Applicant | CSHP APPLICATION NOT PROPERLY ... See more | |
| 976 | Wealthmore Construction and Supply Corporation-WERR Corporation International/JV | CW301/B: Design and Build of ... See more | Carig Norte, Tuguegarao City, Cagayan | Rejected | 2025-09-25 08:14:56 | Returned to Applicant | LETTER OF INTENT MUST BE ADDRE... See more | |
| 977 | DOLE_RO2_2025-09-30_456_FKRF | yumadag builders | Proposed Building of Jollibee ... See more | Centro 4, Tuguegarao City, Cagayan | Approved | 2025-09-25 08:29:33 | Ready for Release | Processed in 4 working days. |
| 978 | RCS Solar and Electrical Installation Services | 10kw Hybrid Solar Power System | Vizcalang St. Calao East, Santiago City | Rejected | 2025-09-25 10:36:37 | Returned to Applicant | NO PCAB | |
| 979 | RCS Solar and Electrical Installation Services | 10kw Hybrid Solar Power System | Ipil St. Rosario, Santiago City | Rejected | 2025-09-25 10:40:05 | Returned to Applicant | NO PCAB | |
| 980 | RCS Solar and Electrical Installation Services | 10kw Hybrid Solar Power System | Purok 1, Buenavista, Santiago City | Rejected | 2025-09-25 10:41:08 | Returned to Applicant | No PCAB | |
| 981 | DEKM CONSTRUCTION | IMPROVEMENT/UPGRADING OF MUNIC... See more | BARANGAY II, ENRILE, CAGAYAN | Rejected | 2025-09-25 13:02:38 | Returned to Applicant | No NC II-certified operator fo... See more | |
| 982 | DOLE_RO2_2025-09-25_433_EOYL | BMJ BUILDERS | Provision of Labor and Materia... See more | Regional Government Center, Carig Sur, Tuguegarao City, Cagayan | Approved | 2025-09-25 14:25:25 | Ready for Release | Processed in 1 working days. |
| 983 | DOLE_RO2_2025-09-25_434_ULW1 | J.A.N CONSTRUCTION | MEO-DF-2025-019 - CONCRETING O... See more | BRGY. DISTRICT IV, BAYOMBONG, NUEVA VIZCAYA. | Approved | 2025-09-25 15:12:18 | Ready for Release | Processed in 1 working days. |
| 984 | Duwa Construction | Supply, Delivery and Installat... See more | Gonzaga, Cagayan Sta. Ana, Cagayan Amulung, Cagayan Penablanca, Cagayan Camalaniugan, Cagayan Gattaran, Cagayan Buguey, Cagayan Lasam, Cagayan Baggao, Cagayan | Rejected | 2025-09-25 15:24:03 | Returned to Applicant | COMPLETED/ FINISHED PROJECT | |
| 985 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF AFUSING DAGA... See more | AFUSING DAGA, ALCALA, CAG | Rejected | 2025-09-25 15:30:12 | Returned to Applicant | - UNSIGNED APPLICATION FORM | |
| 986 | DOLE_RO2_2025-09-30_457_QR5J | DEKM CONSTRUCTION | CONSTRUCTION OF BOX CULVERT AT... See more | E. SALVADOR STREET, SAN JOSE, BAGGAO, CAGAYAN | Approved | 2025-09-26 08:18:39 | Ready for Release | Processed in 3 working days. |
| 987 | DOLE_RO2_2025-09-30_441_H27R | SMT CONSTRUCTION | 2025-06- Lot 6 - Repair/Improv... See more | Capitol Compound, Alibagu, City of Ilagan, Isabela | Approved | 2025-09-26 10:55:55 | Ready for Release | Processed in 2 working days. |
| 988 | DOLE_RO2_2025-09-29_436_HU3L | SMT CONSTRUCTION | 2025-06- Lot 7 - Repair/Improv... See more | Capitol Compound, Alibagu, City of Ilagan, Isabela | Approved | 2025-09-26 11:07:20 | Ready for Release | Processed in 1 working days. |
| 989 | DOLE_RO2_2025-09-30_442_A9CI | SMT CONSTRUCTION | 2025-06- Lot 8 - Repair/Improv... See more | Capitol Compound, Alibagu, City of Ilagan, Isabela | Approved | 2025-09-26 11:20:26 | Ready for Release | Processed in 2 working days. |
| 990 | SMT CONSTRUCTION | 2025-06- Lot 6 - Repair/Improv... See more | Capitol Compound, Alibagu, City of Ilagan, Isabela | Rejected | 2025-09-26 11:24:01 | Returned to Applicant | ISABELA FIELD OFFICE PROJECT | |
| 991 | SMT CONSTRUCTION | 2025-06- Lot 7 - Repair/Improv... See more | Capitol Compound, Alibagu, City of Ilagan, Isabela | Rejected | 2025-09-26 11:26:50 | Returned to Applicant | ISABELA FIELD OFFICE PROJECT | |
| 992 | SMT CONSTRUCTION | 2025-06- Lot 8 - Repair/Improv... See more | Capitol Compound, Alibagu, City of Ilagan, Isabela | Rejected | 2025-09-26 11:29:41 | Returned to Applicant | ISABELA FIELD OFFICE PROJECT | |
| 993 | DOLE_RO2_2025-09-30_443_5PKI | SMT CONSTRUCTION | 2025-06- Lot 9 - Repair/Improv... See more | Capitol Compound, Alibagu, City of Ilagan, Isabela | Approved | 2025-09-26 11:42:28 | Ready for Release | Processed in 2 working days. |
| 994 | SMT CONSTRUCTION | 2025-06- Lot 9 - Repair/Improv... See more | Capitol Compound, Alibagu, City of Ilagan, Isabela | Rejected | 2025-09-26 11:44:38 | Returned to Applicant | ISABELA FIELD OFFICE PROJECT | |
| 995 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF AFUSING DAG... See more | AFUSING DAGA, ALCALA, CAG | Rejected | 2025-09-26 12:17:59 | Returned to Applicant | DOUBLE ENTRY | |
| 996 | DOLE_RO2_2025-09-30_448_ACV1 | SCR CONSTRUCTION AND ENTERPRISES | CONSTRUCTION OF TWO STOREY MUL... See more | PUROK 04, TRES REYES, SAGUDAY, QUIRINO | Approved | 2025-09-26 13:46:39 | Ready for Release | Processed in 2 working days. |
| 997 | MILESTONE 888 CONSTRUCTION INC. | Concreting of Road | Zone 5, San Miguel, Baggao, Cagayan | Rejected | 2025-09-26 14:17:39 | Returned to Applicant | REFER TO CSHP TEMPLATE: 6.2.SP... See more | |
| 998 | MILESTONE 888 CONSTRUCTION INC. | Construction of Bridge going t... See more | San Miguel, Baggao, Cagayan | Rejected | 2025-09-26 14:21:30 | Returned to Applicant | REFER TO CSHP TEMPLATE: 6.2.SP... See more | |
| 999 | JAN PAOLA CONSTRUCTION INC. | CONSTRUCTION OF DRAINAGE CANAL... See more | LUYAO, LUNA, ISABELA | Rejected | 2025-09-26 17:07:45 | Returned to Applicant | COMPLETED/ FINISHED PROJECT | |
| 1000 | JAN PAOLA CONSTRUCTION INC. | IMPROVEMENT OF MULTI-PURPOSE B... See more | Centro 2, Luna, Isabela | Rejected | 2025-09-26 17:13:08 | Returned to Applicant | COMPLETED/ FINISHED PROJECT | |
| 1001 | DOLE_RO2_2025-09-30_458_R0V4 | 3JMS CONSTRUCTION | Construction of Slope Protecti... See more | Zone 1 & 2, Canagatan, Baggao, Cagayan | Approved | 2025-09-26 17:51:04 | Ready for Release | Processed in 2 working days. |
| 1002 | DOLE_RO2_2025-09-30_459_YWBP | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF FARM TO MARKET R... See more | MABUNO, GATTARAN, CAGAYAN | Approved | 2025-09-27 19:49:56 | Ready for Release | Processed in 1 working days. |
| 1003 | DOLE_RO2_2025-09-30_462_WYXY | SHASHA'S CONSTRUCTION AND SUPPLIES | CONSTRUCTION OF ONE BARREL BOX... See more | CAPIDDIGAN, GATTARAN, CAG | Approved | 2025-09-27 19:54:30 | Ready for Release | Processed in 1 working days. |
| 1004 | DOLE_RO2_2025-09-30_463_T3FE | SHASHA'S CONSTRUCTION AND SUPPLIES | IMPROVEMENT OF BURAYOK FALLS A... See more | BASAO (GRILLING AREA) GATTARAN, CAGAYAN | Approved | 2025-09-27 19:58:54 | Ready for Release | Processed in 1 working days. |
| 1005 | DOLE_RO2_2025-10-01_464_ZNT5 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF FARM TO MARKET R... See more | NADDUNGAN, GATTARAN, CAGAYAN | Approved | 2025-09-28 09:55:42 | Ready for Release | Processed in 2 working days. |
| 1006 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF FARM TO MARKET R... See more | NADDUNGAN, GATTARAN, CAGAYAN | Rejected | 2025-09-28 10:06:05 | Returned to Applicant | DOUBLE ENTRY | |
| 1007 | DOLE_RO2_2025-10-01_465_X8WD | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF RAD AT SITIO PIN... See more | SITIO PINUTULAN, CAPISSAYAN NORTE, GATTARAN, CAGAYAN | Approved | 2025-09-28 10:17:42 | Ready for Release | Processed in 2 working days. |
| 1008 | DOLE_RO2_2025-10-01_466_60BR | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF ROAD AT ZONE IV... See more | ZONE IV BARACCAOIT, GATTARAN, CAGAYAN | Approved | 2025-09-28 10:43:43 | Ready for Release | Processed in 2 working days. |
| 1009 | DOLE_RO2_2025-10-01_467_2OP7 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF ROAD AT PALAGAO ... See more | PALAGAO SUR, GATTARAN, CAGAYAN | Approved | 2025-09-28 11:04:48 | Ready for Release | Processed in 2 working days. |
| 1010 | DOLE_RO2_2025-09-30_450_4TJI | POWER 4 ALL INC. | Green Lighting of Provincial C... See more | Capitol Compound, Bayombong Nueva Vizcaya | Approved | 2025-09-28 13:08:34 | Ready for Release | Processed in 1 working days. |
| 1011 | Duwa Construction | Construction of 780 meters CHB... See more | Mocag, Baggao, Cagayan | Rejected | 2025-09-29 09:19:18 | Returned to Applicant | AS TO CSHP TEMPLATE: 7.1: RESP... See more | |
| 1012 | DOLE_RO2_2025-09-30_444_KV3Y | ASC CONSTRUCTION AND CONCRETE PRODUCTS | 2025-MARIIS-DIV-EGPIP-12; Esta... See more | ISABELA | Approved | 2025-09-29 09:39:23 | Ready for Release | Processed in 1 working days. |
| 1013 | DOLE_RO2_2025-09-30_445_BINS | ASC CONSTRUCTION AND CONCRETE PRODUCTS | 2025-MARIIS-D1-EGPIP-13 ESTABL... See more | ISABELA | Approved | 2025-09-29 09:43:45 | Ready for Release | Processed in 1 working days. |
| 1014 | DOLE_RO2_2025-09-30_446_8JLZ | ASC CONSTRUCTION AND CONCRETE PRODUCTS | 2025-MARIIS-DII-EGPIP-9 ESTABL... See more | ANGADANAN, ALICIA, SAN MATEO, ISABELA | Approved | 2025-09-29 09:47:08 | Ready for Release | Processed in 1 working days. |
| 1015 | DOLE_RO2_2025-09-30_447_E6NO | ASC CONSTRUCTION AND CONCRETE PRODUCTS | 2025-MARIIS-DI-EGPIP-2 ESTABLI... See more | ANGADANAN, ECHAGUE, RAMON, CORDON, ISABELA | Approved | 2025-09-29 09:54:32 | Ready for Release | Processed in 1 working days. |
| 1016 | DOLE_RO2_2025-09-30_451_0BLU | JC SOLIDARITY CONSTRUCTION | 2025-MARIIS-DIII-EGPIP-3 ESTAB... See more | ISABELA | Approved | 2025-09-29 09:59:49 | Ready for Release | Processed in 1 working days. |
| 1017 | DOLE_RO2_2025-09-30_449_8BBF | ASC CONSTRUCTION AND CONCRETE PRODUCTS | 2025-MARIIS-DII-EGPIP-8 ESTABL... See more | ANGADANAN, CABATUAN, SAN ISIDRO, SAN MATEO, ISABELA | Approved | 2025-09-29 10:15:58 | Ready for Release | Processed in 1 working days. |
| 1018 | DOLE_RO2_2025-09-30_452_Z0A7 | ASC CONSTRUCTION AND CONCRETE PRODUCTS | CONTRACT NO. 2025-MARIIS-DIV-E... See more | CAUAYAN CITY, CABATUAN, SAN MATEO, ISABELA | Approved | 2025-09-29 10:20:36 | Ready for Release | Processed in 1 working days. |
| 1019 | DOLE_RO2_2025-09-30_453_NB4M | ASC CONSTRUCTION AND CONCRETE PRODUCTS | CONTRACT NO. 2025-MARIIS-DIV-E... See more | CAUAYAN CITY, LUNA, SAN MATEO, ALICIA, ISABELA | Approved | 2025-09-29 10:25:01 | Ready for Release | Processed in 1 working days. |
| 1020 | DOLE_RO2_2025-09-30_454_IZNO | ASC CONSTRUCTION AND CONCRETE PRODUCTS | NIA MARIIS | ECHAGUE, SAN ISIDRO, SANTIAGO, ISABELA | Approved | 2025-09-29 10:28:06 | Ready for Release | Processed in 1 working days. |
| 1021 | DOLE_RO2_2025-09-30_455_XJK2 | ASC CONSTRUCTION AND CONCRETE PRODUCTS | 2025-MARIIS-DII-EGPIP-10 ESTAB... See more | ISABELA | Approved | 2025-09-29 10:31:08 | Ready for Release | Processed in 1 working days. |
| 1022 | DOLE_RO2_2025-09-30_438_O266 | ASC CONSTRUCTION AND CONCRETE PRODUCTS | CONTRACT NO. 2025-MARIIS-DIII-... See more | AURORA, GAMU, QUIRINO, ROXAS, ISABELA | Approved | 2025-09-29 10:35:05 | Ready for Release | Processed in 1 working days. |
| 1023 | HABS CONSTRUCTION SERVICES | Repair/Rehabilitation of GID W... See more | Tumauini Isabela | Rejected | 2025-09-29 11:21:42 | Returned to Applicant | Incomplete document. (Letter o... See more | |
| 1024 | J.R. MALOLOYON DESIGN & CONSTRUCTION | CAPITAL OUTLAY CY 2025-CAUAYAN... See more | MINANTE I, CAUAYAN CITY, ISABELA | Rejected | 2025-09-29 11:25:34 | Returned to Applicant | Under DO 252, Series of 2025, ... See more | |
| 1025 | HABS CONSTRUCTION SERVICES | REPAIR/REHABILITATION OF GID W... See more | TUMAUINI, ISABELA | Rejected | 2025-09-29 11:41:34 | Returned to Applicant | Incomplete documents. ( one pa... See more | |
| 1026 | Wealthmore Construction and Supply Corporation-WERR Corporation International/JV | CW301/B: Design and Build of ... See more | Carig Norte, Tuguegarao City, Cagayan | Rejected | 2025-09-29 14:03:56 | Returned to Applicant | DOUBLE ENTRY | |
| 1027 | Infra Towers Philippines | PTCGG0018_OWO-2023-001 | Brgy. Penge-Ruyu, Tuguegarao City Cagayan | Rejected | 2025-09-29 15:45:35 | Returned to Applicant | CHANGE DATE OF LETTER OF INTEN... See more | |
| 1028 | RC CONSTRUCTION | CONSTRUCTION OF MASONRY DRAINA... See more | CUSIPAG ST. EXTENSION, CAGGAY, TUGUEGARAO CITY | Rejected | 2025-09-29 16:39:51 | Returned to Applicant | AS TO CSHP TEMPLATE UNDER SECT... See more | |
| 1029 | DOLE_RO2_2025-09-30_460_4AQG | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-87-25 REHABILI... See more | SANCHEZ MIRA, CAGAYAN | Approved | 2025-09-29 16:43:46 | Ready for Release | Processed in 1 working days. |
| 1030 | J.R. MALOLOYON DESIGN & CONSTRUCTION | CAPITAL OUTLAY CY 2025-CAUAYAN... See more | Minante I, Cauayan City, Isabela | Rejected | 2025-09-30 09:44:06 | Returned to Applicant | Application form not duly fill... See more | |
| 1031 | DOLE_RO2_2025-10-02_473_TGOJ | VB GINES CONSTRUCTION | CONSTRUCTION OF WATER TANKS AN... See more | Bayombong, Nueva Vizcaya | Approved | 2025-09-30 13:27:44 | Ready for Release | Processed in 3 working days. |
| 1032 | RTC CONSTRUCTION | REPAIR/ REHABILITATION OF GID ... See more | CARIG, CAGAYAN | Rejected | 2025-09-30 13:55:53 | Returned to Applicant | NOT PRPOERLY FILLED OUT, CUT P... See more | |
| 1033 | DOLE_RO2_2025-10-02_474_UYZG | TAMRHEY CONSTRUCTION | CONSTRUCTION OF NUTRITION BUIL... See more | BARANGAY BALZAIN, DUPAX DEL SUR, NUEVA VIZCAYA | Approved | 2025-09-30 13:59:40 | Ready for Release | Processed in 2 working days. |
| 1034 | DOLE_RO2_2025-09-30_461_TG3Z | RC CONSTRUCTION | CONSTRUCTION OF MASONRY DRAINA... See more | CUSIPAG ST. EXTENSION, CAGGAY, TUGUEGARAO CITY | Approved | 2025-09-30 14:36:51 | Ready for Release | Processed in 1 working days. |
| 1035 | VB GINES CONSTRUCTION | UPGRADING OF N.V. BENGUET JCT.... See more | KAYAPA, NUEVA VIZCAYA | Rejected | 2025-09-30 14:39:46 | Returned to Applicant | Finish project | |
| 1036 | RBGONZALES ENGINEERING SERVICES | 791.10 kWp/700 kW AC ROOF-TOP ... See more | SM CITY CAUAYAN, MAHARLIKA HW. BRGY DISTRICT 2, CAUAYAN CITY | Rejected | 2025-09-30 15:10:44 | Returned to Applicant | Cshp template not duly filled ... See more | |
| 1037 | WERR CORPORATION INTERNATIONAL | DESIGN AND BUILD FOR THE REHAB... See more | Enrile, Cagayan | Rejected | 2025-09-30 15:33:31 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 1038 | Wealthmore Construction and Supply Corporation-WERR Corporation International/JV | CW301/B: Design and Build of ... See more | Carig Norte, Tuguegarao City, Cagayan | Rejected | 2025-09-30 16:58:23 | Returned to Applicant | NO NCII FOR SCAFFOLDING AND CH... See more | |
| 1039 | DOLE_RO2_2025-10-02_475_Q128 | AMAD CONSTRUCTION SERVICES AND SUPPLY | REHABILITATION OF MASONRY DRAI... See more | TUGUEGARAO CITY | Approved | 2025-10-01 13:17:02 | Ready for Release | Processed in 2 working days. |
| 1040 | DOLE_RO2_2025-10-02_476_AO3H | Duwa Construction | Construction of 780 meters CHB... See more | Mocag, Baggao, Cagayan | Approved | 2025-10-01 14:01:26 | Ready for Release | Processed in 1 working days. |
| 1041 | DOLE_RO2_2025-10-02_477_J90F | RTC CONSTRUCTION | REPAIR/ REHABILITATION OF GID ... See more | CARIG, CAGAYAN | Approved | 2025-10-01 14:02:46 | Ready for Release | Processed in 1 working days. |
| 1042 | RTC CONSTRUCTION AND SUPPLY | CONSTRUCTION OF PERIMETER FENC... See more | LALLO, CAGAYAN | Rejected | 2025-10-01 14:14:01 | Returned to Applicant | FIRST AIDER WITH EXISTING PROJ... See more | |
| 1043 | DOLE_RO2_2025-10-02_478_UPHC | JJAP CONSTRUCTION | CONSTRUCTION OF MASONRY DRAINA... See more | ALLAM STREET, DADDA, TUGUEGARAO CITY | Approved | 2025-10-01 15:14:44 | Ready for Release | Processed in 1 working days. |
| 1044 | DOLE_RO2_2025-10-02_479_6PTM | JJAP CONSTRUCTION | CONCRETING OF ROAD ALONG WHITE... See more | TANZA, TUGUEGARAO CITY | Approved | 2025-10-01 15:31:23 | Ready for Release | Processed in 1 working days. |
| 1045 | DOLE_RO2_2025-10-02_480_N70J | JJAP CONSTRUCTION | CONSTRUCTION OF MASONRY DRAINA... See more | TANZA, TUGUEGARAO CITY | Approved | 2025-10-01 15:47:26 | Ready for Release | Processed in 1 working days. |
| 1046 | DOLE_RO2_2025-10-02_468_SU0H | PNC CONSTRUCTION | CONCRETING OF FARM-TO-MARKET R... See more | BARACCAOIT, GATTARAN, CAGAYAN | Approved | 2025-10-02 07:36:18 | Ready for Release | Processed in 1 working days. |
| 1047 | DOLE_RO2_2025-10-02_469_5MX1 | PNC CONSTRUCTION | CONCRETING OF ROAD | SITIO PADUNGSOL, BARANGAY BASAOM GATTARAN, CAGAYAN | Approved | 2025-10-02 07:43:54 | Ready for Release | Processed in 1 working days. |
| 1048 | DOLE_RO2_2025-10-02_470_NV5F | PNC CONSTRUCTION | CONCRETING OF SAN CARLOS - T. ... See more | GATTARAN, CAGAYAN | Approved | 2025-10-02 07:47:03 | Ready for Release | Processed in 1 working days. |
| 1049 | DOLE_RO2_2025-10-02_471_K7SJ | PNC CONSTRUCTION | CONCRETING OF FARM TO MARKET R... See more | SAN VICENTE, GATTARAN, CAGAYAN | Approved | 2025-10-02 07:49:09 | Ready for Release | Processed in 1 working days. |
| 1050 | DOLE_RO2_2025-10-02_472_CWYB | PNC CONSTRUCTION | CONCRETING OF ROAD WITH SLOPE ... See more | TALIGAN, GATTARAN, CAGAYAN | Approved | 2025-10-02 07:51:24 | Ready for Release | Processed in 1 working days. |
| 1051 | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF AFUSING DAGA... See more | AFUSING DAGA, ALCALA, CAG | Rejected | 2025-10-02 09:23:22 | Returned to Applicant | DOUBLE ENTRY | |
| 1052 | DEKM CONSTRUCTION | IMPROVEMENT/UPGRADING OF MUNIC... See more | BARANGAY II, ENRILE, CAGAYAN | Rejected | 2025-10-02 11:36:10 | Returned to Applicant | DOUBLE ENTRY | |
| 1053 | DOLE_RO2_2025-10-06_481_J3TE | SHASHA'S CONSTRUCTION AND SUPPLIES | REHABILITATION OF AFUSING DAGA... See more | AFUSING DAGA, ALCALA, CAG | Approved | 2025-10-02 15:12:36 | Ready for Release | Processed in 2 working days. |
| 1054 | DOLE_RO2_2025-10-06_482_9J06 | DEKM CONSTRUCTION | IMPROVEMENT/UPGRADING OF MUNIC... See more | BARANGAY II, ENRILE, CAGAYAN | Approved | 2025-10-02 15:25:03 | Ready for Release | Processed in 2 working days. |
| 1055 | DOLE_RO2_2025-10-08_484_85BL | SHASHA'S CONSTRUCTION AND SUPPLIES | IMPROVEMENT OF MEDITATION CROS... See more | CENTRO SUR, GATTARAN, CAGAYAN | Approved | 2025-10-06 08:44:57 | Ready for Release | Processed in 3 working days. |
| 1056 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONSTRUCTION OF THREE (3) CLAS... See more | SITIO PIAS MABUNO, GATTARAN, CAG | Rejected | 2025-10-06 09:37:17 | Returned to Applicant | NO NCII FOR SCAFFOLDING AND EL... See more | |
| 1057 | DOLE_RO2_2025-10-13_488_8HKZ | DKB CONSTRUCTION | CONSTRUCTION OF BOX CULVERT (C... See more | ASINGA-VIA, BAGGAO, CAGAYAN | Approved | 2025-10-06 12:34:25 | Ready for Release | Processed in 5 working days. |
| 1058 | J.A. UBONGEN CONSTRUCTION | Lot72 Repair/Rehabilitation of... See more | Barangay Ayod Dinapigue Isabela | Rejected | 2025-10-06 13:19:51 | Returned to Applicant | the designated first aider's c... See more | |
| 1059 | DOLE_RO2_2025-10-08_483_8MJM | JHUERS CONSTRUCTION | OPENING & IMPROVEMENT OF U... See more | BARANGAY BUENAVISTA, NUEVA VIZCAYA | Approved | 2025-10-06 14:56:48 | Ready for Release | Processed in 2 working days. |
| 1060 | DOLE_RO2_2025-10-08_485_764J | VB GINES CONSTRUCTION | UPGRADIG OF N.V. BENGUET JCT.-... See more | KAYAPA, NUEVA VIZCAYA | Approved | 2025-10-07 15:41:17 | Ready for Release | Processed in 1 working days. |
| 1061 | CCT CONSTRUCTORS CORPORATION | PROPOSED MITSUBISHI ELECTRIC R... See more | Mt. Leson, San Vicente, Sta. Ana, Cagayan Valley | Rejected | 2025-10-07 15:49:51 | Returned to Applicant | NOT USE DOLE CSHP TEMPLATE | |
| 1062 | MASTER Z CONSTRUCTION SERVICES | CONSTRUCTION OF ROAD(KIMAYONG-... See more | Purok 4, School Site, Malabing, Kasibu, Nueva Vizcaya | Rejected | 2025-10-07 16:07:56 | Returned to Applicant | FINISHED/ COMPLETED PROJECT | |
| 1063 | PS CIVIL ENGINEERING CONSTRUCTION | Construction of Multi-Purpose ... See more | Sto. Tomas, Saguday, Quirino | Rejected | 2025-10-07 16:53:26 | Returned to Applicant | 1. No attached First Aider ID ... See more | |
| 1064 | RCDG CONSTRUCTION CORPORATION | DESIGN AND BUILD FOR THE CONST... See more | Municipal Center, Barangay 2, Enrile, Cagayan | Rejected | 2025-10-08 08:15:51 | Returned to Applicant | NOT USE UPDATED CSHP TEMPLATE ... See more | |
| 1065 | WERR CORPORATION INTERNATIONAL | DESIGN AND BUILD FOR THE REHAB... See more | Enrile, Cagayan | Rejected | 2025-10-08 08:23:40 | Returned to Applicant | NOT USE DOLE CSHP TEMPLATE | |
| 1066 | DOLE_RO2_2025-10-08_486_538J | JOVIC CONSTRUCTION AND SUPPLY | Construction of Communal Irrig... See more | Barangay Luyang, Bayombong, Nueva Vizcaya | Approved | 2025-10-08 08:53:10 | Ready for Release | Processed in 1 working days. |
| 1067 | J.A. Ubongen Construction | Repair/Rehabilitaion of Ayod B... See more | Brgy. Ayod, Dinapigue, Isabela | Rejected | 2025-10-08 09:26:03 | Returned to Applicant | FINISHED/ COMPLETED PROJECT | |
| 1068 | DOLE_RO2_2025-10-08_487_HBPR | 3JMS CONSTRUCTION | Construction/Continuation of C... See more | Zone 4, Masical, Baggao, Cagayan | Approved | 2025-10-08 11:26:12 | Ready for Release | Processed in 1 working days. |
| 1069 | CCT CONSTRUCTORS CORPORATION | PROPOSED MITSUBISHI ELECTRIC R... See more | Mt. Leson, San Vicente, Sta. Ana, Cagayan Valley | Rejected | 2025-10-08 13:31:30 | Returned to Applicant | NO CSHP TEMPLATE ATTACHED | |
| 1070 | DOLE_RO2_2025-10-14_492_B1AN | DECA CONSTRUCTION | Development of Lasam Town Cent... See more | CENTRO 01, LASAM, CAGAYAN | Approved | 2025-10-08 13:34:12 | Ready for Release | Processed in 5 working days. |
| 1071 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONSTRUCTION OF THREE (3) CLAS... See more | SITIO PIAS MABUNO, GATTARAN, CAGAYAN | Rejected | 2025-10-08 13:47:25 | Returned to Applicant | ATTACHED PENDING APPLICATION F... See more | |
| 1072 | MIZRACH'S CONSTRUCTION SERVICES | REPAINTING, FABRICATION AND IN... See more | General Aguinaldo, Ramon, Isabela | Rejected | 2025-10-08 16:23:45 | Returned to Applicant | No signature of the project ow... See more | |
| 1073 | DOLE_RO2_2025-10-13_489_BLCM | JIT BUILDERS | Construction of stone masonry ... See more | Mangandingay, Cabarroguis, Quirino | Approved | 2025-10-09 09:04:42 | Ready for Release | Processed in 3 working days. |
| 1074 | DOLE_RO2_2025-10-13_490_LGEO | JIT BUILDERS | Improvement / Concreting of fa... See more | Villa Santiago, Aglipay, Quirino | Approved | 2025-10-09 09:09:50 | Ready for Release | Processed in 3 working days. |
| 1075 | JKA-Ver Construction and Engineering Services | FTAP-GLOBE ROLLOUT PROJECT | BRGY. BONE SOUTH, ARITAO, NUEVA VIZCAYA | Rejected | 2025-10-09 09:24:36 | Returned to Applicant | DUplicate | |
| 1076 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONSTRUCTION OF THREE (3) CLAS... See more | SITIO PIAS MABUNO, GATTARAN, CAGAYAN | Rejected | 2025-10-09 09:39:21 | Returned to Applicant | ATTACHED PENDING APPLICATION F... See more | |
| 1077 | HABS CONSTRUCTION SERVICES | REPAIR/REHABILITATION OF GID W... See more | TUMAUINI, ISABELA | Rejected | 2025-10-09 09:57:44 | Returned to Applicant | 1. CSHP template not duly fill... See more | |
| 1078 | DOLE_RO2_2025-10-14_493_6YD0 | RBGONZALES ENGINEERING SERVICES | 791.10 kWp/700 kW AC ROOF-TOP ... See more | SM CITY CAUAYAN, MAHARLIKA HW. BRGY DISTRICT 2, CAUAYAN CITY | Approved | 2025-10-09 15:52:02 | Ready for Release | Processed in 3 working days. |
| 1079 | RJR'S CONSTRUCTION | CONCRETING OF ROAD AT ZONE 3,C... See more | CATUGAY,BAGGAO,CAGAYAN | Rejected | 2025-10-09 16:51:29 | Returned to Applicant | NUNDER SECTION 6.2, SPECIALIZE... See more | |
| 1080 | DOLE_RO2_2025-10-14_494_3CXT | JMD-68 BUILDERS | PB-CW-2025-070 - IMPROVEMENT/C... See more | SAN RAMON, AGLIPAY, QUIRINO | Approved | 2025-10-10 08:15:42 | Ready for Release | Processed in 3 working days. |
| 1081 | DOLE_RO2_2025-10-14_495_SRRH | JMD-68 BUILDERS | PB-CW-2025-074 - COMPLETION OF... See more | VILLA SANTIAGO, AGLIPAY, QUIRINO | Approved | 2025-10-10 08:18:19 | Ready for Release | Processed in 3 working days. |
| 1082 | GCPK CONSTRUCTION AND SUPPLY | REAPAIR AND REHABILITATION OF ... See more | ANGADANAN, ISABELA | Rejected | 2025-10-10 10:31:46 | Returned to Applicant | For workers with 10 and above ... See more | |
| 1083 | DOLE_RO2_2025-10-14_496_JALJ | MASTER Z CONSTRUCTION SERVICES | CONSTRUCTION OF ROAD(KIMAYONG-... See more | Purok 4, School Site, Malabing, Kasibu, Nueva Vizcaya | Approved | 2025-10-10 10:40:02 | Ready for Release | Processed in 3 working days. |
| 1084 | GCPK CONSTRUCTION AND SUPPLY | REAPAIR AND REHABILITATION OF ... See more | ALICIA, ISABELA | Rejected | 2025-10-10 11:14:11 | Returned to Applicant | For 10 and above workers, we n... See more | |
| 1085 | GCPK CONSTRUCTION AND SUPPLY | REAPAIR AND REHABILITATION OF ... See more | ANGADANAN, ISABELA | Rejected | 2025-10-10 11:27:47 | Returned to Applicant | double entry | |
| 1086 | GCPK CONSTRUCTION AND SUPPLY | REAPAIR AND REHABILITATION OF ... See more | ECHAGUE, ISABELA | Rejected | 2025-10-10 11:54:06 | Returned to Applicant | For 10 and above workers, 2 sa... See more | |
| 1087 | GCPK CONSTRUCTION AND SUPPLY | REAPAIR AND REHABILITATION OF ... See more | SAN GUILLERMO | Rejected | 2025-10-10 12:12:18 | Returned to Applicant | For 10 and above workers, 2 sa... See more | |
| 1088 | GENTEN BUILDERS | CONSTRUCTION OF MASONRY DRAINA... See more | PALLUA SUR, TUGUEGARAO CITY | Rejected | 2025-10-13 08:16:13 | Returned to Applicant | UNDER SECTION 7.1: RESPONSIBLE... See more | |
| 1089 | DOLE_RO2_2025-10-14_497_32XU | JC SOLIDARITY CONSTRUCTION | EMERGENCY REPAIR OF DAMAGED SI... See more | CABAGAN, ISABELA | Approved | 2025-10-13 08:56:15 | Ready for Release | Processed in 2 working days. |
| 1090 | GENTEN BUILDERS | CONSTRUCTION OF MULTI-PURPOSE ... See more | Buntun, Tuguegarao City | Rejected | 2025-10-13 08:56:18 | Returned to Applicant | UNDER SECTION 7.1: RESPONSIBLE... See more | |
| 1091 | DOLE_RO2_2025-10-14_498_CK1E | JC SOLIDARITY CONSTRUCTION | SVP-INFA-ISA02-25-RPCIS-USOL C... See more | JONES, ISABELA | Approved | 2025-10-13 08:58:50 | Ready for Release | Processed in 2 working days. |
| 1092 | DOLE_RO2_2025-10-14_499_VOOK | JC SOLIDARITY CONSTRUCTION | SVP-INFRA-ISA01-25-CO-MRIS CON... See more | MALLIG, ISABELA | Approved | 2025-10-13 09:01:41 | Ready for Release | Processed in 2 working days. |
| 1093 | DOLE_RO2_2025-10-13_491_3VU4 | FASTBUILT CONSTRUCTION, INC. | CONSTRUCTION OF 1 UNIT CLASSRO... See more | POBLACION, BAGGAO, CAGAYAN | Approved | 2025-10-13 09:06:58 | Ready for Release | Processed in 1 working days. |
| 1094 | TDA CONSTRUCTION | MULTI-PURPOSE BUILDING | NATAPPIAN SOLANA CAGAYAN | Rejected | 2025-10-13 09:45:25 | Returned to Applicant | CSHP TEMPLATE UNDER SECTION 7.... See more | |
| 1095 | JOHN 6:51 BUILDERS | CONSTRUCTION OF MASONRY DRAINA... See more | DEL ROSARIO ST., CENTRO 05,TUGUEGARAO CITY | Rejected | 2025-10-13 10:50:46 | Returned to Applicant | UNDER CSHP APPLICATION; NO SIG... See more | |
| 1096 | GENTEN BUILDERS | REPAIR/REHABILITATION OF GATTA... See more | GATTARAN, CAGAYAN | Rejected | 2025-10-13 13:06:27 | Returned to Applicant | UNDER SECTION 7.1: RESPONSIBLE... See more | |
| 1097 | GENTEN BUILDERS | REPAIR/REHABILITATION OF DIR. ... See more | GATTARAN, CAGAYAN | Rejected | 2025-10-13 13:12:12 | Returned to Applicant | UNDER CSHP TEMPLATE; SECTION 7... See more | |
| 1098 | DOLE_RO2_2025-10-14_500_RLM7 | EDWIN ERWIN SISON CONSTRUCTION | REHABILITATION OF PATHWAY AND ... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-10-14 13:27:13 | Ready for Release | Processed in 1 working days. |
| 1099 | DOLE_RO2_2025-10-20_502_MKQE | SKYELER'S CONSTRUCTION SERVICES | REHABILITATION OF LA TORRE- V... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-10-14 13:31:35 | Ready for Release | Processed in 5 working days. |
| 1100 | B. FLORES CONSTRUCTION & SUPPLY | IMPROVEMENT OF BARANGAY MULTI-... See more | DUPAX DEL NORTE, NUEVA VIZCAYA | Rejected | 2025-10-14 13:55:08 | Returned to Applicant | Expired PCAB. Please provide p... See more | |
| 1101 | DOLE_RO2_2025-10-14_501_MNMS | HANILING CONSTRUCTION | Improvement of CBE Building fo... See more | NVSU, Bayombong, Nueva Vizcaya | Approved | 2025-10-14 13:57:05 | Ready for Release | Processed in 1 working days. |
| 1102 | SKYELER'S CONSTRUCTION SERVICES | CONSTRUCTION OF COMMUNAL IRRIG... See more | BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-10-14 14:23:51 | Returned to Applicant | COSH CERTIFICATE IS REQUIRED | |
| 1103 | DOLE_RO2_2025-10-22_504_GZ2V | GCPK CONSTRUCTION AND SUPPLY | REAPAIR AND REHABILITATION OF ... See more | ANGADANAN, ISABELA | Approved | 2025-10-20 14:29:06 | Ready for Release | Processed in 3 working days. |
| 1104 | A-Czar18 Construction | PB-CW-2025-020 - Improvement/C... See more | Cabaruan, Maddela, Quirino | Rejected | 2025-10-14 14:44:01 | Returned to Applicant | completed/finished project | |
| 1105 | A-Czar18 Construction | PB-CW-2025-027 Poblacion Sur | Poblacion Sur, Maddela, Quirino | Rejected | 2025-10-14 15:17:18 | Returned to Applicant | Completed/Finished Project | |
| 1106 | GCPK CONSTRUCTION AND SUPPLY | REAPAIR AND REHABILITATION OF ... See more | ANGADANAN, ISABELA | Rejected | 2025-10-14 15:28:41 | Returned to Applicant | same safety officer and first ... See more | |
| 1107 | A-Czar18 Construction | PB-CW-2025-021 FTMR Dipintin | Dipintin, Maddela, Quirino | Rejected | 2025-10-14 16:22:11 | Returned to Applicant | Completed/Finished Project | |
| 1108 | CCT CONSTRUCTORS CORPORATION | PROPOSED MITSUBISHI ELECTRIC R... See more | Mt. Leson, San Vicente, Sta. Ana, Cagayan Valley | Rejected | 2025-10-15 07:35:32 | Returned to Applicant | INCOMPLETE ATTACHEMENT. NOT IN... See more | |
| 1109 | HABS CONSTRUCTION SERVICES | REPAIR/REHABILITATION OF GID W... See more | TUMAUINI, ISABELA | Rejected | 2025-10-15 10:42:07 | Returned to Applicant | Completed/Already Finished pro... See more | |
| 1110 | B. FLORES COMSTRUCTION & SUPPLY | IMPROVEMENT OF BARANGAY MULTI-... See more | BARANGAY INEANGAN, DUPAX DEL NORTE, NUEVA VIZCAYA | Rejected | 2025-10-15 11:58:09 | Returned to Applicant | Completed/Finished Projects | |
| 1111 | Wealthmore Construction and Supply Corporation-WERR Corporation International/JV | CW301/B: Design and Build of ... See more | Carig Norte, Tuguegarao City, Cagayan | Rejected | 2025-10-15 15:07:12 | Returned to Applicant | The required First Aid Certifi... See more | |
| 1112 | OUA CONSTRUCTION | CONSTRUCTION AND OPENING OF S... See more | SAN MIGUEL TO DADAP, LUNA, ISABELA | Rejected | 2025-10-17 10:26:22 | Returned to Applicant | SO Sales no additional hours o... See more | |
| 1113 | DOLE_RO2_2025-10-22_505_CU4W | J.R. MALOLOYON DESIGN AND CONSTRUCTION | CAPITAL OUTLAY CY 2025-CAUAYAN... See more | Minante I, Cauayan City, Isabela | Approved | 2025-10-17 13:50:02 | Ready for Release | Processed in 4 working days. |
| 1114 | DULCA CONSTRUCTION SERVICES | 2024-16i: IMPROVEMENT OF MINI-... See more | NUEVA VIZCAYA STATE UNIVERSITY, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-10-17 15:21:24 | Returned to Applicant | Finished/Completed Project Alr... See more | |
| 1115 | DOLE_RO2_2025-10-22_506_EJBJ | NAJU-SHRINE CONSTRUCTION SERVICES | IMPTOVEMENT OF FARM TO MARKET ... See more | BRGY. BUA, KASIBU, NUEVA VIZCAYA | Approved | 2025-10-17 17:19:34 | Ready for Release | Processed in 3 working days. |
| 1116 | DOLE_RO2_2025-10-22_507_HYSE | NAJU-SHRINE CONSTRUCTION SERVICES | IMPROVEMENT OF FARM TO MARKET ... See more | BRGY. BUA, KASIBU, NUEVA VIZCAYA | Approved | 2025-10-17 17:23:01 | Ready for Release | Processed in 3 working days. |
| 1117 | DOLE_RO2_2025-10-22_508_RYAJ | E.H. MILIO CONSTRUCTION | IMPROVEMENT OF ROAD GOING TO M... See more | BRGY. DINE, KASIBU, NUEVA VIZCAYA | Approved | 2025-10-17 17:27:37 | Ready for Release | Processed in 3 working days. |
| 1118 | BGS INFRATECH CONSTRUCTION | IMPROVEMENT OF EXISTING PLUMBI... See more | BATAL, SANTIAGO CITY | Rejected | 2025-10-17 18:47:48 | Returned to Applicant | JOHN JERIC T. ILAGAN is both t... See more | |
| 1119 | MIZRACH'S CONSTRUCTION SERVICES | REPAINTING, FABRICATION AND IN... See more | General Aguinaldo, Ramon, Isabela | Rejected | 2025-10-20 07:53:10 | Returned to Applicant | With the ongoing project of Sa... See more | |
| 1120 | TDA CONSTRUCTION | MULTI-PURPOSE BUILDING | NATAPPIAN SOLANA CAGAYAN | Rejected | 2025-10-20 11:02:46 | Returned to Applicant | NO TOOLBOX MEETING FORM ATTACH... See more | |
| 1121 | TDA CONSTRUCTION | MULTI-PURPOSE BUILDING | NATAPPIAN SOLANA CAGAYAN | Rejected | 2025-10-20 11:29:05 | Returned to Applicant | NOT ATTACHED FORMS/DOCUMENT US... See more | |
| 1122 | DOLE_RO2_2025-10-22_509_DQO2 | SHASHA'S CONSTRUCTION AND SUPPLIES | CONSTRUCTION OF THREE (3) CLAS... See more | SITIO PIAS MABUNO, GATTARAN, CAG | Approved | 2025-10-20 12:16:01 | Ready for Release | Processed in 3 working days. |
| 1123 | CCT CONSTRUCTORS CORPORATION | PROPOSED MITSUBISHI ELECTRIC R... See more | Mt. Leson, San Vicente, Sta. Ana, Cagayan Valley | Rejected | 2025-10-20 15:00:16 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 1124 | DOLE_RO2_2025-10-21_503_3H9H | TDA CONSTRUCTION | MULTI-PURPOSE BUILDING | NATAPPIAN SOLANA CAGAYAN | Approved | 2025-10-20 16:50:38 | Ready for Release | Processed in 1 working days. |
| 1125 | DOLE_RO2_2025-10-23_510_ECYT | J.R. MALOLOYON DESIGN AND CONSTRUCTION | CONSTRUCTION OF MULTI-CROP DRY... See more | VILLA LUNA, CAUAYAN CITY, ISABELA | Approved | 2025-10-20 16:57:21 | Ready for Release | Processed in 3 working days. |
| 1126 | MIZRACH'S CONSTRUCTION SERVICES | REPAINTING, FABRICATION AND IN... See more | General Aguinaldo, Ramon, Isabela | Rejected | 2025-10-21 09:17:52 | Returned to Applicant | EXPIRED PCAB | |
| 1127 | DOLE_RO2_2025-10-23_511_HIID | B.FLROES CONSTRUCTION & SUPPLY | IMPROVEMENT OF BARANGAY MULTI-... See more | BARANGAY INEANGAN, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-10-21 09:38:19 | Ready for Release | Processed in 2 working days. |
| 1128 | DOLE_RO2_2025-10-27_513_7G7F | RJR'S CONSTRUCTION | PROCUREMENT OF CONSTRUCTION OF... See more | AWALLAN,BAGGAO,CAGAYAN | Approved | 2025-10-21 13:15:07 | Ready for Release | Processed in 4 working days. |
| 1129 | DOLE_RO2_2025-10-27_514_4XTM | RJR'S CONSTRUCTION | PROCUREMENT OF CONSTRUCTION/CO... See more | TALLANG,BAGGAO,CAGAYAN | Approved | 2025-10-21 13:19:40 | Ready for Release | Processed in 4 working days. |
| 1130 | DOLE_RO2_2025-10-27_515_DYPW | RJR'S CONSTRUCTION | PROCUREMENT OF CONCRETING OF F... See more | BUNUGAN,BAGGAO,CAGAYAN | Approved | 2025-10-21 13:23:17 | Ready for Release | Processed in 4 working days. |
| 1131 | JHUERS CONSTRUCTION | PB-CW-2025- 083 IMPROVEMENT/ C... See more | TRES REYES, SAGUDAY, QUIRINO | Rejected | 2025-10-21 15:56:47 | Returned to Applicant | ALMOST COMPLETE PROJECT | |
| 1132 | GOLDEN H8 CONSTRUCTION | Continuation of Gymnasium | Brgy. Nangalinan, Baggao, Cagayan | Rejected | 2025-10-21 16:18:25 | Returned to Applicant | REFER TO CSHP TEMPLATE: xvi: i... See more | |
| 1133 | JHUERS CONSTRUCTION | PB-CW-2025-068 IMPROVEMENT/ CO... See more | VILLA PASCUA, DIFFUN, QUIRINO | Rejected | 2025-10-21 16:33:57 | Returned to Applicant | almost finished project | |
| 1134 | DOLE_RO2_2025-10-27_516_CZPJ | SKYELER'S CONSTRUCTION SERVICES | CONSTRUCTION OF COMMUNAL IRRIG... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-10-21 17:02:16 | Ready for Release | Processed in 4 working days. |
| 1135 | CCT CONSTRUCTORS CORPORATION | PROPOSED MITSUBISHI ELECTRIC R... See more | Mt. Leson, San Vicente, Sta. Ana, Cagayan Valley | Rejected | 2025-10-21 17:36:47 | Returned to Applicant | Expired testing Cetificate CRA... See more | |
| 1136 | DOLE_RO2_2025-10-27_517_693C | CMG JR BUILDERS | IMPROVEMENT /EXPANSION OF AT P... See more | PUNTA, APARRI,CAGAYAN | Approved | 2025-10-21 18:35:29 | Ready for Release | Processed in 4 working days. |
| 1137 | CMG JR BUILDERS | CONSTRUCTION OF STREETLIGHTS A... See more | CENTRO-MAURA=DODAN-PADDAYA, APARRI, CAGAYAN | Rejected | 2025-10-21 18:41:43 | Returned to Applicant | SAFETY OFFICER WITH EXISTING P... See more | |
| 1138 | DOLE_RO2_2025-10-27_518_XB19 | E. GUADIZ CONSTRUCTION | improvement of water system at... See more | paruddun norte, aparri, cagayan | Approved | 2025-10-21 18:49:02 | Ready for Release | Processed in 4 working days. |
| 1139 | DOLE_RO2_2025-10-27_519_5JBP | E. GUADIZ CONSTRUCTION | OPENING OF BISAGU LINAO ROAD P... See more | BISAGU, APARRI,, CAGAYAN | Approved | 2025-10-21 18:55:01 | Ready for Release | Processed in 4 working days. |
| 1140 | DOLE_RO2_2025-10-23_512_4UB0 | ALDEC RJ CONSTRUCTION | improvement of material recove... See more | Maura, Aparri,Cagayan | Approved | 2025-10-21 19:10:32 | Ready for Release | Processed in 2 working days. |
| 1141 | DOLE_RO2_2025-10-27_520_FYW1 | ALDEC RJ CONSTRUCTION | CONSTRUCTION OF SANITARY LANDF... See more | BINALAN, APARRI, CAGAYAN | Approved | 2025-10-21 19:17:05 | Ready for Release | Processed in 4 working days. |
| 1142 | DOLE_RO2_2025-10-27_521_84G6 | ALDEC RJ CONSTRUCTION | construction of road with slop... See more | backiling, aparri, cagayan | Approved | 2025-10-21 19:36:48 | Ready for Release | Processed in 4 working days. |
| 1143 | DOLE_RO2_2025-10-27_522_TN65 | ALDEC RJ CONSTRUCTION | CONSTRUCTION OF DRAINAGE CANAL... See more | CENTRO 9, APARRI, CAGAYAN | Approved | 2025-10-21 20:33:20 | Ready for Release | Processed in 4 working days. |
| 1144 | B. Flores Construction and Supply | Construction of College of Hum... See more | Cagayan State University, Carig Campus, Carig Sur, Tuguegarao City, Cagayan | Rejected | 2025-10-22 10:47:38 | Returned to Applicant | UNDER CSHP TEMPLATE SECTION 6.... See more | |
| 1145 | EXI SYTEMS+,Inc. | 65MWp SVESI SAN PABLO SOLAR PO... See more | BRGY. ANNANUMAN, SAN PABLO ISABELA | Rejected | 2025-10-22 11:13:00 | Returned to Applicant | first aider with on going cons... See more | |
| 1146 | DOLE_RO2_2025-10-27_523_4ALT | JHUERS CONSTRUCTION | PB-CW-2025-079 REHABILITATION ... See more | GREGORIO PIMENTEL, DIFFUN, QUIRINO | Approved | 2025-10-22 11:54:31 | Ready for Release | Processed in 3 working days. |
| 1147 | DOLE_RO2_2025-10-27_524_KNHI | JHUERS CONSTRUCTION | PB-CW-2025-075 CONSTRUCTION/ C... See more | NAGABGABAN, AGLIPAY, QUIRINO | Approved | 2025-10-22 13:15:50 | Ready for Release | Processed in 3 working days. |
| 1148 | 5MJ'S CONSTRUCTION | CONSTRUCTION OF MULTI-PURPOSE ... See more | PUSSIAN, ALACALA, CAGAYAN | Rejected | 2025-10-22 14:48:12 | Returned to Applicant | CSHP PROGRAM NOT PROPERLY FILL... See more | |
| 1149 | DOLE_RO2_2025-10-27_525_DQSC | JHUERS CONSTRUCTION | PB-CW-2025-073 CONSTRUCTION/ C... See more | BAGUIO VILLAGE, DIFFUN, QUIRINO | Approved | 2025-10-22 15:34:41 | Ready for Release | Processed in 3 working days. |
| 1150 | DOLE_RO2_2025-10-27_527_LFUR | Dragon twelve builders and construction supply | ITB 11 LOT CONSTRUCTION OF OVE... See more | CABAGAN ISABELA | Approved | 2025-10-23 13:37:09 | Ready for Release | Processed in 3 working days. |
| 1151 | 5MJ'S CONSTRUCTION | CONSTRUCTION OF TERMINAL AT MA... See more | MAURA, APARRI, CAGAYAN | Rejected | 2025-10-23 13:38:47 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 1152 | 5 MJ'S CONSTRUCTION | CONSTRUCTION OF TODA SHED OF M... See more | MAURA, APARRI, CAGAYAN | Rejected | 2025-10-23 13:43:37 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 1153 | Dragon twelve builders and construction supply | ITB 11 LOT CONSTRUCTION OF OVE... See more | CABAGAN ISABELA | Rejected | 2025-10-23 13:46:01 | Returned to Applicant | DOUBLE ENTRY | |
| 1154 | DOLE_RO2_2025-10-29_530_QCUW | Dragon twelve builders and construction supply | ITB 11 LOT 3 IMPROVEMENT OF GO... See more | Calamagui 2nd ilagan city isabela | Approved | 2025-10-23 13:59:23 | Ready for Release | Processed in 4 working days. |
| 1155 | Dragon twelve builders and construction supply | ITB 11 LOT 6 CONSTRUCTION OF M... See more | Brgy BAGUTARI STO TOMAS ISABELA | Rejected | 2025-10-23 14:04:18 | Returned to Applicant | The safety officer and first a... See more | |
| 1156 | Dragon twelve builders and construction supply | ITB 11 LOT 7 CONSTRUCTION OF M... See more | Brgy MALAPAGAY STO TOMAS ISABELA | Rejected | 2025-10-23 14:08:58 | Returned to Applicant | The first aider(Joshua t calat... See more | |
| 1157 | Dragon twelve builders and construction supply | ITB 11 LOT 8 CONSTRUCTION OF M... See more | Brgy BALELLENG STO TOMAS ISABELA | Rejected | 2025-10-23 14:14:28 | Returned to Applicant | both Safety officer and first ... See more | |
| 1158 | 5MJ'S CONSTRUCTION | IMPROVEMENT OF MDRRMO OFFICE A... See more | CENTRO 01, APARRI, CAGAYAN | Rejected | 2025-10-23 14:16:39 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 1159 | 5MJ'S CONSTRUCTION | CONSTRUCTION OF ELEVATOR AT CE... See more | CENTRO 01, APARRI, CAGAYAN | Rejected | 2025-10-23 14:20:08 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 1160 | Dragon twelve builders and construction supply | ITB 11 LOT 9 CONSTRUCTION OF M... See more | BOLINAO STO TOMAS ISABELA | Rejected | 2025-10-23 14:20:29 | Returned to Applicant | Safety officer has ongoing pro... See more | |
| 1161 | DST METAL CRAFT AND ENGINEERING WORKS | Construction of E-Bus Fabricat... See more | Cagayan State University- Carig Campus, Tuguegarao City, Cagayan | Rejected | 2025-10-23 15:25:42 | Returned to Applicant | UNSIGNED CSHP TEMPLATE FOR THE... See more | |
| 1162 | GCPK CONSTRUCTION AND SUPPLY | LOT 47 REPAIR/REHABILITATION O... See more | SAN GUILLERMO | Rejected | 2025-10-23 16:16:00 | Returned to Applicant | Larry Layugan has an ongoing p... See more | |
| 1163 | DOLE_RO2_2025-10-27_526_ELET | JHUERS CONSTRUCTION | PB-CW-2025-072 CONSTRUCTION/ C... See more | LANDINGAN, NAGTIPUNAN, QUIRINO | Approved | 2025-10-23 16:16:31 | Ready for Release | Processed in 2 working days. |
| 1164 | GCPK CONSTRUCTION AND SUPPLY | LOT 49 REAPAIR AND REHABILITAT... See more | ANGADANAN, ISABELA | Rejected | 2025-10-23 16:38:53 | Returned to Applicant | almost complete projects | |
| 1165 | GCPK CONSTRUCTION AND SUPPLY | LOT 63 REPAIR/REHABILITATION O... See more | ECHAGUE, ISABELA | Rejected | 2025-10-24 08:15:04 | Returned to Applicant | Finished Project | |
| 1166 | GCPK CONSTRUCTION AND SUPPLY | REAPAIR AND REHABILITATION OF ... See more | ALICIA, ISABELA | Rejected | 2025-10-24 10:02:22 | Returned to Applicant | Finished project. CSHP templat... See more | |
| 1167 | MASTER Z CONSTRUCTION SERVICES | CONCRETING OF ROAD (P2) | TUKOD, KASIBU, NUEVA VIZCAYA | Rejected | 2025-10-24 10:04:24 | Returned to Applicant | NO attached FAT and SO | |
| 1168 | MASTER Z CONSTRUCTION SERVICES | CONCRETING OF ROAD (P2) | TUKOD, KASIBU, NUEVA VIZCAYA | Rejected | 2025-10-24 10:30:30 | Returned to Applicant | No attached Safety Officer and... See more | |
| 1169 | MASTER Z CONSTRUCTION SERVICES | CONCRETING AND LINING CANAL OF... See more | CAMAMASI, KASIBU, NUEVA VIZCAYA | Rejected | 2025-10-24 11:12:43 | Returned to Applicant | No attached Safety Officer and... See more | |
| 1170 | GOLDEN H8 CONSTRUCTION | Continuation of Gymnasium | Brgy. Nangalinan, Baggao, Cagayan | Rejected | 2025-10-24 12:32:24 | Returned to Applicant | UNDER CSHP TEMPLATE. xvi: ITEM... See more | |
| 1171 | DOLE_RO2_2025-10-29_531_ANKE | GENTEN BUILDERS | REPAIR/REHABILITATION OF GATTA... See more | GATTARAN, CAGAYAN | Approved | 2025-10-24 17:51:24 | Ready for Release | Processed in 3 working days. |
| 1172 | DOLE_RO2_2025-10-29_532_8UTQ | GENTEN BUILDERS | REPAIR/REHABILITATION MEMORIAL... See more | GATTARAN, CAGAYAN | Approved | 2025-10-24 17:59:18 | Ready for Release | Processed in 3 working days. |
| 1173 | DOLE_RO2_2025-10-29_533_OLE3 | JHUERS CONSTRUCTION | PB-CW-2025-077 CONSTRUCTION/ C... See more | ISIDRO PAREDES, DIFFUN, QUIRINO | Approved | 2025-10-27 08:14:13 | Ready for Release | Processed in 3 working days. |
| 1174 | CAMBERWELL CONSTRUCTION AND SUPPLIES | Construction of Lined Canal at... See more | Brgy. Manaoag, Quirino, Isabela | Rejected | 2025-10-27 11:48:14 | Returned to Applicant | Wrong attachment of documents ... See more | |
| 1175 | CAMBERWELL CONSTRUCTION AND SUPPLIES | Construction of Reinforced Con... See more | Sunlife Namnama, Provincial Road, Naguilian, Isabela | Rejected | 2025-10-27 13:24:30 | Returned to Applicant | CSHP template and Application ... See more | |
| 1176 | ERGE CONSULTANTS INCORPORATED | Four-Storey With Mezzanine Can... See more | Saint Paul Hospital, Luna Ext., Ugac Norte, Tuguegarao City, Cagayan | Rejected | 2025-10-27 15:10:42 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 1177 | KNB CONSTRUCTION | Construction of Two (2) Storey... See more | Kaychanarianan, Basco Batanes | Rejected | 2025-10-27 15:59:46 | Returned to Applicant | No attached nc2 for electrical... See more | |
| 1178 | KNB CONSTRUCTION | REPAIR/REHABILITATION OF MAHAT... See more | MAHATAO, BATANES | Rejected | 2025-10-27 16:12:53 | Returned to Applicant | First Aider and safety Officer... See more | |
| 1179 | GOLDEN H8 CONSTRUCTION | Continuation of Gymnasium | Brgy. Nangalinan, Baggao, Cagayan | Rejected | 2025-10-27 16:55:03 | Returned to Applicant | 1. The designated first aider ... See more | |
| 1180 | DOLE_RO2_2025-10-29_534_I4S2 | CCT CONSTRUCTORS CORPORATION | PROPOSED MITSUBISHI ELECTRIC R... See more | Mt. Leson, San Vicente, Sta. Ana, Cagayan Valley | Approved | 2025-10-27 17:08:44 | Ready for Release | Processed in 2 working days. |
| 1181 | DOLE_RO2_2025-10-28_528_IUI1 | FASTBUILT CONSTRUCTION, INC. | CONSTRUCTION OF CANAL AT SAN I... See more | BAGGAO, CAGAYAN | Approved | 2025-10-28 11:39:47 | Ready for Release | Processed in 1 working days. |
| 1182 | DOLE_RO2_2025-10-28_529_TZU2 | FASTBUILT CONSTRUCTION, INC. | CONSTRUCTION OF SAFE AND GENDE... See more | TUNGEL, BAGGAO, CAGAYAN | Approved | 2025-10-28 11:43:53 | Ready for Release | Processed in 1 working days. |
| 1183 | GCPK CONSTRUCTION AND SUPPLY | LOT 47 REAPAIR AND REHABILITAT... See more | SAN GUILLERMO | Rejected | 2025-10-28 12:00:37 | Returned to Applicant | DOUBLE ENTRY | |
| 1184 | B. Flores Construction And Supply | Construction of College of Hum... See more | Cagayan State University, Carig Campus, Carig Sur, Tuguegarao City, Cagayan | Rejected | 2025-10-28 12:39:29 | Returned to Applicant | NO NC II FOR SCAFOLDING | |
| 1185 | GCPK CONSTRUCTION AND SUPPLY | LOT 64 REAPAIR AND REHABILITAT... See more | ALICIA, ISABELA | Rejected | 2025-10-28 13:00:37 | Returned to Applicant | FINISHED PROJECT | |
| 1186 | DOLE_RO2_2025-11-05_538_2LRX | CAMBERWELL CONSTRUCTION AND SUPPLIES | Construction of Reinforced Con... See more | Sunlife Namnama, Provincial Road, Naguilian, Isabela | Approved | 2025-10-28 14:42:39 | Ready for Release | Processed in 6 working days. |
| 1187 | DOLE_RO2_2025-10-29_535_6IHJ | GUALON CONSTRUCTION | ESTBLISHMENT OF LARGE-SCALE IR... See more | BARANGAY LA TORRE SOUTH, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-10-28 14:56:15 | Ready for Release | Processed in 1 working days. |
| 1188 | DOLE_RO2_2025-11-05_539_XASA | CAMBERWELL CONSTRUCTION AND SUPPLIES | Construction of Lined Canal at... See more | Brgy. Manaoag, Quirino, Isabela | Approved | 2025-10-28 15:03:12 | Ready for Release | Processed in 6 working days. |
| 1189 | RCDG CONSTRUCTION CORPORATION | DESIGN AND BUILD FOR THE CONST... See more | Municipal Center, Barangay 2, Enrile, Cagayan | Rejected | 2025-10-29 08:00:56 | Returned to Applicant | UNSIGNED PCAB LICENSE, VERIFY ... See more | |
| 1190 | WERR CORPORATION INTERNATIONAL | DESIGN AND BUILD FOR THE REHAB... See more | Enrile, Cagayan | Rejected | 2025-10-29 08:04:35 | Returned to Applicant | UNDER CSHP TEMPLATE SECTION xv... See more | |
| 1191 | JIRAGA BUILDERS | IMPROVEMENT OF MULTI-PURPOSE B... See more | Municipal Center, Barangay 2, Enrile, Cagayan | Rejected | 2025-10-29 08:11:29 | Returned to Applicant | 1. UNSIGNED LETTER OF INTENT, ... See more | |
| 1192 | GCPK CONSTRUCTION AND SUPPLY | LOT 47 REAPAIR AND REHABILITAT... See more | SAN GUILLERMO | Rejected | 2025-10-29 10:37:42 | Returned to Applicant | FINISHED PROJECT | |
| 1193 | DOLE_RO2_2025-11-05_540_4TKH | KNB CONSTRUCTION | PROCUREMENT OF INFRASTRICTURE ... See more | ANNAFUNAN, TUGUEGARAO CITY CAGAYAN | Approved | 2025-10-29 12:49:19 | Ready for Release | Processed in 5 working days. |
| 1194 | GOLDEN H8 CONSTRUCTION | Continuation of Gymnasium | Brgy. Nangalinan, Baggao, Cagayan | Rejected | 2025-10-29 14:36:59 | Returned to Applicant | ABOUT TO EXPIRED PCAB LICENSE,... See more | |
| 1195 | DST METAL CRAFT AND ENGINEERING WORKS | Construction of E-Bus Fabricat... See more | Cagayan State University- Carig Campus, Tuguegarao City, Cagayan | Rejected | 2025-10-29 16:11:58 | Returned to Applicant | NO ID OF FIRST AIDER ATTACHED ... See more | |
| 1196 | GCPK CONSTRUCTION AND SUPPLY | LOT 44 REAPAIR AND REHABILITAT... See more | BASCP, BATANES | Rejected | 2025-10-30 07:31:04 | Returned to Applicant | Completed Project (Oct 11,2025... See more | |
| 1197 | DOLE_RO2_2025-11-05_541_2RPV | GCPK CONSTRUCTION AND SUPPLY | PROCUREMENT OF INFRASTRUCTURE ... See more | PALLUA TUGUEGARAO CITY - CATAGGAMAN ELEMENTARY SCHOOL | Approved | 2025-10-30 07:35:59 | Ready for Release | Processed in 5 working days. |
| 1198 | DOLE_RO2_2025-11-04_536_GD6J | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-45m, 24sqm, 320kph, 150D k... See more | LASAM CAGAYAN | Approved | 2025-10-30 11:14:38 | Ready for Release | Processed in 3 working days. |
| 1199 | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-45m, 24sqm, 320kph, 150W k... See more | SANCHEZ MIRA CAGAYAN | Rejected | 2025-10-30 15:28:24 | Returned to Applicant | NO COSH CERTIFICATE ATTACHED | |
| 1200 | CMG JR BUILDERS | CONSTRUCTION OF STREETLIGHTS A... See more | CENTRO-MAURA=DODAN-PADDAYA, APARRI, CAGAYAN | Rejected | 2025-10-30 19:04:53 | Returned to Applicant | NO CERTIFICATE OF EMPLOYMENT T... See more | |
| 1201 | DOLE_RO2_2025-11-04_537_B7IM | RJR'S CONSTRUCTION | CONCRETING OF ROAD AT ZONE 3,C... See more | CATUGAY,BAGGAO,CAGAYAN | Approved | 2025-11-03 09:45:50 | Ready for Release | Processed in 1 working days. |
| 1202 | DOLE_RO2_2025-11-05_542_WNZL | WINLEI CONSTRUCTION AND SUPPLY | ESTABLISHMENT OF LARGESCALE IR... See more | SITIP LABBU, BARANGAY PAITAN, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-11-03 13:14:42 | Ready for Release | Processed in 2 working days. |
| 1203 | DOLE_RO2_2025-11-13_549_Q04N | GOLDEN H8 CONSTRUCTION | Continuation of Gymnasium | Brgy. Nangalinan, Baggao, Cagayan | Approved | 2025-11-11 13:28:05 | Ready for Release | Processed in 3 working days. |
| 1204 | DOLE_RO2_2025-11-06_545_J3XW | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-88-25 CONSTRUC... See more | BAGGAO, CAGAYAN | Approved | 2025-11-03 13:46:02 | Ready for Release | Processed in 3 working days. |
| 1205 | DOLE_RO2_2025-11-06_546_DZQA | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-89-25 CONSTRUC... See more | PIAT, CAGAYAN | Approved | 2025-11-03 13:47:56 | Ready for Release | Processed in 3 working days. |
| 1206 | DOLE_RO2_2025-11-05_543_IAAF | Juris Constructio & Builders | Concreting of Barangay Road, P... See more | Purok 3, Mangandingay, Cabarroguis, Quirino | Approved | 2025-11-03 16:18:32 | Ready for Release | Processed in 2 working days. |
| 1207 | DOLE_RO2_2025-11-05_544_GC5L | Juris Construction & Builders | Construction of Fire Truck Gar... See more | BFP Municipal,Cabarroguis, Quirino | Approved | 2025-11-04 09:31:50 | Ready for Release | Processed in 2 working days. |
| 1208 | DOLE_RO2_2025-11-13_550_YT0T | Infra Towers Philippines | PTCGG0018_OWO-2023-001 | Brgy. Penge-Ruyu, Tuguegarao City Cagayan | Approved | 2025-11-11 13:25:16 | Ready for Release | Processed in 3 working days. |
| 1209 | DOLE_RO2_2025-11-06_547_N1EI | Wealthmore Construction and Supply Corporation-WERR Corporation International/JV | CW301/B: Design and Build of ... See more | Carig Norte, Tuguegarao City, Cagayan | Approved | 2025-11-04 16:45:22 | Ready for Release | Processed in 2 working days. |
| 1210 | B. Flores Construction And Supply | Construction of College of Hum... See more | Cagayan State University, Carig Campus, Carig Sur, Tuguegarao City, Cagayan | Rejected | 2025-11-04 17:42:40 | Returned to Applicant | UNDER CSHP TEMPLATE SECTION 6.... See more | |
| 1211 | MASTER Z CONSTRUCTION SERVICES | CONCRETING OF ROAD (P2) | TUKOD, KASIBU, NUEVA VIZCAYA | Rejected | 2025-11-05 09:02:57 | Returned to Applicant | Finished Project | |
| 1212 | MASTER Z CONSTRUCTION SERVICES | CONCRETING AND LINING CANAL OF... See more | CAMAMASI, KASIBU, NUEVA VIZCAYA | Rejected | 2025-11-05 09:05:36 | Returned to Applicant | Finished Project | |
| 1213 | DOLE_RO2_2025-11-06_548_PD2U | CMG JR BUILDERS | CONSTRUCTION OF STREETLIGHTS A... See more | CENTRO-MAURA=DODAN-PADDAYA, APARRI, CAGAYAN | Approved | 2025-11-05 11:48:05 | Ready for Release | Processed in 1 working days. |
| 1214 | A.DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION | PRDP-SU-IB-R002-ISA-002-SAO-00... See more | Barangay Sinsayon-Cabulay Santiago Isabela | Rejected | 2025-11-06 08:22:12 | Returned to Applicant | No date of start at CSHP Appli... See more | |
| 1215 | C.T. LEONCIO CONSTRUCTION AND TRADING | Upgrading Of Pangawan - Banao ... See more | Pangawan-Banao | Rejected | 2025-11-06 09:13:56 | Returned to Applicant | Incomplete attachments | |
| 1216 | DOLE_RO2_2025-11-13_551_4MAP | 7CHIN BUILDERS AND CONSTRUCTION SUPPLY | CME-45m, 24sqm, 320kph, 150W k... See more | SANCHEZ MIRA CAGAYAN | Approved | 2025-11-06 09:20:33 | Ready for Release | Processed in 6 working days. |
| 1217 | KNB CONSTRUCTION | Construction of Two (2) Storey... See more | Kaychanarianan, Basco Batanes | Rejected | 2025-11-06 11:31:22 | Returned to Applicant | The designated First Aider for... See more | |
| 1218 | C.T. LEONCIO CONSTRUCTION AND TRADING | Upgrading Of Pangawan - Banao ... See more | Pangawan-Banao | Rejected | 2025-11-06 11:38:03 | Returned to Applicant | 1. 10 workers - refer to Depar... See more | |
| 1219 | DOLE_RO2_2025-11-13_552_I30E | KNB CONSTRUCTION | REPAIR/REHABILITATION OF MAHAT... See more | MAHATAO, BATANES | Approved | 2025-11-06 11:47:50 | Ready for Release | Processed in 5 working days. |
| 1220 | DOLE_RO2_2025-11-25_584_IQSS | GCPK CONSTRUCTION AND SUPPLY | LOT 44 REPAIR/REHABILITATION O... See more | BASCO, BATANES | Approved | 2025-11-24 13:57:52 | Ready for Release | Processed in 2 working days. |
| 1221 | C.T. LEONCIO CONSTRUCTION AND TRADING | Upgrading Of Pangawan - Banao ... See more | Pangawan-Banao | Rejected | 2025-11-06 17:17:55 | Returned to Applicant | 1. 10 workers - refer to Depar... See more | |
| 1222 | 2025-CW-26: DESIGN AND BUILD OF ANGADANAN GAKIT ARENA | 2025-CW-26: DESIGN AND BUILD O... See more | Rejected | 2025-11-06 18:16:24 | Returned to Applicant | CSHP template is only attached... See more | ||
| 1223 | BGS INFRATECH CONSTRUCTION | IMPROVEMENT OF EXISTING PLUMBI... See more | BATAL SANTIAGO CITY | Rejected | 2025-11-07 09:00:47 | Returned to Applicant | 1. No PCAB license; 2. No Regi... See more | |
| 1224 | TJMT CONSTRUCTION | Concreting of Road (Phase IV) ... See more | Gattaran Cagayan | Rejected | 2025-11-07 10:25:18 | Returned to Applicant | The designated First Aider(Den... See more | |
| 1225 | DOLE_RO2_2025-11-13_553_MM7V | TJMT CONSTRUCTION | Concreting of Farm to Market R... See more | Gattaran Cagayan | Approved | 2025-11-07 10:41:47 | Ready for Release | Processed in 4 working days. |
| 1226 | TJMT CONSTRUCTION | Concreting of Road with Slope ... See more | Piña Weste Gattaran Cagayan | Rejected | 2025-11-07 10:48:38 | Returned to Applicant | The designated Safety Officer ... See more | |
| 1227 | A.DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION | PRDP-SU-IB-R002-ISA-002-SAO-00... See more | Barangay Sinsayon-Cabulay Santiago Isabela | Rejected | 2025-11-07 13:18:39 | Returned to Applicant | Double entry | |
| 1228 | A.DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION | PRDP-SU-IB-R002-ISA-002-SAO-00... See more | Barangay Sinsayon-Cabulay Santiago Isabela | Rejected | 2025-11-07 14:47:13 | Returned to Applicant | Double entry | |
| 1229 | MOTORALI CORPORATION | INTERIOR FINISHING IMPROVEMENT | SAN FERMIN, CAUAYAN CITY, ISABELA. | Rejected | 2025-11-07 15:45:50 | Returned to Applicant | Registration of Establishment ... See more | |
| 1230 | A.DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION | PRDP-SU-IB-R002-ISA-002-SAO-00... See more | Barangay Sinsayon-Cabulay Santiago Isabela | Rejected | 2025-11-07 15:57:50 | Returned to Applicant | the Testing Certificate for th... See more | |
| 1231 | MOTORALI CORPORATION | INTERIOR FINISHING IMPROVEMENT | SAN FERMIN, CAUAYAN CITY, ISABELA. | Rejected | 2025-11-07 16:21:31 | Returned to Applicant | Not duly filled out applicatio... See more | |
| 1232 | DEKM CONSTRUCTIO | construction of boundary arch ... See more | iringan allacapan,cagayan | Rejected | 2025-11-10 15:52:48 | Returned to Applicant | the designated Safety Officer ... See more | |
| 1233 | DOLE_RO2_2025-11-13_554_W6LD | CREST92 Construction & Development Corporation | Concreting of Road along Cemet... See more | Dadda, Tuguegarao City, Cagayan | Approved | 2025-11-11 09:21:50 | Ready for Release | Processed in 3 working days. |
| 1234 | DOLE_RO2_2025-11-13_555_60KR | CREST92 Construction & Development Corporation | Concreting of Road along San J... See more | Atulayan Sur, Tuguegarao City, Cagayan | Approved | 2025-11-11 09:36:19 | Ready for Release | Processed in 3 working days. |
| 1235 | 5MJ'S CONSTRUCTION | CONSTRUCTION OF MULTI-PURPOSE ... See more | PUSSIAN, ALACALA, CAGAYAN | Rejected | 2025-11-11 09:37:22 | Returned to Applicant | a. No (PCAB) Certificate was s... See more | |
| 1236 | D.A. CADELIÑA CONSTRUCTION | PHILRICE ISA PB INFRA 2025-02 ... See more | DA-PHILRICE ISABELA BRANCH STATION, MALASIN, SAN MATEO, ISABELA | Rejected | 2025-11-12 01:33:03 | Returned to Applicant | Attached the only application ... See more | |
| 1237 | D.A. CADELIÑA CONSTRUCTION | PHILRICE ISA PB INFRA 2025-02 ... See more | DA-PHILRICE ISABELA BRANCH STATION, MALASIN, SAN MATEO, ISABELA | Rejected | 2025-11-12 01:36:33 | Returned to Applicant | For 10 and above workers, subm... See more | |
| 1238 | D.A. CADELIÑA CONSTRUCTION | PHILRICE ISA PB INFRA 2025-02 ... See more | DA-PHILRICE ISABELA BRANCH STATION, MALASIN, SAN MATEO, ISABELA | Rejected | 2025-11-12 01:37:26 | Returned to Applicant | No attachment. Please reapply | |
| 1239 | D.A. CADELIÑA CONSTRUCTION | PHILRICE ISA PB INFRA 2025-02 ... See more | DA-PHILRICE ISABELA BRANCH STATION, MALASIN, SAN MATEO, ISABELA | Rejected | 2025-11-12 08:18:41 | Returned to Applicant | For 10 and above workers, plea... See more | |
| 1240 | DOLE_RO2_2025-11-18_558_DICV | EXI SYTEMS+,Inc. | 65MWp SVESI SAN PABLO SOLAR PO... See more | BRGY. ANNANUMAN, SAN PABLO ISABELA | Approved | 2025-11-12 10:50:11 | Ready for Release | Processed in 5 working days. |
| 1241 | MILESTONE 888 CONSTRUCTION INC. | Construction of Bridge going t... See more | San Miguel, Baggao, Cagayan | Rejected | 2025-11-12 11:14:56 | Returned to Applicant | No testing Certificate -Water ... See more | |
| 1242 | D.A. CADELIÑA CONSTRUCTION | PHILRICE ISA PB INFRA 2025-02 ... See more | DA-PHILRICE ISABELA BRANCH STATION, MALASIN, SAN MATEO, ISABELA | Rejected | 2025-11-12 21:11:34 | Returned to Applicant | Safety officer and first aider... See more | |
| 1243 | DOLE_RO2_2025-11-14_556_39AH | A.DE GUIA CONSTRUCTION AND DEVELOPMENT CORPORATION | PRDP-SU-IB-R002-ISA-002-SAO-00... See more | Barangay Sinsayon-Cabulay Santiago Isabela | Approved | 2025-11-13 09:26:13 | Ready for Release | Processed in 2 working days. |
| 1244 | DOLE_RO2_2025-11-17_557_FORI | FRG CONSTRUCTION | CONSTRUCTION OF BALETE CIS | BALETE, STA. FE, NUEVA VIZCAYA | Approved | 2025-11-13 16:01:10 | Ready for Release | Processed in 2 working days. |
| 1245 | DOLE_RO2_2025-11-18_559_KIY8 | Q.C.D. CONSTRUCTION & SUPPLY | IMPROVEMENT OF TWO (2) UNITS- ... See more | VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-11-13 16:06:07 | Ready for Release | Processed in 3 working days. |
| 1246 | DOLE_RO2_2025-11-18_560_7BMH | Q.C.D. CONSTRUCTION & SUPPLY | ESTABLISHMENT & IMPROVEMEN... See more | VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-11-13 16:11:06 | Ready for Release | Processed in 3 working days. |
| 1247 | YPAN ELECTRIC POWER DISTRIBUTION SERVICES | ELECTRICAL SYSTEM UPGRADE (OVE... See more | DIFFUN QUIRINO | Rejected | 2025-11-14 10:18:10 | Returned to Applicant | a. The Testing Certificate for... See more | |
| 1248 | WBS Construction and Construction Supply | IMPROVEMENT OF PEO WAREHOUSE C... See more | TUGUEGARAO CITY, CAGAYAN | Rejected | 2025-11-14 10:31:45 | Returned to Applicant | Please reapply to the DOLE Cag... See more | |
| 1249 | WBS Construction and Construction Supply | IMPROVEMENT OF CAPITOL GROUNDS... See more | CAPITOL COMPOUND, TUGUEGARAO CITY, CAGAYAN | Rejected | 2025-11-14 11:00:46 | Returned to Applicant | Please reapply to DOLE Cagayan... See more | |
| 1250 | DOLE_RO2_2025-11-18_561_EVB2 | DEKM CONSTRUCTION | construction of boundary arch ... See more | iringan allacapan,cagayan | Approved | 2025-11-14 11:05:03 | Ready for Release | Processed in 3 working days. |
| 1251 | DOLE_RO2_2025-11-18_562_S8V9 | DECA CONSTRUCTION | CONSTRUCTION OF TUCALANA ACTIO... See more | TUCALANA, LALLO, CAGAYAN | Approved | 2025-11-14 11:16:24 | Ready for Release | Processed in 3 working days. |
| 1252 | DOLE_RO2_2025-11-18_563_VCP0 | FBS Engineering & Construction | Rehabilitation of Farm to Mark... See more | Annayatan, Baggao, Cagayan | Approved | 2025-11-14 15:54:17 | Ready for Release | Processed in 2 working days. |
| 1253 | WBS Construction and Construction Supply | IMPROVEMENT OF ROADS - 2ND DIS... See more | SAN ISIDRO BANGAN, SANCHEZ MIRA, CAGAYAN | Rejected | 2025-11-14 16:52:51 | Returned to Applicant | Please reapply to DOLE Cagayan... See more | |
| 1254 | DOLE_RO2_2025-11-18_564_TTJK | FBS Engineering & Construction | Construction of 1 unit Box Cul... See more | Asassi, Baggao, Cagayan | Approved | 2025-11-15 14:52:06 | Ready for Release | Processed in 2 working days. |
| 1255 | MOTORALI CORPORATION | INTERIOR FINISHING IMPROVEMENT | NATIONAL HIGHWAY, SAN FERMIN, CAUAYAN CITY, ISABELA. | Rejected | 2025-11-17 10:58:25 | Returned to Applicant | incomplete documentary require... See more | |
| 1256 | B. Flores Construction And Supply | Construction of College of Hum... See more | Cagayan State University, Carig Campus, Carig Sur, Tuguegarao City, Cagayan | Rejected | 2025-11-17 11:06:09 | Returned to Applicant | NO ATTACHED DOLE CERTIFICATE O... See more | |
| 1257 | VVIG CONSTRUCTION SERVICES | Construction of Masonry Draina... See more | DANAO STREET, ATULAYAN NORTE, TUGUEGARAO CITY | Rejected | 2025-11-17 11:14:03 | Returned to Applicant | NO ATTACHED CERTIFICATE FOR TH... See more | |
| 1258 | DOLE_RO2_2025-11-18_565_AHIO | FULRUBELL CORPORATION | FTAP ROLLOUT PROJECT / GAPASIM... See more | Rogus, Cauayan, Isabela | Approved | 2025-11-17 11:32:49 | Ready for Release | Processed in 2 working days. |
| 1259 | VALLEY CONSTRUCTION AND GENERAL MERCHANDISE | CONSTRUCTION OF RCPC DRAINAGE ... See more | CAGURANGAN ST. AND MACABBABAD ST., LINAO EAST, TUGUEGARAO CITY | Rejected | 2025-11-17 11:59:07 | Returned to Applicant | FINISHED/COMPLETED PROJECT | |
| 1260 | VALLEY CONSTRUCTION AND GENERAL MERCHANDISE | CONSTRUCTION OF RCPC DRAINAGE ... See more | TAGUINOD STREET, ANNAFUNAN SECTION, TUGUEGARAO CITY | Rejected | 2025-11-17 12:12:52 | Returned to Applicant | FINISHED/COMPLETED PROJECT | |
| 1261 | DOLE_RO2_2025-11-18_566_NU1G | WBS Construction and Construction Supply | IMPROVEMENT OF ROADS - 2ND DIS... See more | SAN ISIDRO BANGAN, SANCHEZ MIRA, CAGAYAN | Approved | 2025-11-17 14:39:09 | Ready for Release | Processed in 2 working days. |
| 1262 | DOLE_RO2_2025-11-18_567_DOG3 | K URBINA CONSTRUCTION | IMPROVEMENT OF ROAD NEAR STA A... See more | GATTARAN, CAGAYAN | Approved | 2025-11-17 14:41:29 | Ready for Release | Processed in 2 working days. |
| 1263 | WBS Construction and Construction Supply | IMPROVEMENT OF PEO WAREHOUSE C... See more | CAPITOL COMPOUND, TUGUEGARAO CITY, CAGAYAN | Rejected | 2025-11-17 14:42:37 | Returned to Applicant | NOT PROPERLY SCANNES SOME DETA... See more | |
| 1264 | WBS Construction and Construction Supply | IMPROVEMENT OF CAPITOL GROUNDS... See more | TUGUEGARAO CITY, CAGAYAN | Rejected | 2025-11-17 14:49:24 | Returned to Applicant | NOT PROPERLY SCANNES SOME DETA... See more | |
| 1265 | DOLE_RO2_2025-11-18_568_8WHL | K URBINA CONSTRUCTION | IMPROVEMENT OG FOOD AND LEISUR... See more | CENTRO SUR, GATTARAN, CAGAYAN | Approved | 2025-11-17 14:49:48 | Ready for Release | Processed in 2 working days. |
| 1266 | POWERCHINA PHILIPPINES CORP. | 70MWac Linglingay Solar Power ... See more | Linglingay, Gamu Isabela | Rejected | 2025-11-17 16:55:16 | Returned to Applicant | No attached document | |
| 1267 | DOLE_RO2_2025-11-18_569_INV8 | VVIG CONSTRUCTION SERVICES | CONSTRUCTION OF MASONRY DRAINA... See more | F. DANAO ST., ATULAYAN NORTE, TUGUEGARAO CITY | Approved | 2025-11-17 17:40:34 | Ready for Release | Processed in 1 working days. |
| 1268 | DOLE_RO2_2025-11-19_575_AH3B | D.A. CADELIÑA CONSTRUCTION | PHILRICE ISA PB INFRA 2025-02 ... See more | DA-PHILRICE ISABELA BRANCH STATION, MALASIN, SAN MATEO, ISABELA | Approved | 2025-11-17 21:21:32 | Ready for Release | Processed in 2 working days. |
| 1269 | DOLE_RO2_2025-11-18_570_LUO5 | B. Flores Construction And Supply | Construction of College of Hum... See more | Cagayan State University, Carig Campus, Carig Sur, Tuguegarao City, Cagayan | Approved | 2025-11-18 08:02:52 | Ready for Release | Processed in 1 working days. |
| 1270 | NEW C.C. BARCELONA CONSTRUCTION CORPORATION | DESIGN AND BUILD OF FOUR (4) S... See more | BRGY. MAGSAYSAY, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-11-18 08:22:42 | Returned to Applicant | 1. Kindly fill up the portion ... See more | |
| 1271 | DOLE_RO2_2025-11-19_576_QB2K | INIFINITI CONSTRUCTION AND DEVELOPMENT CORPORATION | 2025-CW-26: DESIGN AND BUILD O... See more | CENTRO 3, ANGADANAN, ISABELA | Approved | 2025-11-18 08:39:48 | Ready for Release | Processed in 2 working days. |
| 1272 | DOLE_RO2_2025-11-25_585_CLJJ | NETSOLAR INC. | Insular Life | 2/F Insular Life Building, Maharlika Highway, Villasis, Santiago City, Isabela, Philippines | Approved | 2025-11-18 10:18:08 | Ready for Release | Processed in 6 working days. |
| 1273 | DOLE_RO2_2025-11-19_571_VEZP | GENTEN BUILDERS | MASONRY DRAINAGE STRUCTURE (LI... See more | PALLUA SUR, TUGUEGARAO CITY | Approved | 2025-11-18 12:28:59 | Ready for Release | Processed in 1 working days. |
| 1274 | DOLE_RO2_2025-11-19_572_31CN | GENTEN BUILDERS | CONDTRUCTION OF MULTI-PURPOSE ... See more | BUNTUN, TUGUEGARAO CITY | Approved | 2025-11-18 13:25:09 | Ready for Release | Processed in 1 working days. |
| 1275 | DOLE_RO2_2025-11-19_573_HLRG | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-90-25 CONSTRUC... See more | PEÑABLANCA, CAGAYAN | Approved | 2025-11-18 13:25:26 | Ready for Release | Processed in 1 working days. |
| 1276 | DOLE_RO2_2025-11-19_574_GOXF | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-91-25 CONCRETI... See more | PEÑABLANCA, CAGAYAN | Approved | 2025-11-18 13:48:11 | Ready for Release | Processed in 1 working days. |
| 1277 | DOLE_RO2_2025-11-19_577_XWYS | EDWIN ERWIN SISON CONSTRUCTION | CONSTRUCTION OF ADDITIONAL COM... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-11-18 17:53:49 | Ready for Release | Processed in 1 working days. |
| 1278 | DOLE_RO2_2025-11-19_578_NC8B | CAB CONSTRUCTION AND SUPPLY | REHABILITATION/IMPROVEMENT OF ... See more | BAYOMBONG & AMBAGUIO, NUEVA VIZCAYA | Approved | 2025-11-18 17:57:49 | Ready for Release | Processed in 1 working days. |
| 1279 | CAB CONSTRUCTION AND SUPPLY | RHABILITATION/IMPROVEMENT OF B... See more | ARITAO, NUEVA VIZCAYA | Rejected | 2025-11-18 18:01:17 | Returned to Applicant | Safety Officer and First Aider... See more | |
| 1280 | POWERCHINA PHILIPPINES CORP. | 70MWac Linglingay Solar Power ... See more | Linglingay, Gamu Isabela | Rejected | 2025-11-19 07:50:41 | Returned to Applicant | INCOMPLETE DOCUMENTARY REQUIRE... See more | |
| 1281 | DOLE_RO2_2025-11-25_586_CKB3 | CSD ENGINEERING AND CONSTRUCTION | Construction of NIA Batanes Of... See more | Basco, Batanes | Approved | 2025-11-19 09:31:08 | Ready for Release | Processed in 5 working days. |
| 1282 | NEW C.C. BARCELONA CONSTRUCTION CORPORATION | DESIGN AND BUILD OF FOUR (4) S... See more | BRGY. MAGSAYSAY, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-11-19 13:33:25 | Returned to Applicant | CSHP template not properly fil... See more | |
| 1283 | DST METAL CRAFT AND ENGINEERING WORKS | Construction of E-Bus Fabricat... See more | Cagayan State University- Carig Campus, Tuguegarao City, Cagayan | Rejected | 2025-11-19 14:43:09 | Returned to Applicant | not properly filled out form | |
| 1284 | POWERCHINA PHILIPPINES CORP. | 70MWac Linglingay Solar Power ... See more | Linglingay, Gamu Isabela | Rejected | 2025-11-19 14:59:50 | Returned to Applicant | CSHP TEMPLATE NOT DULY FILLED ... See more | |
| 1285 | DOLE_RO2_2025-11-21_579_CC1J | CSD ENGINEERING AND CONSTRUCTION | Construction of NIA Batanes Of... See more | Basco, Batanes | Approved | 2025-11-19 15:21:18 | Ready for Release | Processed in 2 working days. |
| 1286 | Whiteport, Inc. | North Gateway Business Park | Enrile Avenue, Carig Sur, Tuguegarao City, Cagayan | Rejected | 2025-11-19 16:27:59 | Returned to Applicant | NOT USE DOLE CSHP TEMPLATE | |
| 1287 | DOLE_RO2_2025-11-25_587_KYU5 | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | REPAIR / REHABILITATION OF DIP... See more | NAGTIPUNAN, QUIRINO | Approved | 2025-11-21 09:19:38 | Ready for Release | Processed in 3 working days. |
| 1288 | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | REPAIR / REHABILITATION OF DIP... See more | NAGTIPUNAN, QUIRINO | Rejected | 2025-11-21 09:19:56 | Returned to Applicant | Double Entry | |
| 1289 | DOLE_RO2_2025-11-25_588_3C2Y | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | REPAIR / REHABILITATION OF BAN... See more | DIFFUN, QUIRINO | Approved | 2025-11-21 10:05:46 | Ready for Release | Processed in 3 working days. |
| 1290 | DOLE_RO2_2025-11-25_589_RTVX | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | REPAIR / REHABILITATION OF PON... See more | NAGTIPUNAN, QUIRINO | Approved | 2025-11-21 10:38:24 | Ready for Release | Processed in 3 working days. |
| 1291 | ST. PAUL HOSPITAL OF TUGUEGARAO, INC. | Cancer Center Building-Additio... See more | Luna Ext., Ugac Norte, Tuguegarao City, Cagayan | Rejected | 2025-11-21 11:25:41 | Returned to Applicant | SIMPLIFIED-APPLY IN THE OFFICE | |
| 1292 | DOLE_RO2_2025-11-25_590_LLG9 | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | REPAIR/REHABILITATION OF VILLA... See more | DIFFUN, QUIRINO | Approved | 2025-11-21 13:48:25 | Ready for Release | Processed in 3 working days. |
| 1293 | DOLE_RO2_2025-11-25_591_8LUC | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | REPAIR/REHABILITATION OF DON F... See more | DIFFUN, QUIRINO | Approved | 2025-11-21 13:53:48 | Ready for Release | Processed in 3 working days. |
| 1294 | DOLE_RO2_2025-11-24_580_GLW6 | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | REPAIR/REHABILITATION OF KASIB... See more | KASIBU, NUEVA VIZCAYA | Approved | 2025-11-21 14:03:51 | Ready for Release | Processed in 1 working days. |
| 1295 | DOLE_RO2_2025-11-25_592_NCMH | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | REPAIR/REHABILITATION OF DIADI... See more | DIADI, NUEVA VIZCAYA | Approved | 2025-11-21 14:07:31 | Ready for Release | Processed in 3 working days. |
| 1296 | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | REPAIR/REHABILITATION OF INDIA... See more | BAMBANG, NUEVA VIZCAYA | Rejected | 2025-11-21 14:14:18 | Returned to Applicant | JOHN PAUL D. DELA CRUZ with ex... See more | |
| 1297 | DOLE_RO2_2025-11-25_593_6A3R | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | REPAIR/ REHABILITATION OF AURO... See more | DIFFUN, QUIRINO | Approved | 2025-11-21 14:18:57 | Ready for Release | Processed in 3 working days. |
| 1298 | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | REPAIR/REHABILITATION OF KONGK... See more | KASIBU, NUEVA VIZCAYA | Rejected | 2025-11-21 14:21:41 | Returned to Applicant | AMOUNT OF PROJECT IN THE APPLI... See more | |
| 1299 | KNB CONSTRUCTION | Construction of two(2) Storey ... See more | KAYCHANARIANAN BASCO BATANES | Rejected | 2025-11-21 14:24:41 | Returned to Applicant | F.A EXPIRED | |
| 1300 | J.A.M. Industrial Sales | Installation of SFO Tank | 327 Prenza Highway, Cauayan City, Isabela | Rejected | 2025-11-21 16:10:39 | Returned to Applicant | No heavy equipment testing for... See more | |
| 1301 | DOLE_RO2_2025-11-24_582_APX9 | CAB CONSTRUCTION AND SUPPLY | REHABILITATION/IMPROVEMENT OF ... See more | ARITAO, NUEVA VIZCAYA | Approved | 2025-11-23 16:08:08 | Ready for Release | Processed in 0 working days. |
| 1302 | DOLE_RO2_2025-11-25_594_5Q9S | NORTHERN COMMUNICATION INC. | IMPROVEMENT OF CORDON TO ATAN ... See more | BRGY. CORDON, KASIBU, NUEVA VIZCAYA | Approved | 2025-11-23 16:13:11 | Ready for Release | Processed in 1 working days. |
| 1303 | DOLE_RO2_2025-11-25_595_CK6K | NORTHERN COMMUNICATION INC. | IMPROVEMENT OF LUPA-MANUA AT L... See more | BRGY. LUPA, KASIBU, NUEVA VIZCAYA | Approved | 2025-11-23 16:17:37 | Ready for Release | Processed in 1 working days. |
| 1304 | NORTHERN COMMUNICATION INC. | CONSTRUCTION OF COVERED COURT | BRGY. ALIMIT, KASIBU, NUEVA VIZCAYA | Rejected | 2025-11-23 16:22:40 | Returned to Applicant | designated First Aider is also... See more | |
| 1305 | DOLE_RO2_2025-11-24_581_PY01 | NEW C.C. BARCELONA CONSTRUCTION CORPORATION | DESIGN AND BUILD OF FOUR (4) S... See more | BRGY. MAGSAYSAY, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-11-24 09:41:38 | Ready for Release | Processed in 1 working days. |
| 1306 | LCPJ CONSTRUCTION | PROPOSED ONE-STOREY COMMERCIA... See more | Brgy. 3, San Jose, Enrile, Cagayan. | Rejected | 2025-11-24 11:33:00 | Returned to Applicant | NO NC II FOR ELECTRICIAN | |
| 1307 | DOLE_RO2_2025-11-25_596_ALPZ | MACST CONSTRUCTION AND SUPPLY | clearing of fmr and irrigation... See more | Antutot, Kasibu, Nueva Vizcaya | Approved | 2025-11-24 11:49:31 | Ready for Release | Processed in 2 working days. |
| 1308 | MACST CONSTRUCTION AND SUPPLY | IMPROVEMENT OF KONGKONG-LOGPON... See more | LOGPOND, KONGKONG, KASIBU, NUEVA VIZCAYA | Rejected | 2025-11-24 11:54:08 | Returned to Applicant | Asuncion C. Galvez - with on-g... See more | |
| 1309 | MACST CONSTRUCTION AND SUPPLY | RIPRAPPING OF SURONG FMR, CAMP... See more | Antutot, Kasibu, Nueva Vizcaya | Rejected | 2025-11-24 12:06:35 | Returned to Applicant | MARY LOUISE R. GUZMAN with exi... See more | |
| 1310 | DOLE_RO2_2025-11-24_583_XCM4 | LCPJ CONSTRUCTION | PROPOSED ONE-STOREY COMMERCIA... See more | Brgy. 3, San Jose, Enrile, Cagayan. | Approved | 2025-11-24 12:38:51 | Ready for Release | Processed in 1 working days. |
| 1311 | JAN PAOLA CONSTRUCTION INC. | REHABILITATION AND IMPROVEMENT... See more | LALOG 1, Luna, Isabela | Rejected | 2025-11-24 17:03:12 | Returned to Applicant | NCII ROAD ROLLER BLURRED FILE.... See more | |
| 1312 | POWERCHINA PHILIPPINES CORP. | 70MWac Linglingay Solar Power ... See more | Linglingay, Gamu Isabela | Rejected | 2025-11-25 11:08:02 | Returned to Applicant | 1. The testing organization fo... See more | |
| 1313 | DOLE_RO2_2025-11-25_597_18G1 | 11-16 CONSTRUCTION | NCB-INFRA-ISA127R-25-EPIP ISAB... See more | PROVINCE OF ISABELA | Approved | 2025-11-25 11:08:22 | Ready for Release | Processed in 1 working days. |
| 1314 | DOLE_RO2_2025-11-25_598_LE14 | ASC CONSTRUCTION & CONCRETE PRODUCTS | NCB-INFRA-ISA128-25-RPNIS-MRIS... See more | MALLIG, ISABELA | Approved | 2025-11-25 11:28:40 | Ready for Release | Processed in 1 working days. |
| 1315 | DOLE_RO2_2025-11-25_599_SGFN | J.A.M. Industrial Sales | Installation of SFO Tank | 327 Prenza Highway, Cauayan City, Isabela | Approved | 2025-11-25 13:39:04 | Ready for Release | Processed in 1 working days. |
| 1316 | DOLE_RO2_2025-11-25_600_KE6V | ASC CONSTRUCTION & CONCRETE PRODUCTS | 2025-MARIIS-DRD-COB-IGF-INFRA-... See more | RAMON, ISABELA | Approved | 2025-11-25 13:59:35 | Ready for Release | Processed in 1 working days. |
| 1317 | DOLE_RO2_2025-11-27_601_GU8N | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | REPAIR/REHABILITATION OF INDIA... See more | BAMBANG, NUEVA VIZCAYA | Approved | 2025-11-25 15:24:36 | Ready for Release | Processed in 2 working days. |
| 1318 | DOLE_RO2_2025-11-27_602_2EKP | IA CASTAÑEDA CONSTRUCTION AND SUPPLY | REPAIR/REHABILITATION OF KONGK... See more | KASIBU, NUEVA VIZCAYA | Approved | 2025-11-26 10:00:26 | Ready for Release | Processed in 2 working days. |
| 1319 | DOLE_RO2_2025-12-02_605_NSGX | OUA CONSTRUCTION | CONSTRUCTION/CONCRETING OF ROA... See more | SAN MIGUEL, LUNA, ISABELA | Approved | 2025-11-26 12:20:27 | Ready for Release | Processed in 4 working days. |
| 1320 | DPLUS SIGN ADVERTISING CORPORATION | EXL BUILDING SIGNAGE | 12 FLR TWO ECOM HARBOR DRIVE PASAY | Rejected | 2025-11-26 13:18:40 | Returned to Applicant | Only Safety Officer uploaded.... See more | |
| 1321 | DPLUS SIGN ADVERTISING CORPORATION | EXL BUILDING SIGNAGE | 8 FLR TOWER ONE SM NORTH EDSA QUEZON CITY | Rejected | 2025-11-26 13:22:16 | Returned to Applicant | Only Safety Officer uploaded.... See more | |
| 1322 | DOLE_RO2_2025-11-27_603_JBC0 | CJTPASCUAL CONSTRUCTION | Construction of Sanitary Landf... See more | Minanga Norte, Lasam, Cagayan | Approved | 2025-11-26 13:35:45 | Ready for Release | Processed in 1 working days. |
| 1323 | DECA CONSTRUCTION | Development of Lasam Town Hall... See more | Centro 02, Lasam,Cagayan | Rejected | 2025-11-26 13:57:49 | Returned to Applicant | NO TESTING CERTS OF HEAVY EQUI... See more | |
| 1324 | AGT BUILDERS & CONSTRUCTION SUPPLY | STREET LIGHTING PROJECT ALONG ... See more | NATIONAL HIGHWAY-BARANGAY SAN MIGUEL, MAMBABANGA AND HARANA, LUNA, ISABELA | Rejected | 2025-11-26 15:07:57 | Returned to Applicant | cshp application-no signature ... See more | |
| 1325 | ISERVE CUSTOMER MANAGEMENT SOLUTIONS (ISERVE) INC. | PROPOSED ONE STOREY COMMERCIAL... See more | BRGY. TAGARAN, CUAYAN, ISABELA | Rejected | 2025-11-26 15:47:23 | Returned to Applicant | RE-SUBMISSION NEEDED. INCOMPLE... See more | |
| 1326 | ISERVE CUSTOMER MANAGEMENT SOLUTIONS (ISERVE) INC. | PROPOSED ONE STOREY COMMERCIAL... See more | BRGY. TAGARAN, CUAYAN, ISABELA | Rejected | 2025-11-26 15:48:03 | Returned to Applicant | RE-SUBMISSION NEEDED. INCOMPLE... See more | |
| 1327 | MACST CONSTRUCTION AND SUPPLY | RIPRAPPING OF SURONG FMR, CAMP... See more | Antutot, Kasibu, Nueva Vizcaya | Rejected | 2025-11-26 15:49:28 | Returned to Applicant | HENRY JAMES L. REAL - First Ai... See more | |
| 1328 | DOLE_RO2_2025-11-27_604_J7D1 | MACST CONSTRUCTION AND SUPPLY | IMPROVEMENT OF KONGKONG-LOGPON... See more | LOGPOND, KONGKONG, KASIBU, NUEVA VIZCAYA | Approved | 2025-11-26 15:52:50 | Ready for Release | Processed in 1 working days. |
| 1329 | THREE-BAY CARWASH STATION | PROPOSED THREE-BAY CARWASH STA... See more | QUEZON STREET, CAUAYAN CITY, ISABELA | Rejected | 2025-11-26 16:51:15 | Returned to Applicant | NO NEED TO UPLOAD ONLINE IF BY... See more | |
| 1330 | THREE-BAY CARWASH STATION | PROPOSED THREE-BAY CARWASH STA... See more | QUEZON STREET, CAUAYAN CITY, ISABELA | Rejected | 2025-11-27 08:12:45 | Returned to Applicant | double entry-by admin | |
| 1331 | DOLE_RO2_2025-12-02_606_21UA | KNB CONSTRUCTION | Construction of two(2) Storey ... See more | KAYCHANARIANAN BASCO BATANES | Approved | 2025-11-27 09:40:35 | Ready for Release | Processed in 4 working days. |
| 1332 | BGS INFRATECH CONSTRUCTION | IMPROVEMENT OF EXISTING PLUMBI... See more | BATAL SANTIAGO CITY | Rejected | 2025-11-27 12:47:28 | Returned to Applicant | RE-SUBMISSION NEEDED. INCOMPLE... See more | |
| 1333 | BGS INFRATECH CONSTRUCTION | IMPROVEMENT OF EXISTING PLUMBI... See more | BATAL SANTIAGO CITY | Rejected | 2025-11-27 12:55:35 | Returned to Applicant | DOUBLE ENTRY | |
| 1334 | BGS INFRATECH CONSTRUCTION | IMPROVEMENT OF EXISTING PLUMBI... See more | BATAL SANTIAGO CITY | Rejected | 2025-11-27 16:33:15 | Returned to Applicant | cshp application- no signature... See more | |
| 1335 | DOLE_RO2_2025-12-02_607_LSKQ | NORTHERN COMMUNICATION INC. | CONSTRUCTION OF COVERED COURT | BRGY. ALIMIT, KASIBU, NUEVA VIZCAYA | Approved | 2025-11-27 17:02:28 | Ready for Release | Processed in 3 working days. |
| 1336 | AGT BUILDERS & CONSTRUCTION SUPPLY | STREET LIGHTING PROJECT ALONG ... See more | NATIONAL HIGHWAY-BARANGAY SAN MIGUEL, MAMBABANGA AND HARANA, LUNA, ISABELA | Rejected | 2025-11-28 08:45:45 | Returned to Applicant | Certificate of safety officer ... See more | |
| 1337 | DOLE_RO2_2025-12-02_608_KFPE | BGS INFRATECH CONSTRUCTION | IMPROVEMENT OF EXISTING PLUMBI... See more | BATAL SANTIAGO CITY | Approved | 2025-11-28 09:04:58 | Ready for Release | Processed in 3 working days. |
| 1338 | J3P CONSTRUCTION AND DEVELOPER CORPORATION | Installation of Street Roadway... See more | Ramon, Isabela | Rejected | 2025-11-28 16:23:47 | Returned to Applicant | -Application form not duly acc... See more | |
| 1339 | J3P CONSTRUCTION AND DEVELOPER CORPORATION | Upgrading of Local Access Road... See more | Ramon, Isabela | Rejected | 2025-11-28 16:33:04 | Returned to Applicant | 1. CSHP template not duly fill... See more | |
| 1340 | DOLE_RO2_2025-12-02_609_RLM1 | MACST CONSTRUCTION AND SUPPLY | RIPRAPPING OF SURONG FMR, CAMP... See more | Antutot, Kasibu, Nueva Vizcaya | Approved | 2025-12-01 12:01:21 | Ready for Release | Processed in 1 working days. |
| 1341 | WBS Construction and Construction Supply | CSHP- Improvement of Capitol G... See more | Tuguegarao City | Rejected | 2025-12-01 14:47:26 | Returned to Applicant | NO TOOLBOX FORM/DOCUMENTS ATTA... See more | |
| 1342 | WBS Construction and Construction Supply | Impovement of PEO Warehouse Ca... See more | Tuguegarao City | Rejected | 2025-12-01 15:26:42 | Returned to Applicant | NO TOOLBOX MEETING FORM/DOCUME... See more | |
| 1343 | WBS Construction and Construction Supply | Improvement of Roads-2nd Distr... See more | San Isidro Bangan, Sanchez Mira, Cagayan | Rejected | 2025-12-01 16:59:37 | Returned to Applicant | NO TOOLBOX MEETING FORM/DOCUME... See more | |
| 1344 | D-ZION DESIGN AND CONSTRUCTION | CONCRETING OF LITTLE TRINIDAD ... See more | OYAO,DUPAX DEL NORTE ,NUEVA VIZCAYA | Rejected | 2025-12-02 09:56:45 | Returned to Applicant | PROJECT COMPLETED | |
| 1345 | DOLE_RO2_2025-12-09_618_3R1A | MACST CONSTRUCTION AND SUPPLY | CONSTRUCTION OF PROTECTION WAL... See more | ANTUTOT, KASIBU, NUEVA VIZCAYA | Approved | 2025-12-02 13:03:22 | Ready for Release | Processed in 5 working days. |
| 1346 | DIAMOND J BUILDERS | CW-2025-091, COMPLETION OF QUI... See more | CAPITOL HILLS, CABARROGUIS, QUIRINO | Rejected | 2025-12-02 14:42:28 | Returned to Applicant | Findings: First Aider JES... See more | |
| 1347 | J.A.N CONSTRUCTION | MO-GF-2025-686 - CONSTRUCTION ... See more | BAYOMBONG CENTRAL SCHOOL, BAYOMBONG, NUEVA, VIZCAYA. | Rejected | 2025-12-02 16:14:29 | Returned to Applicant | expired PCAB | |
| 1348 | J.A.N CONSTRUCTION | MHO-TF-2025-09-073. - CONSTRUC... See more | BRGY. BANSING, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-12-02 16:20:20 | Returned to Applicant | expired PCAB | |
| 1349 | J.A.N CONSTRUCTION | MHO-TF-2025-09-073. - CONSTRUC... See more | BRGY. BANSING, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-12-02 16:25:45 | Returned to Applicant | expired PCAB | |
| 1350 | DOLE_RO2_2025-12-04_612_VUYG | GCPK CONSTRUCTION AND SUPPLY | LOT 7 REPAIR /REHABILITATION O... See more | MADDELA, QUIRINO | Approved | 2025-12-02 17:03:48 | Ready for Release | Processed in 2 working days. |
| 1351 | DOLE_RO2_2025-12-04_613_58A0 | GCPK CONSTRUCTION AND SUPPLY | LOT 9 REPAIR/REHABILITATION OF... See more | MADDELA, QUIRINO | Approved | 2025-12-02 17:06:10 | Ready for Release | Processed in 2 working days. |
| 1352 | DOLE_RO2_2025-12-09_619_Z25R | GCPK CONSTRUCTION AND SUPPLY | LOT 24 REPAIR/REHABILITATION O... See more | KASIBU, NUEVA VIZCAYA | Approved | 2025-12-02 17:08:30 | Ready for Release | Processed in 5 working days. |
| 1353 | DOLE_RO2_2025-12-09_620_VQPQ | GCPK CONSTRUCTION AND SUPPLY | LOT 22 REPAIR/REHABILITATION O... See more | KASIBU, NUEVA VIZCAYA | Approved | 2025-12-02 17:10:53 | Ready for Release | Processed in 5 working days. |
| 1354 | GCPK CONSTRUCTION AND SUPPLY | LABOR AND MATERIALS FOR THE CO... See more | MASIPI EAST, CABAGAN, ISABELA | Rejected | 2025-12-03 07:25:29 | Returned to Applicant | No NCII Scaffolding and NCII w... See more | |
| 1355 | GCPK CONSTRUCTION AND SUPPLY | SUPPLY, DELIVERY. INSTALLATION... See more | TUMAUINI, ISABELA | Rejected | 2025-12-03 07:28:21 | Returned to Applicant | No NCII Electrician | |
| 1356 | DOLE_RO2_2025-12-09_625_ECP3 | K URBINA CONSTRUCTION | PROVISION OF RENEWABLE ENERGY-... See more | SAN VICENTE, GATTARAN, CAGAYAN | Approved | 2025-12-03 08:09:19 | Ready for Release | Processed in 5 working days. |
| 1357 | DOLE_RO2_2025-12-09_626_OMCN | K URBINA CONSTRUCTION | CONSTRUCTION OF LINE CANAL AT ... See more | CASICALLAN SUR, GATTARAN, CGAYAN | Approved | 2025-12-03 08:19:10 | Ready for Release | Processed in 5 working days. |
| 1358 | DOLE_RO2_2025-12-03_610_4S28 | J.A.N CONSTRUCTION | MO-GF-2025-686-CONSTRUCTION OF... See more | BAYOMBONG CENTRAL SCHOOL, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-12-03 08:24:35 | Ready for Release | Processed in 1 working days. |
| 1359 | DOLE_RO2_2025-12-03_611_WP9C | J.A.N CONSTRUCTION | MHO-TF-2025-09-073. - CONSTRUC... See more | BRGY. BANSING, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-12-03 08:33:10 | Ready for Release | Processed in 1 working days. |
| 1360 | DOLE_RO2_2025-12-09_627_GGEI | DECA CONSTRUCTION | Development of Lasam Town Hall... See more | Centro 02, Lasam,Cagayan | Approved | 2025-12-03 09:15:35 | Ready for Release | Processed in 5 working days. |
| 1361 | DOLE_RO2_2025-12-09_628_529C | SHASHA'S CONSTRUCTION AND SUPPLIES | CONCRETING OF ZONE 7 FMR (PHAS... See more | SAN ESTEBAN, ALCALA, CAGAYAN | Approved | 2025-12-03 09:35:02 | Ready for Release | Processed in 5 working days. |
| 1362 | JIJOMER CONSTRUCTION | 2025-MARIIS-DRD-COB-INFRA-003 ... See more | RAMON, ISABELA | Rejected | 2025-12-03 10:06:18 | Returned to Applicant | CSHP template not duly filled ... See more | |
| 1363 | AFPSLAI OFFICE BUILDING - CAGAYAN BRANCH | Construction of AFPSLAI Office... See more | Maharlika Highway, Caggay, Tuguegarao, Cagayan | Rejected | 2025-12-03 10:21:58 | Returned to Applicant | INCOMPLETE ATTACHEMENT | |
| 1364 | AFPSLAI OFFICE BUILDING - CAGAYAN BRANCH | Construction of AFPSLAI Office... See more | Maharlika Highway, Caggay, Tuguegarao, Cagayan | Rejected | 2025-12-03 10:38:27 | Returned to Applicant | TESDA Cert of Bulanguit and De... See more | |
| 1365 | DOLE_RO2_2025-12-04_614_5SK0 | AGT BUILDERS & CONSTRUCTION SUPPLY | STREET LIGHTING PROJECT ALONG ... See more | NATIONAL HIGHWAY-BARANGAY SAN MIGUEL, MAMBABANGA AND HARANA, LUNA, ISABELA | Approved | 2025-12-03 16:23:15 | Ready for Release | Processed in 1 working days. |
| 1366 | DOLE_RO2_2025-12-05_615_0I9S | GCPK CONSTRUCTION AND SUPPLY | SUPPLY, DELIVERY. INSTALLATION... See more | TUMAUINI, ISABELA | Approved | 2025-12-04 10:02:06 | Ready for Release | Processed in 1 working days. |
| 1367 | DOLE_RO2_2025-12-05_616_D4E6 | GCPK CONSTRUCTION AND SUPPLY | LABOR AND MATERIALS FOR THE CO... See more | MASIPI EAST, CABAGAN, ISABELA | Approved | 2025-12-04 10:29:55 | Ready for Release | Processed in 1 working days. |
| 1368 | DOLE_RO2_2025-12-05_617_35AR | DIAMOND J BUILDERS | Completion of Quirino Province... See more | Capitol Hills, Cabarroguis, Quirino | Approved | 2025-12-04 14:31:25 | Ready for Release | Processed in 1 working days. |
| 1369 | DOLE_RO2_2025-12-09_621_AP5O | JIJOMER CONSTRUCTION | 2025-MARIIS-DRD-COB-INFRA-003 ... See more | RAMON, ISABELA | Approved | 2025-12-05 07:56:38 | Ready for Release | Processed in 3 working days. |
| 1370 | ONEGLOBAL DEVELOPMENT INC. | Procurement of Supply, Deliver... See more | Antonino Alicia, Isabela | Rejected | 2025-12-05 11:37:01 | Returned to Applicant | Incomplete document. Only the ... See more | |
| 1371 | DOLE_RO2_2025-12-09_622_XJF2 | DRAGON TWELVE BUILDERS AND CONSTRUCTION SUPPLY | ITB 06 - LOT 01 – COMPLETION... See more | BRGY. IPIL ECHAGUE, ISABELA | Approved | 2025-12-05 11:45:16 | Ready for Release | Processed in 2 working days. |
| 1372 | DRAGON TWELVE BUILDERS AND CONSTRUCTION SUPPLY | ITB 06 - LOT 02 – CONSTRUCTI... See more | CAPITOL COMPOUND, ALIBAGU, CITYOF ISABELA | Rejected | 2025-12-05 11:50:13 | Returned to Applicant | The First Aider is ADAN L MARA... See more | |
| 1373 | DRAGON TWELVE BUILDERS AND CONSTRUCTION SUPPLY | ITB 06 - LOT 03 – CONRETING ... See more | STO TOMAS AND QUEZON, ISABELA | Rejected | 2025-12-05 11:55:11 | Returned to Applicant | The safety officer and First A... See more | |
| 1374 | DRAGON TWELVE BUILDERS AND CONSTRUCTION SUPPLY | ITB 07 LOT 02 – Dredging/ D... See more | ALICIA, ISABELA | Rejected | 2025-12-05 12:01:56 | Returned to Applicant | The Safety Officer Eric E Timb... See more | |
| 1375 | CAMBERWELL CONSTRUCTION AND SUPPLIES | Rehabilitation/Improvement of ... See more | Gamue, Isabela | Rejected | 2025-12-05 12:36:43 | Returned to Applicant | No signature of AMO at PCAB li... See more | |
| 1376 | Dragon twelve builders and construction supply | ITB 7 lot 03 Dredging/desiltin... See more | antagan to bayabo creek STO TOMAS - delfin albano isabelA | Rejected | 2025-12-05 12:49:35 | Returned to Applicant | no NOA | |
| 1377 | Dragon twelve builders and construction supply | ITB 7 Lot 04 Dredging/desiltin... See more | Brgy Bonifacio Alicia isabela | Rejected | 2025-12-05 13:10:06 | Returned to Applicant | No attached NOA, The safety of... See more | |
| 1378 | ONEGLOBAL DEVELOPMENT INC. | Procurement of Supply, Deliver... See more | Antonino Alicia, Isabela | Rejected | 2025-12-05 13:10:11 | Returned to Applicant | CSHP TEMPLATE NOT DULY FILLED ... See more | |
| 1379 | Dragon twelve builders and construction supply | ITB 7 Lot 5 Dredging/ desiltin... See more | Nagbukel San Isidro isabela | Rejected | 2025-12-05 13:15:42 | Returned to Applicant | no NOA | |
| 1380 | Dragon twelve builders and construction supply | ITB 7 LOT 06 Dredging desiltin... See more | San Guillermo isabela | Rejected | 2025-12-05 13:19:00 | Returned to Applicant | No NOA | |
| 1381 | Dragon twelve builders and construction supply | ITB 7 LOT Dredging desilting w... See more | Calatubban burgos isabela | Rejected | 2025-12-05 13:23:56 | Returned to Applicant | sAFETY oFFICER AND FIRST SAIDE... See more | |
| 1382 | Dragon twelve builders and construction supply | ITB 7 LOT 08 Dredging desiltin... See more | Brgy San Isidro angadanan isabela | Rejected | 2025-12-05 13:27:01 | Returned to Applicant | NO NOA | |
| 1383 | Dragon twelve builders and construction supply | ITB 7 LOT 09 construction of s... See more | Culalabo STO TOMAS isabela | Rejected | 2025-12-05 13:33:11 | Returned to Applicant | Safety officer and First aider... See more | |
| 1384 | Dragon twelve builders and construction supply | ITB 7 LOT 10 construction of r... See more | Barucboc Quezon isabela | Rejected | 2025-12-05 13:37:32 | Returned to Applicant | NO NOA | |
| 1385 | Dragon twelve builders and construction supply | ITB 9 LOT 01 Dredging desiltin... See more | Vintar quirino isabela | Rejected | 2025-12-05 13:51:16 | Returned to Applicant | NO NOA AND CSHP TEMPLATE NOT D... See more | |
| 1386 | Dragon twelve builders and construction supply | ITB 9 LOT 02 Dredging desiltin... See more | Salary San Agustin isabela | Rejected | 2025-12-05 13:54:39 | Returned to Applicant | NO NOA, CSHP TEMPLATE NOT DULY... See more | |
| 1387 | Dragon twelve builders and construction supply | ITB 9 LOT 03 Dredging desiltin... See more | Cebu San Isidro isabela | Rejected | 2025-12-05 14:00:03 | Returned to Applicant | No NOA, CSHP template not duly... See more | |
| 1388 | Dragon twelve builders and construction supply | ITB 9 LOT 04 Dredging desiltin... See more | Dutap San Agustin isabela | Rejected | 2025-12-05 14:02:21 | Returned to Applicant | No NOA, CSHP template not duly... See more | |
| 1389 | Dragon twelve builders and construction supply | ITB 9 LOT 05 Dredging desiltin... See more | Brgy San Juan quirino isabela | Rejected | 2025-12-05 14:06:44 | Returned to Applicant | No NOA, CSHP TEMPLATE NOT DULY... See more | |
| 1390 | Dragon twelve builders and construction supply | ITB 9 LOT 06 Dredging desiltin... See more | Ubbog cabatuan isabela | Rejected | 2025-12-05 14:09:48 | Returned to Applicant | No NOA, Safety officer and Fir... See more | |
| 1391 | Dragon twelve builders and construction supply | ITB 9 LOT 07 Dredging desiltin... See more | Brgy cabaruan quirino isabela | Rejected | 2025-12-05 14:13:10 | Returned to Applicant | no NOA, Safety Officer and Fir... See more | |
| 1392 | Dragon twelve builders and construction supply | ITB 9 LOT 08 Dredging desiltin... See more | San Fermin cauayan city isabela | Rejected | 2025-12-05 14:15:41 | Returned to Applicant | No NOA, CSHP template not duly... See more | |
| 1393 | Dragon twelve builders and construction supply | ITB 9 LOT 09 Dredging desiltin... See more | Cabaruan cauayan city isabela | Rejected | 2025-12-05 14:18:37 | Returned to Applicant | no NOA, First aider has an ong... See more | |
| 1394 | Dragon twelve builders and construction supply | ITB 9 LOT 10 Dredging desiltin... See more | Alicaocao cauayan city isabela | Rejected | 2025-12-05 14:21:04 | Returned to Applicant | NO NOA | |
| 1395 | Dragon twelve builders and construction supply | ITB 10 LOT 01 Dredging desilti... See more | Moringa San Pablo isabela | Rejected | 2025-12-05 14:24:16 | Returned to Applicant | No NOA, CSHP template not duly... See more | |
| 1396 | D-ZION DESIGN AND CONSTRUCTION | CONSTRUCTION OF MULTI-PURPOSE ... See more | BUTAO DUPAX DEL NORTE NUEVA VIZCAYA | Rejected | 2025-12-05 14:28:29 | Returned to Applicant | PROJECT COMPLETED | |
| 1397 | Dragon twelve builders and construction supply | ITB 10 LOT 03 rehabilitation o... See more | UCME San Pablo isabela | Rejected | 2025-12-05 14:49:05 | Returned to Applicant | no NOA, CSHP template not duly... See more | |
| 1398 | Dragon twelve builders and construction supply | ITB 10 LOT 04 Dredging desilti... See more | Calamagui west sta Maria Isabela | Rejected | 2025-12-05 14:51:58 | Returned to Applicant | no NOA | |
| 1399 | Dragon twelve builders and construction supply | ITB 10 LOT 02 construction of ... See more | ICU San Pablo isabela | Rejected | 2025-12-05 14:56:14 | Returned to Applicant | No NOA, CSHP template not duly... See more | |
| 1400 | Dragon twelve builders and construction supply | ITB 10 LOT 07 Dredging desilti... See more | STO TOMAS ISABELA | Rejected | 2025-12-05 15:44:18 | Returned to Applicant | No NOA, CSHP template not duly... See more | |
| 1401 | Dragon twelve builders and construction supply | ITB 10 LOT 05 Dredging desilti... See more | Macaocaoayan Alicia isabela | Rejected | 2025-12-05 15:52:50 | Returned to Applicant | no NOA | |
| 1402 | Dragon twelve builders and construction supply | ITB 10 LOT 06 Dredging desilti... See more | Ubbog cabatuan isabela | Rejected | 2025-12-05 15:56:25 | Returned to Applicant | No NOA, CSHP template not duly... See more | |
| 1403 | Dragon twelve builders and construction supply | ITB 11 LOT 01 construction of ... See more | Santiago quirino isabela | Rejected | 2025-12-05 15:58:24 | Returned to Applicant | No NOA, Safety officer, and Fi... See more | |
| 1404 | EH MILIO CONSTRUCTION | IMPROVEMENT OF FMR MALONG | BRGY. PAPAYA KASIBU NUEVA VIZCAYA | Rejected | 2025-12-05 16:12:52 | Returned to Applicant | NO SIGNATURE IN PCAB | |
| 1405 | EH MILIO CONSTRUCTION | COMPLETION OF GSD OFFICE | POBLACION KASIBU NUEVA VIZCAYA | Rejected | 2025-12-05 16:21:48 | Returned to Applicant | NO SIGNATURE IN PCAB | |
| 1406 | POWERCHINA PHILIPPINES CORP. | 70MWac Linglingay Solar Power ... See more | Linglingay, Gamu Isabela | Rejected | 2025-12-05 16:31:47 | Returned to Applicant | CSHP template, not the templat... See more | |
| 1407 | EH MILIO CONSTRUCTION | CONSTRUCTION OF STANDARD CHILD... See more | BRGY MAKUDYAW BIYOY KASIBU NUEVA VIZCAYA | Rejected | 2025-12-05 16:36:11 | Returned to Applicant | LESLIE MAY SALAZAR with anothe... See more | |
| 1408 | EH MILIO CONSTRUCTION | CONSTRUCTION OF FLOOD CONTROL ... See more | BRGY PAO KASIBU NUEVA VIZCAYA | Rejected | 2025-12-05 16:46:48 | Returned to Applicant | MARIO SABALA with another proj... See more | |
| 1409 | ACES 3 CONSTRUCTION | PB-CW-2025-094 | LUTTUAD,DIFFUN,QUIRINO | Rejected | 2025-12-05 17:13:16 | Returned to Applicant | PROJECT COMPLETED | |
| 1410 | ACES 3 CONSTRUCTION | PB-CW-2025-093-CONSTRUCTION OF... See more | VILLA PASCUA,DIFFUN QUIRINO | Rejected | 2025-12-06 08:50:51 | Returned to Applicant | PROJECT COMPLETED | |
| 1411 | ACES 3 CONSTRUCTION | PB-CW-2025-094-CONSTRUCTION OF... See more | LUTTUAD,DIFFUN QUIRINO | Rejected | 2025-12-06 08:55:07 | Returned to Applicant | Double Entry | |
| 1412 | DOLE_RO2_2025-12-15_642_FDME | ACES 3 CONSTRUCTION | PB-CW-2025-089-CONSTRUCTION OF... See more | BALLIGUI, MADDELA,QUIRINO | Approved | 2025-12-06 09:28:20 | Ready for Release | Pending Processed in 6 working... See more |
| 1413 | WILL DECENA AND ASSOCIATES INC. (WDA Inc.) | PROPOSED CONSTRUCTION OF R-SQU... See more | Laoag Street Corner, Santiago-Tuguegarao Road, Barangay San Juan, Aurora, Isabela | Rejected | 2025-12-08 09:18:30 | Returned to Applicant | -No CSHP application attached,... See more | |
| 1414 | DOLE_RO2_2025-12-10_639_A2N0 | DECERIE'S CONSTRUCTION | GLOBE BUILD TO SUIT BTS PH0202... See more | PARUG-PARUG, SOLANA,CAGAYAN | Approved | 2025-12-08 13:48:26 | Ready for Release | Processed in 3 working days. |
| 1415 | DOLE_RO2_2025-12-09_624_TVFU | TRIPLE H BUILDERS CONSTRUCTION SERVICES | REPAIR AND IMPROVEMENT OF THE ... See more | BRGY. MALASIN, DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2025-12-08 15:47:57 | Ready for Release | Processed in 1 working days. |
| 1416 | WEALTHMORE CONSTRUCTION & SUPPLY CORPORATION | NCB-INFRA-QIMO-01-25 | AGLIPAY QUIRINO PROVINCE | Rejected | 2025-12-08 16:07:48 | Returned to Applicant | OLD TEMPLATE (APPLICATION FORM... See more | |
| 1417 | DOLE_RO2_2025-12-10_640_VFQD | KOMICHOV GENERAL CONSTRUCTION | IMPROVEMENT OF VARIOUS FARM TO... See more | VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-12-08 21:56:50 | Ready for Release | Processed in 2 working days. |
| 1418 | Dragon twelve builders and construction supply | ITB 11 LOT 04 CONSTRUCTION OF ... See more | Brgy NANAGUAN CITY OF ILAGAN ISABELA | Rejected | 2025-12-09 09:36:44 | Returned to Applicant | No NOA, CSHP template not duly... See more | |
| 1419 | DOLE_RO2_2025-12-09_629_P2ZI | FBS Engineering & Construction | Construction of River Flood Co... See more | Hacienda-Intal, Baggao, Cagayan | Approved | 2025-12-09 09:48:56 | Ready for Release | Processed in 1 working days. |
| 1420 | WEALTHMORE CONSTRUCTION & SUPPLY CORPORATION | NCB-INFRA-QIMO-01-25 | AGLIPAY QUIRINO PROVINCE | Rejected | 2025-12-09 10:37:04 | Returned to Applicant | Double entry | |
| 1421 | DOLE_RO2_2025-12-09_630_0VJO | WEALTHMORE CONSTRUCTION & SUPPLY CORPORATION7 | NCB-INFRA-QIMO-01-25 | AGLIPAY QUIRINO PROVINCE | Approved | 2025-12-09 11:01:01 | Ready for Release | Processed in 1 working days. |
| 1422 | DOLE_RO2_2025-12-10_633_0XPF | 5MJ'S CONSTRUCTION | CONSTRUCTION OF ELEVATOR AT CE... See more | CENTRO 01, APARRI, CAGAYAN | Approved | 2025-12-09 13:01:13 | Ready for Release | Processed in 1 working days. |
| 1423 | DOLE_RO2_2025-12-10_634_CO9A | 5MJ'S CONSTRUCTION | IMPROVEMENT OF MDRRMO OFFICE A... See more | CENTRO 01, APARRI, CAGAYAN | Approved | 2025-12-09 13:17:00 | Ready for Release | Processed in 1 working days. |
| 1424 | DOLE_RO2_2025-12-10_635_6EFV | 5MJ'S CONSTRUCTION | CONSTRUCTION OF TTODA SHED OF ... See more | MAURA, APARRI, CAGAYAN | Approved | 2025-12-09 13:22:53 | Ready for Release | Processed in 1 working days. |
| 1425 | DOLE_RO2_2025-12-10_636_5JSS | 5MJ'S CONSTRUCTION | CONSTRUCTION OF TERMINAL AT MA... See more | MAURA, APARRI, CAGAYAN | Approved | 2025-12-09 13:26:27 | Ready for Release | Processed in 1 working days. |
| 1426 | WILL DECENA AND ASSOCIATES INC. (WDA Inc.) | PROPOSED CONSTRUCTION OF R-SQU... See more | Laoag Street Corner, Santiago-Tuguegarao Road, Barangay San Juan, Aurora, Isabela | Rejected | 2025-12-09 13:29:19 | Returned to Applicant | DOUBLE ENTRY | |
| 1427 | POWERCHINA PHILIPPINES CORP. | 70MWac Linglingay Solar Power ... See more | Linglingay, Gamu Isabela | Rejected | 2025-12-09 14:15:33 | Returned to Applicant | double entry | |
| 1428 | DOLE_RO2_2025-12-09_631_K42H | CHELSEA BUILDERS | CONCRETING OF ROAD AT AGAMAN N... See more | BAGGAO, CAGAYAN | Approved | 2025-12-09 14:25:36 | Ready for Release | Processed in 1 working days. |
| 1429 | DOLE_RO2_2025-12-09_632_GLY3 | PNC CONSTRUCTION | CONSTRUCTION OF LINE CANAL AND... See more | GATTARAN, CAGAYAN | Approved | 2025-12-09 14:28:31 | Ready for Release | Processed in 1 working days. |
| 1430 | DOLE_RO2_2025-12-09_633_Z9Q8 | PNC CONSTRUCTION | CONCRETING OF ROAD | NADDUNGAN, GATTARAN, CAGAYAN | Approved | 2025-12-09 14:30:46 | Ready for Release | Processed in 1 working days. |
| 1431 | DOLE_RO2_2025-12-10_641_75KV | CAMBERWELL CONSTRUCTION AND SUPPLIES | Rehabilitation/Improvement of ... See more | Gamu, Isabela | Approved | 2025-12-09 15:04:35 | Ready for Release | Processed in 2 working days. |
| 1432 | POWERCHINA PHILIPPINES CORP. | 70MWac Linglingay Solar Power ... See more | Linglingay, Gamu Isabela | Rejected | 2025-12-09 15:32:59 | Returned to Applicant | UNDER DO 252 series of 2025, 2... See more | |
| 1433 | DOLE_RO2_2025-12-10_637_1QAQ | POWERCHINA PHILIPPINES CORP. | 70MWac Linglingay Solar Power ... See more | Linglingay, Gamu Isabela | Approved | 2025-12-09 19:15:17 | Ready for Release | Processed in 1 working days. |
| 1434 | ONEGLOBAL DEVELOPMENT INC. | Procurement of Supply, Deliver... See more | Antonino Alicia, Isabela | Rejected | 2025-12-10 09:24:24 | Returned to Applicant | CSHP template not duly filed o... See more | |
| 1435 | DOLE_RO2_2025-12-10_638_TV4T | UNI-ASCON CONSTRUCTION | REPAIR/REHABILITATION OF ALCAL... See more | ALCALA, CAGAYAN | Approved | 2025-12-10 09:30:55 | Ready for Release | Processed in 1 working days. |
| 1436 | Taikisha Philippines Inc. | Proposed Radar Station Bldg.A ... See more | Mt. Leson, San Vicente, Santa Ana, Cagayan Valley | Rejected | 2025-12-10 14:54:21 | Returned to Applicant | NOT USE DOLE CSHP TEMPLATE | |
| 1437 | HORIVER CONSTRUCTION | REHABILITATION OF MASONRY DRAI... See more | PROVINCIAL ROAD, PALLUA SUR, TUGUEGARAO CITY | Rejected | 2025-12-10 17:19:00 | Returned to Applicant | The designated Safety Officer ... See more | |
| 1438 | DOLE_RO2_2025-12-15_644_9YZA | EH MILIO CONSTRUCTION | IMPROVEMENT OF FMR MALONG | BRGY. PAPAYA KASIBU NUEVA VIZCAYA | Approved | 2025-12-11 08:30:42 | Ready for Release | Processed in 3 working days. |
| 1439 | DOLE_RO2_2025-12-15_645_Z5Y3 | EH MILIO CONSTRUCTION | COMPLETION OF GSD OFFICE | POBLACION KASIBU NUEVA VIZCAYA | Approved | 2025-12-11 08:43:18 | Ready for Release | Processed in 3 working days. |
| 1440 | DOLE_RO2_2025-12-15_646_2QMK | EH MILIO CONSTRUCTION | CONSTRUCTION OF STANDARD CHILD... See more | BRGY MAKUDYAW BIYOY KASIBU NUEVA VIZCAYA | Approved | 2025-12-11 08:49:04 | Ready for Release | Processed in 3 working days. |
| 1441 | EH MILIO CONSTRUCTION | CONSTRUCTION OF FLOOD CONTROL ... See more | BRGY PAO KASIBU NUEVA VIZCAYA | Rejected | 2025-12-11 08:54:09 | Returned to Applicant | training certificate of your d... See more | |
| 1442 | HORIVER CONSTRUCTION | Rejected | 2025-12-11 09:01:27 | Returned to Applicant | The designated First Aider is ... See more | |||
| 1443 | DECA CONSTRUCTION | CALAPANGAN SUR ACCESS ROAD AT ... See more | CALAPANGAN SUR, LASAM, CAGAYAN | Rejected | 2025-12-11 09:43:04 | Returned to Applicant | the testing certificate for th... See more | |
| 1444 | DOLE_RO2_2025-12-15_643_M5K3 | CJTPASCUAL CONSTRUCTION | DEVELOPMENT OF LASAM MUNICIPAL... See more | Centro 02, Lasam,Cagayan | Approved | 2025-12-11 09:47:10 | Ready for Release | Processed in 2 working days. |
| 1445 | MAVCON CIVIL ENGINEERING CONSTRUCTION | 40M 3 LEGGED SELF SUPPORTING T... See more | Brgy. Magapit, Lallo, Cagayan | Rejected | 2025-12-11 11:47:08 | Returned to Applicant | Please reapply to Cagayan with... See more | |
| 1446 | DOLE_RO2_2025-12-15_647_XVXM | ONEGLOBAL DEVELOPMENT INC. | Procurement of Supply, Deliver... See more | Antonino Alicia, Isabela | Approved | 2025-12-11 14:47:22 | Ready for Release | Processed in 3 working days. |
| 1447 | DECA CONSTRUCTION | CALAPANGAN SUR ACCESS ROAD AT ... See more | CALAPANGAN SUR, LASAM, CAGAYAN | Rejected | 2025-12-12 10:58:38 | Returned to Applicant | OPERATOR CHERWIN ROMANO NOT VE... See more | |
| 1448 | MAVCON CIVIL ENGINEERING CONSTRUCTION | 40M 3 LEGGED SELF SUPPORTING T... See more | Brgy. Magapit, Lallo, Cagayan | Rejected | 2025-12-15 14:22:25 | Returned to Applicant | PLEASE UPLOAD LEASE AGREEMENT ... See more | |
| 1449 | DOLE_RO2_2025-12-16_648_ECCA | OUA CONSTRUCTION | OPENING AND CONSTRUCTION OF RO... See more | BARANGAY MACUGAY, LUNA, ISABELA | Approved | 2025-12-15 16:05:15 | Ready for Release | Processed in 2 working days. |
| 1450 | DOLE_RO2_2025-12-16_649_QR4W | OUA CONSTRUCTION | CONSTRUCTION OF 1CL JCD TYPE S... See more | BUILDING AT BARANGAY SAN LUIS, CAUAYAN CITY, ISABELA | Approved | 2025-12-15 16:23:25 | Ready for Release | Processed in 2 working days. |
| 1451 | Taikisha Philippines Inc. | Proposed Radar Station Bldg.A ... See more | Mt. Leson, San Vicente, Santa Ana, Cagayan Valley | Rejected | 2025-12-15 17:36:54 | Returned to Applicant | NO ATTACHED CSHP APPLICATION F... See more | |
| 1452 | DOLE_RO2_2025-12-22_654_FJ6A | JM BAYATAN CONSTRUCTION AND SUPPLY | REHABILITATION/IMPROVEMENT OF ... See more | VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-12-15 18:18:16 | Ready for Release | Processed in 5 working days. |
| 1453 | DOLE_RO2_2025-12-22_655_N49Z | JM BAYATAN CONSTRUCTION AND SUPPLY | REHABILITATION/IMPROVEMENT OF ... See more | VILLAVERDE, NUEVA VIZCAYA | Approved | 2025-12-15 18:21:37 | Ready for Release | Processed in 5 working days. |
| 1454 | DOLE_RO2_2025-12-22_656_K97R | EH MILIO CONSTRUCTION | CONSTRUCTION OF FLOOD CONTROL ... See more | BRGY PAO KASIBU NUEVA VIZCAYA | Approved | 2025-12-16 07:43:21 | Ready for Release | Processed in 5 working days. |
| 1455 | Whiteport, Inc. | North Gateway Business Park | Enrile Avenue, Carig Sur, Tuguegarao City, Cagayan | Rejected | 2025-12-16 08:39:51 | Returned to Applicant | NO CERTIFICATE OF EMPLOYMENT F... See more | |
| 1456 | K. URBINA CONSTRUCTION | CONSTRUCTION OF LINE CANAL AT ... See more | Aguiguican, Gattaran, Cagayan | Rejected | 2025-12-16 09:08:36 | Returned to Applicant | EXPIRED PCAB | |
| 1457 | MILESTON 888 CONSTRUCTION INC. | CONSTRUCTION OF ROAD AT ZONE 5... See more | ZONE 5, SAN MIGUEL, BAGGAO, CAGAYAN | Rejected | 2025-12-16 09:16:04 | Returned to Applicant | PROJECT COMPLETED | |
| 1458 | DOLE_RO2_2025-12-17_650_E4WO | UNI-ASCON CONSTRUCTION | REPAIR/ REHABILITATION OF DON ... See more | DIFFUN, QUIRINO | Approved | 2025-12-16 13:26:08 | Ready for Release | Processed in 2 working days. |
| 1459 | WILL DECENA AND ASSOCIATES INC. (WDA Inc.) | PROPOSED CONSTRUCTION OF R-SQU... See more | LAOAG STREET CORNER SANTIAGO-TUGEGARAO ROAD, SAN JUAN, AURORA, ISABELA | Rejected | 2025-12-16 15:00:07 | Returned to Applicant | No attached CSHP application f... See more | |
| 1460 | DOLE_RO2_2025-12-17_651_NTMJ | FASTBUILT CONSTRUCTION, INC. | CONSTRUCTION OF SAFE AND GENDE... See more | TALLANG, BAGGAO, CAGAYAN | Approved | 2025-12-16 16:42:07 | Ready for Release | Processed in 1 working days. |
| 1461 | D.ELERIA CONSTRUCTION | LGUCQ-IP-2025-0061 - COMPLETIO... See more | ZAMORA, CABARROGUIS, QUIRINO | Rejected | 2025-12-16 17:44:19 | Returned to Applicant | SAFETY OFFICER AND FIRST AIDER... See more | |
| 1462 | DOLE_RO2_2025-12-22_657_Q64O | JM BAYATAN CONSTRUCTION AND SUPPLY | CONSTRUCTION OF SLOPE PROTECTI... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-12-16 17:45:38 | Ready for Release | Processed in 4 working days. |
| 1463 | DOLE_RO2_2025-12-22_658_D4I7 | M & F ENTERPRISE | UPGRADING OF TIREPATH LOCATED ... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-12-16 17:49:19 | Ready for Release | Processed in 4 working days. |
| 1464 | DOLE_RO2_2025-12-22_659_SRKN | WINLEI CONSTRUCTION AND SUPPLY | CONSTRUCTION OF COMMUNAL COMFO... See more | BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-12-16 17:53:43 | Ready for Release | Processed in 4 working days. |
| 1465 | AFPSLAI OFFICE BUILDING - CAGAYAN BRANCH | Construction of AFPSLAI Office... See more | Maharlika Highway, Caggay, Tuguegarao, Cagayan | Rejected | 2025-12-16 19:33:21 | Returned to Applicant | DOCUMENTS NOT PROPERLY SCANNED... See more | |
| 1466 | D.ELERIA CONSTRUCTION | LGUCQ-IP-2025-0072 - ESTABLISH... See more | BURGOS, CABARROGUIS, QUIRINO | Rejected | 2025-12-17 07:00:42 | Returned to Applicant | SAFETY OFFICER AND FIRST AIDER... See more | |
| 1467 | JOHN 6:51 BUILDERS | CONSTRUCTION OF DRAINAGE STRUC... See more | MABINI STREET INTERIOR AND MARIBBAY STREET INTERIOR, UGAC NORTE, TUGUEGARAO CITY | Rejected | 2025-12-17 07:42:46 | Returned to Applicant | FIRST AIDER WITH EXISTING PROJ... See more | |
| 1468 | DOLE_RO2_2025-12-17_652_U4XE | RJR'S CONSTRUCTION | CONSTRUCTION OF TWO CLASSROOM ... See more | BITAG GRANDE,BAGGAO, CAGAYAN | Approved | 2025-12-17 09:04:40 | Ready for Release | Processed in 1 working days. |
| 1469 | Juris Constrtuction & Builders | PB-CW-2025-096 COnstruction of... See more | La Paz, Saguday, Quirino | Rejected | 2025-12-17 09:33:29 | Returned to Applicant | PROJECT COMPLETED | |
| 1470 | DOLE_RO2_2025-12-22_660_JPE7 | DECA CONSTRUCTION | CALAPANGAN SUR ACCESS ROAD AT ... See more | CALAPANGAN SUR, LASAM, CAGAYAN | Approved | 2025-12-17 10:19:34 | Ready for Release | Processed in 4 working days. |
| 1471 | WILL DECENA AND ASSOCIATES INC. (WDA Inc.) | PROPOSED CONSTRUCTION OF R-SQU... See more | LAOAG STREET CORNER SANTIAGO-TUGEGARAO ROAD, SAN JUAN, AURORA, ISABELA | Rejected | 2025-12-17 10:33:19 | Returned to Applicant | Additional OH Nurse | |
| 1472 | Taikisha Philippines Inc. | Proposed Radar Station Bldg.A ... See more | Mt. Leson, San Vicente, Santa Ana, Cagayan Valley | Rejected | 2025-12-17 12:46:32 | Returned to Applicant | a. The Certificate of Training... See more | |
| 1473 | WILL DECENA AND ASSOCIATES INC. (WDA Inc.) | PROPOSED CONSTRUCTION OF R-SQU... See more | LAOAG STREET CORNER SANTIAGO-TUGEGARAO ROAD, SAN JUAN, AURORA, ISABELA | Rejected | 2025-12-18 10:03:24 | Returned to Applicant | Please provide a proof of prov... See more | |
| 1474 | D.ELERIA CONSTRUCTION | LGUCQ-IP-2025-0061 - COMPLETIO... See more | ZAMORA, CABARROGUIS, QUIRINO | Rejected | 2025-12-18 10:46:22 | Returned to Applicant | CERTIFICATES ATTACHED AS SO AN... See more | |
| 1475 | DOLE_RO2_2025-12-19_653_Q179 | D.ELERIA CONSTRUCTION | LGUCQ-IP-2025-0072 - ESTABLISH... See more | BURGOS, CABARROGUIS, QUIRINO | Approved | 2025-12-18 11:15:01 | Ready for Release | Processed in 1 working days. |
| 1476 | ISERVE CUSTOMER MANAGEMENT SOLUTIONS (ISERVE) INC. | PROPOSED ONE STOREY COMMERCIAL... See more | BRGY. TAGARAN, CUAYAN, ISABELA | Rejected | 2025-12-18 12:03:13 | Returned to Applicant | The CSHP template was not duly... See more | |
| 1477 | JOHN 6:51 BUILDERS | CONSTRUCTION OF DRAINAGE STRUC... See more | TAGACAY ST., ANNAFUNAN EAST, TUGUEGARAO CITY | Rejected | 2025-12-18 12:49:34 | Returned to Applicant | designated First Aider is pres... See more | |
| 1478 | ISERVE CUSTOMER MANAGEMENT SOLUTIONS (ISERVE) INC. | PROPOSED ONE STOREY COMMERCIAL... See more | BRGY. TAGARAN, CUAYAN, ISABELA | Rejected | 2025-12-18 12:59:45 | Returned to Applicant | Double Entry #1649 | |
| 1479 | JOHN 6:51 BUILDERS | CONSTRUCTION OF DRAINAGE STRUC... See more | BARSABAL STREET AND GUZMAN STREET, CATTAGGAMAN NUEVO, TUGUEGARAO CITY | Rejected | 2025-12-18 13:07:16 | Returned to Applicant | SO WITH EXISTING PROJECT | |
| 1480 | C.T. LEONCIO CONTRUCTION & TRADING | UPGRADING OF PANGAWAN-BANAO FA... See more | KAYAPA, NUEVA VIZCAYA | Rejected | 2025-12-18 13:33:46 | Returned to Applicant | INCOMPLETE DOCUMENTS | |
| 1481 | DOLE_RO2_2025-12-26_662_ICO6 | DECA CONSTRUCTION | CONSTRUCTION OF YOUTH LEARNING... See more | Centro 02, Lasam,Cagayan | Approved | 2025-12-18 14:43:59 | Ready for Release | Processed in 7 working days. |
| 1482 | DOLE_RO2_2025-12-26_663_0EBA | JOHN 6:51 BUILDERS | CONCRETING OF ROAD | TALLUD STREET AND ZONE 4,TAGGA,TUGUEGARAO CITY | Approved | 2025-12-19 10:48:13 | Ready for Release | Processed in 6 working days. |
| 1483 | JOHN 6:51 BUILDERS | CONCRETING OF ROAD | CANAYA STREET EXTENSION, GOSI SUR, TUGUEGARAO CITY | Rejected | 2025-12-19 10:57:30 | Returned to Applicant | FINISHED PROJECT | |
| 1484 | VALLEY CONSTRUCTION AND GENERAL MERCHANDISE | CONSTRUCTION OF MASONRY DRAINA... See more | Old Provincial Road, Cattaggaman Nuevo, Tuvuegarao City | Rejected | 2025-12-19 11:00:57 | Returned to Applicant | UNSIGNED DOCUMENTS INCLUDING P... See more | |
| 1485 | DOLE_RO2_2025-12-22_661_LY1Z | C.T. LEONCIO CONSTRUCTION AND TRADING | UPGRADING OF PANGAWAN-BANAO FA... See more | KAYAPA, NUEVA VIZCAYA | Approved | 2025-12-19 11:05:15 | Ready for Release | Processed in 2 working days. |
| 1486 | HJM CONSTRUCTION SERVICES | NAME OF PROJECT: CONCRETING OF... See more | PUROK 2, STO. DOMINGO, CABARROGUIS, QUIRINO | Rejected | 2025-12-19 12:06:32 | Returned to Applicant | Can't openfile | |
| 1487 | J.A.N CONSTRUCTION | NAME OF PROJECT: CONCRETING OF... See more | DELA PEÑA STREET, PUROK 5, SAN MARCOS, CABARROGUIS QUIRINO. | Rejected | 2025-12-19 12:33:33 | Returned to Applicant | FINISHED PROJECT | |
| 1488 | HJM CONSTRUCTION SERVICES | NAME OF PROJECT: CONCRETING OF... See more | PUROK 2, STO. DOMINGO, CABARROGUIS, QUIRINO | Rejected | 2025-12-19 14:37:22 | Returned to Applicant | FINISHED PROJECT | |
| 1489 | G.T.Y. Construction | Desilting of Taan Dam Reservoi... See more | Taan, Alfonso Castaneda, Nueva Vizcaya | Rejected | 2025-12-19 16:44:05 | Returned to Applicant | No Letter of Intent Signature... See more | |
| 1490 | G.T.Y. Construction | Clearing and Regravelling of C... See more | Brgy. Pelaway, Alfonso Castaneda, Nueva Vizcaya | Rejected | 2025-12-19 16:48:07 | Returned to Applicant | No Letter of Intent Signature... See more | |
| 1491 | AFPSLAI OFFICE BUILDING - CAGAYAN BRANCH | Construction of AFPSLAI Office... See more | Maharlika Highway, Caggay, Tuguegarao, Cagayan | Rejected | 2025-12-22 07:50:32 | Returned to Applicant | EXPRIED CHE TESTING CERTIFICAT... See more | |
| 1492 | SIFFU ROCKS CONSTRUCTION | INFRA-2025-11-29: REHABILITATI... See more | LUNA, ISABELA | Rejected | 2025-12-22 12:26:00 | Returned to Applicant | Testing Certificates of the he... See more | |
| 1493 | DOLE_RO2_2025-12-26_664_J76T | JHUERS CONSTRUCTION | CONCRETING OF BENNET ROAD TO B... See more | BRGY. DON MARIANO PEREZ, BAYOMBONG, NUEVA VIZCAYA | Approved | 2025-12-22 15:27:39 | Ready for Release | Processed in 5 working days. |
| 1494 | DOLE_RO2_2025-12-26_665_J26F | D.ELERIA CONSTRUCTION | LGUCQ-IP-2025-0061 - COMPLETIO... See more | ZAMORA, CABARROGUIS, QUIRINO | Approved | 2025-12-23 08:47:21 | Ready for Release | Processed in 4 working days. |
| 1495 | G.T.Y. Construction | Clearing and Regravelling of C... See more | Brgy. Pelaway, Alfonso Castaneda, Nueva Vizcaya | Rejected | 2025-12-23 10:36:59 | Returned to Applicant | 1. NO Signature of Project Own... See more | |
| 1496 | G.T.Y. Construction | Desilting of Taan Dam Reservoi... See more | Taan, Alfonso Castaneda, Nueva Vizcaya | Rejected | 2025-12-23 10:39:26 | Returned to Applicant | 1. NO Signature of Project Own... See more | |
| 1497 | SIFFU ROCKS CONSTRUCTION | INFRA-2025-11-29: REHABILITATI... See more | LUNA, ISABELA | Rejected | 2025-12-26 09:01:37 | Returned to Applicant | DOUBLE ENTRY | |
| 1498 | Consortium of Everstone and SUMEC Philippines | 440.077 MWp Isabela Photovolta... See more | Brgy. Bagong Silang, City of Ilagan, Isabela | Rejected | 2025-12-26 17:54:51 | Returned to Applicant | 1. The number of employees did... See more | |
| 1499 | DOLE_RO2_2026-01-05_666_7747 | PRC CONSTRUCTION | CW-C-UCRIS QUEZON UPPER QMC-20... See more | QUEZON, ISABELA | Approved | 2025-12-29 13:23:36 | Ready for Release | Processed in 6 working days. |
| 1500 | DOLE_RO2_2026-01-06_667_1LHI | JC SOLIDARITY CONSTRUCTION | INFRA-NCB-CBIMO-93-25 IMPROVEM... See more | APPARI, CAGAYAN | Approved | 2025-12-29 13:53:09 | Ready for Release | Processed in 6 working days. |
| 1501 | JHUERS CONSTRUCTION | CONCRETING OF BARANGAY ROAD | PUROK 4 BRGY. MAGAPUY, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2025-12-30 11:44:24 | Returned to Applicant | No signature on application fo... See more | |
| 1502 | JHUERS CONSTRUCTION | REHABILITATION/ IMPROVEMENT OF... See more | SOLANO, NUEVA VIZCAYA | Rejected | 2025-12-30 13:03:51 | Returned to Applicant | UNSIGNED APPLICATION FORM | |
| 1503 | JHUERS CONSTRUCTION | ROAD CONCRETING PROJECTS | BARANGAY AMPAKLENG, VILLA FLORENTINO AND VILLA AURORA, DIADI, NUEVA VIZCAYA | Rejected | 2025-12-30 13:27:34 | Returned to Applicant | UNSIGNED APPLICATION FORM | |
| 1504 | D-ZION DESIGN AND CONSTRUCTION | COMPLETION OF STAGE AT BARANGA... See more | BARANGAY TADJI,KASIBU,NUEVA VIZCAYA | Rejected | 2025-12-31 10:03:01 | Returned to Applicant | please submit application @ cs... See more | |
| 1505 | DOLE_RO2_2026-01-06_669_3II5 | Malaya Architecture Creatives | Repair and Improvement of Cent... See more | CVRRCY, Roma Norte, Enrile, Cagayan | Approved | 2026-01-05 09:31:32 | Ready for Release | Processed in 2 working days. |
| 1506 | BALLIGI CONSTRUCTION AND DEVELOPMENT CORPORATION | Construction of AFPSLAI Office... See more | Maharlika Highway, Caggay, Tuguegarao, Cagayan | Rejected | 2026-01-05 10:50:17 | Returned to Applicant | The testing certificates of th... See more | |
| 1507 | AFPSLAI OFFICE BUILDING - CAGAYAN BRANCH | Construction of AFPSLAI Office... See more | Maharlika Highway, Caggay, Tuguegarao, Cagayan | Rejected | 2026-01-05 10:51:58 | Returned to Applicant | DOUBLE ENTRY | |
| 1508 | Whiteport, Inc. | North Gateway Business Park | Enrile Avenue, Carig Sur, Tuguegarao City, Cagayan | Rejected | 2026-01-05 13:05:33 | Returned to Applicant | CSHP TEMPLATE NOT FILL OUT PRO... See more | |
| 1509 | DOLE_RO2_2026-01-06_668_VFOD | SIFFU ROCKS CONSTRUCTION | INFRA-2025-11-29: REHABILITATI... See more | LUNA, ISABELA | Approved | 2026-01-05 14:14:29 | Ready for Release | Processed in 1 working days. |
| 1510 | AFPSLAI OFFICE BUILDING - CAGAYAN BRANCH | Construction of AFPSLAI Office... See more | Maharlika Highway, Caggay, Tuguegarao, Cagayan | Rejected | 2026-01-05 14:48:12 | Returned to Applicant | 1. The testing certificates of... See more | |
| 1511 | AMBAGUIO BUILDERS | CONCRETING OF BALETE-BUYASYAS-... See more | ARITAO, NUEVA VIZCAYA | Rejected | 2026-01-05 15:44:21 | Returned to Applicant | please submit application @ cs... See more | |
| 1512 | DOLE_RO2_2026-01-08_671_QBGA | JHUERS CONSTRUCTION | CONSTRUCTION OF COFFEE PROCESS... See more | DUPAX DEL SUR, NUEVA VIZCAYA | Approved | 2026-01-05 19:28:58 | Ready for Release | Processed in 3 working days. |
| 1513 | AHRENS CONSTRUCTION SERVICES | IMPROVEMENT OF CANAL LINING AT... See more | DUPAX DEL NORTE, NUEVA VIZCAYA | Rejected | 2026-01-05 19:43:50 | Returned to Applicant | DUPLICATE | |
| 1514 | DOLE_RO2_2026-01-08_672_LE2E | AHRENS CONSTRUCTION SERVICES | IMPROVEMENT OF DRAINAGE CANAL... See more | DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2026-01-05 19:57:47 | Ready for Release | Processed in 3 working days. |
| 1515 | DOLE_RO2_2026-01-08_673_EE1L | AHRENS CONSTRUCTION SERVICES | IMPROVEMENT OF CANAL LINING AT... See more | DUPAX DEL NORTE, NUEVA VIZCAYA | Approved | 2026-01-05 20:02:35 | Ready for Release | Processed in 3 working days. |
| 1516 | MACST CONSTRUCTION AND SUPPLY | CONSTRUCTION OF STANDARD CHILD... See more | POBLACION , KASIBU, NUEVA VIZCAYA | Rejected | 2026-01-06 07:12:50 | Returned to Applicant | please submit application @ cs... See more | |
| 1517 | MACST CONSTRUCTION AND SUPPLY | CONSTRUCTION OF SAFETY AIDS(RA... See more | ANTUTOT, KASIBU, NUEVA VIZCAYA | Rejected | 2026-01-06 07:22:16 | Returned to Applicant | please submit application @ cs... See more | |
| 1518 | MACST CONSTRUCTION AND SUPPLY | CONSTRUCTION OF MULTIPURPOSE B... See more | ANTUTOT, KASIBU, NUEVA VIZCAYA | Rejected | 2026-01-06 07:25:32 | Returned to Applicant | please submit application @ cs... See more | |
| 1519 | AMBAGUIO BUILDERS | CONCRETING OF BALETE-BUYASYAS-... See more | ARITAO, NUEVA VIZCAYA | Rejected | 2026-01-06 09:13:40 | Returned to Applicant | please submit application @ cs... See more | |
| 1520 | DOLE_RO2_2026-01-06_670_AJPX | MAVCON CIVIL ENGINEERING CONSTRUCTION | 40M 3 LEGGED SELF SUPPORTING T... See more | Brgy. Magapit, Lallo, Cagayan | Approved | 2026-01-06 11:06:35 | Ready for Release | Processed in 1 working days. |
| 1521 | G.T.Y. Construction | Desilting of Taan Dam Reservoi... See more | Taan, Alfonso Castaneda, Nueva Vizcaya | Rejected | 2026-01-06 13:55:38 | Returned to Applicant | please submit application @ cs... See more | |
| 1522 | G.T.Y. Construction | Clearing and Regravelling of C... See more | Brgy. Pelaway, Alfonso Castaneda, Nueva Vizcaya | Rejected | 2026-01-06 13:57:42 | Returned to Applicant | please submit application @ cs... See more | |
| 1523 | JHUERS CONSTRUCTION | CONCRETING OF BARANGAY ROAD | PUROK 4 BRGY. MAGAPUY, BAYOMBONG, NUEVA VIZCAYA | Rejected | 2026-01-06 16:00:46 | Returned to Applicant | a. The designated Safety Offic... See more | |
| 1524 | DOLE_RO2_2026-01-09_675_DKPG | 3JMS CONSTRUCTION | Rehabilitation and Improvement... See more | Roma Norte, Enrile, Cagayan | Approved | 2026-01-06 18:55:49 | Ready for Release | Processed in 3 working days. |
| 1525 | GDL Construction | Rehabilitation / Improvement o... See more | Brgy. M.H. Del Pilar to Brgy. Salvacion, Alicia, Isabela | Pending | 2026-01-07 10:11:39 | Initial Review | N/A | |
| 1526 | ISERVE CUSTOMER MANAGEMENT SOLUTIONS (ISERVE) INC. | PROPOSED ONE STOREY COMMERCIAL... See more | BRGY. TAGARAN, CUAYAN, ISABELA | Rejected | 2026-01-07 13:01:45 | Returned to Applicant | 1. CSHP TEMPLATE ( not prescri... See more | |
| 1527 | JHUERS CONSTRUCTION | REHABILITATION/ IMPROVEMENT OF... See more | SOLANO, NUEVA VIZCAYA | Rejected | 2026-01-08 08:11:17 | Returned to Applicant | please submit application @ cs... See more | |
| 1528 | JHUERS CONSTRUCTION | ROAD CONCRETING PROJECTS | BARANGAY AMPAKLENG, VILLA FLORENTINO AND VILLA AURORA, DIADI, NUEVA VIZCAYA | Rejected | 2026-01-08 08:17:00 | Returned to Applicant | please submit application @ cs... See more | |
| 1529 | JHUERS CONSTRUCTION | REHABILITATION/ IMPROVEMENT OF... See more | SOLANO, NUEVA VIZCAYA | Rejected | 2026-01-08 08:22:03 | Returned to Applicant | please submit application @ cs... See more | |
| 1530 | DOLE_RO2_2026-01-09_676_B6SE | MAVCON CIVIL ENGINEERING CONSTRUCTION | 45M 3 LEGGED SELF SUPPORTING T... See more | Brgy. Aneg, Delfin Albano, Isabela | Approved | 2026-01-08 09:02:51 | Ready for Release | Processed in 2 working days. |
| 1531 | DOLE_RO2_2026-01-09_677_RGKX | JMD-68 BUILDERS | PB-CW-2025-118 CONSTRUCTION OF... See more | SAN MARCOS, CABARROGUIS, QUIRINO | Approved | 2026-01-08 10:38:04 | Ready for Release | Processed in 1 working days. |
| 1532 | DIAMOND J BUILDERS | Package 25-38: Construction of... See more | Patul, santiago City | Rejected | 2026-01-08 11:26:35 | Returned to Applicant | NO TREATMENT ROOM | |
| 1533 | DIAMOND J BUILDERS | Package 25-38: Construction of... See more | Patul, Santiago City | Rejected | 2026-01-08 12:02:12 | Returned to Applicant | DOUBLE ENTRY | |
| 1534 | DOLE_RO2_2026-01-08_674_3F1F | DIAMOND J BUILDERS | Package 25-38: Construction of... See more | Patul, Santiago City | Approved | 2026-01-08 12:07:23 | Ready for Release | Processed in 1 working days. |
| 1535 | JAN PAOLA CONSTRUCTION INC. | REHABILITATION AND IMPROVEMENT... See more | LALOG 1, Luna, Isabela | Ongoing | 2026-01-08 13:34:08 | regional evaluator | N/A | |
| 1536 | BGS INFRATECH CONSTRUCTION | CONSTRUCTION OF BANTAY LODGE | BRGY. ROSARIO SANTIAGO CITY ISABELA | Ongoing | 2026-01-08 17:14:33 | regional evaluator | N/A | |
| 1537 | BGS INFRATECH CONSTRUCTION | CONSTRUCTION OF OPD WAITING AR... See more | BRGY. ROSARIO SANTIAGO CITY ISABELA | Pending | 2026-01-08 18:18:07 | Initial Review | N/A | |
| 1538 | JIJOMER CONSTRUCTION | REPAIR / REHAB. OF PDOHO QUIRI... See more | CABARROGUIS, QUIRINO | Ongoing | 2026-01-09 07:44:07 | regional evaluator | N/A | |
| 1539 | JIJOMER CONSTRUCTION | COMPLETION / UPGRADING / REPAI... See more | CABARROGUIS, QUIRINO | Ongoing | 2026-01-09 07:57:23 | regional evaluator | N/A | |
| 1540 | ISERVE CUSTOMER MANAGEMENT SOLUTIONS (ISERVE) INC. | PROPOSED ONE STOREY COMMERCIAL... See more | BRGY. TAGARAN, CUAYAN, ISABELA | Ongoing | 2026-01-09 08:49:04 | regional evaluator | N/A | |
| 1541 | BENSON BUILDERS | IMPROVEMENT OF TOLENTINO ROAD,... See more | BARANGAY ALLOY, KASIBU, NUEVA VIZCAYA | Rejected | 2026-01-10 08:36:18 | Returned to Applicant | please submit application @ cs... See more | |
| 1542 | MR PAULO TAN | PROPOSED WAREHOUSE | MINANTE 2, CAUAYAN CITY, ISABELA | Pending | 2026-01-16 21:44:58 | Initial Review | N/A | |
| 1543 | KNB CONSTRUCTION | PROCUREMENT OF INFRASTRUCTURE ... See more | ANNAFUNAN TUGUEGARAO CITY CAGAYAN | Pending | 2026-01-19 17:28:19 | Initial Review | N/A | |
| 1544 | KNB CONSTRUCTION | PROCUREMENT OF INFRASTRUCTURE ... See more | ANNAFUNAN TUGUEGARAO CITY CAGAYAN | Pending | 2026-01-19 17:30:58 | Initial Review | N/A | |
| 1545 | KNB CONSTRUCTION | PROCUREMENT OF INFRASTRUCTURE ... See more | ANNAFUNAN TUGUEGARAO CITY CAGAYAN | Pending | 2026-01-19 18:21:04 | Initial Review | N/A | |
| 1546 | KNB CONSTRUCTION | PROCUREMENT OF INFRASTRUCTURE ... See more | ANNAFUNAN TUGUEGARAO CITY CAGAYAN | Pending | 2026-01-19 18:23:01 | Initial Review | N/A | |
| 1547 | KNB CONSTRUCTION | PROCUREMENT OF INFRASTRUCTURE ... See more | ANNAFUNAN TUGUEGARAO CITY CAGAYAN | Pending | 2026-01-19 18:44:34 | Initial Review | N/A | |
| 1548 | KNB CONSTRUCTION | PROCUREMENT OF INFRASTRUCTURE ... See more | ANNAFUNAN TUGUEGARAO CITY CAGAYAN | Pending | 2026-01-19 18:45:43 | Initial Review | N/A | |
| 1549 | KNB CONSTRUCTION | PROCUREMENT OF INFRASTRUCTURE ... See more | ANNAFUNAN TUGUEGARAO CITY CAGAYAN | Pending | 2026-01-19 18:48:08 | Initial Review | N/A | |
| 1550 | GCPK CONSTRUCTION AND SUPPLY | UPGRADING OF ELECTRICAL SYSTEM | TUGUEGARAO CITY CAGAYAN | Pending | 2026-01-20 11:41:25 | Initial Review | N/A | |
| 1551 | DALCON CONSTRUCTION | Establishment of Slaughterhous... See more | Palabotan, Dupax del Sur, Nueva Vizcaya | Pending | 2026-01-30 12:56:14 | Initial Review | N/A | |
| 1552 | MRS. FILIPINA AGLANGAO | AMERICAN RIBS AND WINGS | SM CAUAYAN CITY, ISABELA | Pending | 2026-02-09 21:42:41 | Initial Review | N/A | |
| 1553 | MRS. FILIPINA AGLANGAO | AMERICAN RIBS AND WINGS | SM CAUAYAN CITY, ISABELA | Rejected | 2026-02-09 21:44:25 | Returned to Applicant | Double entry | |
| 1554 | TJMT CONSTRUCTION | Concreting of Road with Slope ... See more | Gattaran, Cagayan | Pending | 2026-02-13 10:25:17 | Initial Review | N/A | |
| 1555 | MR. & MRS VICENTE V. ALVAREZ | A PROPOSED CARWASH | CABARUAN, CAUAYAN CITY, ISABELA | Pending | 2026-02-24 10:12:25 | Initial Review | N/A | |
| 1556 | Primeworld SUBURB | PROPOSED 2- STOREY RESIDENCE ... See more | BLOCK 4 LOT 1 PRIMEWORLD SUBURB, PUROK NIETO BATAL SANTIAGO CITY | Pending | 2026-03-13 17:02:20 | Initial Review | N/A | |
| 1557 | SOUTH EAST HORIZON 818 CONSTRUCTION AND SUPPLY | CONSTRUCTION OF PUROK CENTRO B... See more | BINUANGAN, DUPAX DEL NORTE, NUEVA VIZCAYA | Pending | 2026-03-18 15:00:12 | Initial Review | N/A | |
| 1558 | SOUTH EAST HORIZON 818 CONSTRUCTION AND SUPPLY | CONSTRUCTION OF PUROK CENTRO B... See more | BINUANGAN, DUPAX DEL NORTE, NUEVA VIZCAYA | Pending | 2026-03-18 15:02:25 | Initial Review | N/A | |
| 1559 | No Company (Owner's Project Implementation) | PROPOSED BUNGALOW RESIDENTIAL ... See more | BLOCK 9 LOT 6 , ANAROS VILLAGE, GUZMAN JESENA, MANDURRIAO, ILOILO | Pending | 2026-03-19 00:54:32 | Initial Review | N/A | |
| 1560 | Primeworld SUBURB | PROPOSED 2- STOREY RESIDENCE ... See more | BLOCK 4 LOT 1 PRIMEWORLD SUBURB, PUROK NIETO BATAL SANTIAGO CITY | Rejected | 2026-03-25 11:01:35 | Returned to Applicant | No attached application form a... See more | |
| 1561 | Primeworld LANDHOLDINGS INC. | PROPOSED 2- STOREY RESIDENCE ... See more | BLOCK 4 LOT 1 PRIMEWORLD SUBURB, PUROK NIETO BATAL SANTIAGO CITY | Rejected | 2026-03-25 11:21:26 | Returned to Applicant | No signature of the project ow... See more |